You are on page 1of 4

Scope of Work for Replacement of Zeit Bay 3.

3 Switchgear DC Dual Battery


Chargers

1- Introduction:
Suez Oil Company requires a dual DC battery charger with supply 380 V AC and output voltage 110 V DC to
feed 3.3 KV switchgear and their protection relays, As difficulties experienced to obtain spare parts or to repair
defective parts of old control as most of parts are obsolete or no longer supported, a decision had been taken to
replace the old dual DC battery charger with its batteries by new one (attached name plate).

2- General Instructions:
 Units of measurement shall be according to SI (Standard International).
 Location of battery enclosure shall provide enough space for maintenance and cooling purpose and
will be outside the building and supplied by the supplier.
 All the terminals and cables shall be tagged and use insulated cables lugs.
 Power supply shall be 380 AC – 50 H through Input and output circuit breakers.
 The battery charger origin must be USA, Europe or Japan only.
 The vendor’s offer shall include and not limited to the following information:
 Written description of the proposed battery charger system.
 Catalogue details and model number of system components.
 Outline drawings, (Cabinet front layout and equipment arrangements).
 Wiring schematic drawings.
 Dimension and weight of the system equipment.
 SUCO’s approval of vendor’s drawings and/or component specifications will not relieve vendor from
his responsibility for total system guarantee.
 Where any provisions of this specification are in conflict with the specific requirements documents
attached so a query shall be referred to SUCO for clarification.
 All documentation, nameplates and labels shall be in the English language.
 Any deviation from this specification or from any of the requirements of the Inquiry shall be clearly
defined by the vendor in his quotation.
 The installation, commissioning & start-up for the dual battery charger will be in the contractor
scope.

3- Scope of Work and Supply:


The Scope of Engineering and equipment supply (Turn Key job) shall cover and not limited to the following:

 Supply of industrial battery charger as per the specification indicated in item no. “3.1”.
 Supply the battery banks with its supports, connection cables, etc…
 Install the new battery charger with its battery bank and make all the tests required according to FAT
& SAT procedure.
 The bidder to submit the certificate of approval indicating the Quality Management System and
Quality Assurance System he follows for design , manufacturing , servicing ( FAT and SAT testing ,
installation , commissioning , starting-up , malfunctions problems troubleshooting , …etc. ) and after
sales services.
 The job execution is under the Turn Key job basis. No stand-by rate will be applied for any reason.
 Submit the entire drawings and system document.
 On job training for one day for “SUCO “staff.

3.1- Battery charger Specifications:


The system shall comprise the following assemblies.
Scope of Work for Replacement of Zeit Bay 3.3 Switchgear DC Dual Battery
Chargers

 INPUT
Both chargers are set to the mains input as shown below. Adjustments may be made by tapping on the main
transformer T1.
INPUT VOLTAGE: - 380V + 10% VARIATION, 50 HZ, 3 PHASE, 4 WIRE.
 CHARGERS
Each charger is a 110 VDC 10A consist of a double wound mains input transformer, a full wave silicon
bridge rectifier, AC and DC fuse protection. Both chargers are open and short circuit proof and have a battery
low volts protection circuit to prevent a flat battery receiving maximum charge initially which could result in
buckled plates.
FLOAT VOLTAGE: - Both chargers set to 130V DC
BOOST VOLTAGE: - Both chargers set to 147V DC
MAXIMUM OUTPUT CURRENT:- Both chargers set to 10A DC @ 92V DC.
Output voltage limits will be maintained for a ± 10% variation in mains voltage and the current is set to 100%
of rated output.
 BATTERIES
Each battery set, consisting of 92 x 33Ah Nickel Cadmium cells, is situated on a double row, double tier stand
constructed from impregnated Iroko hardwood and coated with polyurethane varnish for protection against
electrolyte spillage. Each battery and stand is supplied with a fuse box which contains the battery fuses. Each
battery set is supplied complete with all necessary links and fittings, filler nozzles, instruction cards,
hydrometer, thermometer and miring equipment.
 DISTRIBUTION
The DC distribution consists of five double pole fused output ways. Each way has 32A rated fuses and are to
be connected as below:-
Terminal Number OUTPUT DESIGNATION
15 + CLOSING AND TRIPPING
16 - 3.3 KV SWITCHBOARD
27 + CONTROL PANEL
28 -
21 + TRIPPING MCC 101 A/B
22 -
23 + TRIPPING MCC 102
24 -

4. Documentation Requirements:
4.1. Documentation to be submitted with Quotation:
• Description of the proposed system.
• Outline drawings, (panel front layout equipment arrangement within panel).
• Overall dimensions and weight.
• System component specifications and catalogues.
4.2. Documentation required with the equipment:
Vendor shall provide three copies (Hard and soft) of the following documentation as a minimum:
• Battery charger and batteries panel layout and general arrangement.
• Wiring diagrams.
• Mounting and external connections details.
• Drawings and catalogues of Battery charger and any other supplied equipment.
• Installation, operation and maintenance manuals.
Scope of Work for Replacement of Zeit Bay 3.3 Switchgear DC Dual Battery
Chargers

• FAT and SAT test reports.


