You are on page 1of 1

·

PIER CAP TOP LVL.


(AS PER GAD)
·

PIER CAP BOTTOM LVL.


(AS PER GAD)
REINFORCEMENT SCHEDULE (CIRCULAR PIER)

BAR NO. LENGTH TOTAL WEIGHT/ TOTAL EST


SHAPE DIA. OF BAR REMARKS SPACING IN LENGTH R. MT. WEIGHT WT. IN WT. IN
MRKD. OF BAR OF BAR METER IN IN MT. IN KG. KG./CUM KG./CUM
METER

CIRCULAR PIER
1 1

TOTAL

2
2

FOUNDATION
TOTAL

NOTES:
REINF. DETAILS OF PIER

SECTION 2-2 SECTION 1-1

1 1

RAFT PLAN
REINFORCEMENT

PROJECT :

2 2 CONSTRUCTION OF 2 LANE ROAD OVER BRIDGE IN LIEU OF LC-61 AT DHORAJI


ROAD

DRG. NO: SCALE


CIRCULAR PIER-REINFORCEMENT-SHEET 2 OF 4 AS SHOWN

DRAWING DETAILS : -
REINFORCEMENT DRAWING OF OPEN FOUNDATION AND
CIRCULAR PIER-RJ16 TO RJ26, AND LP4 TO LP10

PRINCIPAL CLIENT:

CHIEF OFFICER
JETPUR NAVGADHA
NAGARPALIKA
CONSULTANT:

JINDALS CONSORTIUM
STRUCTURAL ENGINEERS, HIGHWAY & BRIDGE
DESIGNERS, SURVEYOR & SOIL INVESTIGATORS
REINF. DETAILS OF PIER ADDRESS:- MANTHAN, 24-C NIVIDETA NAGAR HOUSING SOCIETY,
OPP. SHIVALIK-8,RAJKOT-360005 (GUJARAT)
MOB.: 91-8320693151 , 9408789038
EMAIL :- jindalsrjt@gmail.com,manthanvats@gmail.com