GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
No. 2022/CE-IV/Misc New Delhi, dated 10.10.2022
Principal Chief Engineer,
CR, ECoR, NCR, SCR, SER
SECR, SR, WCR &WR.
‘Sub: -Review Meeting of ROB, RUB and LC Elimination Works (PH-30).
A review meeting was held under the Chairmanship of CRB & CEO on Status of
ROBs, RUBs & LC elimination works on 04.10.2022. In the meeting, the progress of
works assigned to PSUs viewed seriously. Substantial time has already elapsed after
work assigned to PSUs and progresses of work are generally very poor
In view of above, a review meeting through VC to be chaired by PED/Bridge is to be
‘scheduled on 11.10.2022 at 11:30 Hrs for work assigned to PSUs. Meeting must be
attended by CPD/BW, CE/RSW-RC (coordinating Road Safety Works) and concerned
key representative PSUs. PPT is required to be shared by concern Zonal Railway
during meeting with full details and reasons thereof.
Please direct the concerned officials to attend the meeting through VC with complete
details. The link will be sent separately in due course.
alle
ra isi
Director, CE (B&S)
Railway Board
Copy to: - 1). CPD/BW and CE/RSW-RC of above Railways for information necessary
action please
2). Dir Tele/RB for information and arrangement of VC link