• List of two years spare parts.
• Three copies of as built drawings, operating manuals, maintenance manual in folders as well as spare parts
list are required (With the equipment).
• Three CD including full scan of the above document.
• All software's with their license will be used in new Battery charger.
5. Factory Acceptance Test:
• A factory acceptance test (FAT) shall be performed according to Vendor test procedures.
• A copy of the test procedure shall be sent to SUCO for approval prior to starting panel fabrication. The test
shall include the battery charger and battery.
6. Site Acceptance Test:
• The site acceptance test (SAT) shall be done after system installation, commissioning, including actual
approved SAT procedure.
• A copy for test procedure shall be sent to SUCO for approval before system delivery, prior to commissioning
the system.
• The SAT test report shall be included in the service engineer site report as well as in the final system
documentation.
• Any punch list occurred during the SAT including rectifying any found defect or problem and troubleshooting any
found malfunction shall be cleared before the system handed over.
7. Guarantee:
• All parts shall be guaranteed to operate under the specified conditions for a period of 12 months from date of initial
operations limited to 18 months from date of equipment receiving at SUCO.
• Warranty certificate to be provided for all equipment included in the system either it is direct supply from the main
or sub-contractor and shall valid for one year as a minimum.
8. Delivery Terms:
- The contractor is responsible to deliver the new battery charger on Z/B field.
- Delivery time for the supplied system materials will not to be more than ten (10) weeks.
9-Contractor Main Obligations:
 Contractor will be complete responsible for dismantling the existing old battery charger and then installation
,commissioning of the new supplied control system with all of its associated and linked components.
 The contractor will provide specialist expert supervisor and skilled technician.
 Any needed machining, modifications or adaptation processes to be carried out of insertion, mounting or
installation for the battery charger will be indicated to in the bidder’s offer, subjected to SUCO approval and
its execution.
 The contractor will supply all required materials, equipment, devices needed for the job and will provide all
special tools to carry out the replacement job that guarantees a good performance.
 Special tools transportation to Zeit Bay field will be the contractor responsibility (if needed).
 A proper packing have to be considered for all supplied materials including equipment, apparatuses, devices ,
etc. … where to be encased in appropriate wooden boxes and pallet including appropriate fillers for collision
impact absorption.
 The contractor will comply with SUCO HSE regulations for such works and will perform the job activities as
per SUCO H.S.E.Q rules and regulations.
 The contractor will be responsible of supplying his representatives with the proper and suitable Personal
Protective Equipment (PPE) for his labour safety.
 The contractor to complete the job within 6 months from receiving the awarding notification fax.
 The contractor to submit the field maintenance staff with a detailed daily report of work activities progress in
addition to the final report after the work completion and is requested to issue the job total completion
certificate.
10- Project Time Frame:
 Delivery time for the supplied system materials within 10 weeks from the date of receiving SUCO’s fax
of award wherever the location of delivery point.
Scope of Work for Replacement of Zeit Bay 3.3 Switchgear DC Dual Battery
Chargers

 Job commencement will be within one month from receiving (SUCO̕s) notification fax of materials
receiving at site and site readiness for commencement with services activities.
 The duration of site all services activities not to exceed 10 days.
 Each Bidder to submit his own mile-stone plan for the whole job based on the above stated project time
frame.
11- SUCO Obligations:
 SUCO will provide all available technical data (technical specifications, operation, functions,
catalogues and data sheets) concerning the existing system.
 Transportation and lifting for all supplied equipment, materials, devices, consumables, etc. …., inside the
field.
 SUCO will provide field internal transportation for the contractor’s involved representatives.
 SUCO will provide site accommodation for contractor’s involved representatives.
 SUCO will conduct a safety induction and orientation for the contractor’s involved
representatives.
 SUCO will provide first aid for the contractor’s representatives if needed.
 SUCO will provide limited electrical power supply for the contractor’s equipment and tools on condition
that the bidder has to determine in his offer the total electrical power needed for energizing such
equipment and tools to prepare for the suitable power supply.
 All work permits for contractor’s crew will be issued by SUCO concerned staff.

Original DC Battery Charger name plate