You are on page 1of 16

29 Jul 2020

1
2
3
1. COMPANY OVERVIEW – HISTORY

[1962]

[2008]

[1936]

[ ]

[1981]

[1947]

[1984]

4
1. COMPANY OVERVIEW – GLOBAL PRODUCTION & INNOVATION

5
1. COMPANY OVERVIEW – GLOBAL PRESENCE

Charlotte, USA

Yongsan-gu, Seoul

Dalseo-gu, Daegu

Anyang-si, Gyeonggi-do

6
1. COMPANY OVERVIEW – GLOBAL PARTNERS

7
1. COMPANY OVERVIEW – GLOBAL PARTNERS

Europe Netherlands

UK
Italy

France Germany

Korea
US

Korea
Japan

China

Saudi Arabia

8
1. COMPANY OVERVIEW – BUSINESS PORTFOLIO

 PLC
 Drive
 Power Transmission  Servo
 Power Distribution  HMI
 Water Management
 Semiconductor Processing
& Other Industrial Processes
Electric Power Automation
Business Business

Transportation Smart Energy


Business Business

 Railway Signaling
 Railway Power Supply
 Photovoltaic (PV)
 Energy Storage System (ESS)
 Microgrid
 Supervisory Control & Data Acquisition (SCADA)
 Building Energy Management System (BEMS)
 Factory Energy Management System (FEMS)

9
10
1. TRANSPORTATION BUSINESS – RAILWAY SIGNALLING

Audio Frequency CTC /ATS Automatic EIS Communication


Track Circuit Train Control System

• Audio Frequency • Operation Situation Board • CBTC (SIL4) • Electrical Interlocking • GNS
Track Circuit (SIL4) • CTC Server • Automatic Train Device (SIL4) • PIS
• Digital transmitter • Communication Computer • Protection (SIL4) • Maintenance Console • PSD
• Matching/Turning • Maintenance Workstation • Automatic Train Local Control Console
Unit Operation

11
2. TRANSPORTATION BUSINESS – RAILWAY POWER SUPPLY

High Speed Rail or Mainline Electrification Metro, LRT or Mono Rail (DC 1500V or DC 750V)

AC Power Railway Substation DC Power Railway Substation

Medium Voltage Switchgear


GIS

Energy Storage System

Rectifier
C-GIS
Low Voltage Transformer
High Voltage Transformer

Scott Transformer Mold Transformer


DC Switchgear
Low Voltage Switchgear

SCADA System for Railway Power Supply

Power monitoring based on EMS platform enables monitoring of all related


facilities with an open structure and design ready for customization

12
2. TRANSPORTATION BUSINESS – RAILWAY REFERENCES

Myanmar
Bangladesh ROK Thailand

~2001
ROK
Signaling Modification: Uijeongbu Light Rail Transit ST4:
Yangon Circular
Sylhet ~ Azampur Chachoengsao ~ Leamchabang
Incheon
Thailand ROK Line 2
ROK ROK
ST1: Gyeongbu High Speed Rail Metro
Bang Sue ~ Ban Phachi Gwangju Metro Line 1 Phase2: Seoul ~ Busan Seoul Metro Line 7

2004

2006

2009
Malaysia
Double Track:
Rawang ~ Ipoh

2010
2003

2005

2007
ROK
Incheon Airport APM:
Phase 2 Bangladesh
ROK
Signaling Modification: LEGENDS
ROK Akhaura Junction Light Rail Transit:
Busan ~ Gimhae CTC
Daegu Metro Line 2
Interlocking
ROK
ROK ATC (Track Circuit Base)
Yongin Light Rail Transit
Busan Metro Line 2 CBTC(Radio Base)
Communication
Traction Power
STATUS Platform Screen Door
Commercial operation SCADA

13
2. TRANSPORTATION BUSINESS – RAILWAY REFERENCES

Track Doubling:
Laksam ~ Chinki Astana ROK
Sudokwon High Speed Rail: Canada
Suseo ~ Pyeongtaek Eastern
Bangladesh Edmonton LRT Singapore Thomson Line
13 Station Modernization:
ROK
Joydebpur ~ Mymensingh
HEAMU High Speed Rail: Thailand
EIS Signaling: Philippines
Republic of Korea

2012

2014

2016
ATC/ATP/ATS for 430km
Bangkok ~ Chittlada Manila Metro Line 7
Honam High Speed Rail
Phase 1:
Osong ~ Gwangju
2017

Taiwan

2013

2015
2011

Taiwan
Thailand
EIS Signaling: EIS Signaling:
Taitung ~ Zhiben Taitung Depot
ST5:Chachangsao ~ Kaengkoi
ROK Bangladesh
Bangladesh
Incheon Int’l Airport Transit: Bangladesh Signalling Modernization:
Phase 3 Akhaura-Laksam
Signalling Modernization:
Signalling & LEGENDS
Chinki ~ Chittagong
Comm ROK CTC
(Tongi ~ Bazar) ROK
Daebul Line CBTC
Busan Metro Line 2 Interlocking
ATC (Track Circuit Base)
CBTC(Radio Base)
Communication
STATUS Traction Power
Commercial operation Platform Screen Door
On-going SCADA

14
2. TRANSPORTATION BUSINESS – RAILWAY REFERENCES

Signalling Modernization: Montreal REM


Dohazari ~ Cox’s Bzar Thailand
ST9:
Bangladesh Republic of Korea Map Kabao – Tanon Chira
Kyungbu HSL Phase 1
Republic of Korea Rehabilitation Thailand

Shinlim LRT ST8: Lopburi-Paknampho

2018

2019

2020
Indonesia
Republic of Korea Egypt
Jabodebek Line Cairo Monorail
Seoul L7 2nd ETN
NCC, 6th of October Line

Bangladesh

2019
Signalling Modernization:
Dhaka ~ Narayanganj

Taiwan
Tainan Underground
Signalling
LEGENDS
Taiwan CTC
Lijiaxi & Zhiben signal Interlocking
ATC, ATP/ATO
CBTC(Radio Base)
Communication
Traction Power
STATUS
Platform Screen Door
Commercial operation SCADA
On-going

15
16

You might also like