You are on page 1of 1
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS (RAILWAY BOARD) No. 2022/CE-IV/Misc New Delhi, dated 10.10.2022 Principal Chief Engineer, CR, ECoR, NCR, SCR, SER SECR, SR, WCR &WR. ‘Sub: -Review Meeting of ROB, RUB and LC Elimination Works (PH-30). A review meeting was held under the Chairmanship of CRB & CEO on Status of ROBs, RUBs & LC elimination works on 04.10.2022. In the meeting, the progress of works assigned to PSUs viewed seriously. Substantial time has already elapsed after work assigned to PSUs and progresses of work are generally very poor In view of above, a review meeting through VC to be chaired by PED/Bridge is to be ‘scheduled on 11.10.2022 at 11:30 Hrs for work assigned to PSUs. Meeting must be attended by CPD/BW, CE/RSW-RC (coordinating Road Safety Works) and concerned key representative PSUs. PPT is required to be shared by concern Zonal Railway during meeting with full details and reasons thereof. Please direct the concerned officials to attend the meeting through VC with complete details. The link will be sent separately in due course. alle ra isi Director, CE (B&S) Railway Board Copy to: - 1). CPD/BW and CE/RSW-RC of above Railways for information necessary action please 2). Dir Tele/RB for information and arrangement of VC link

You might also like