CE168P – 2A FINAL PRESENTATION (11TH WEEK)

PROJECT PORTFOLIO
CONTENT OF PRESENTATION
I. Project Background
a. Description
b. Location
c. Objectives
d. Team
II. Knowledge Area
a. Integration Management
b. Scope Management
c. Schedule Management
d. Cost Management
e. Procurement Management
f. Quality Management
g. Risk Management
h. Resource Management
i. Stakeholders Management
j. Communication Management
III. Project Details
a. Project Schedule
b. Project Cost
c. Resource Loading
IV. Project Drawing
a. SDP, Vicinity and Perspective
b. Project Details
c. Specialty Work
V. Project Methodologies
a. Construction Method
b. Quality Control
c. Safety Program
General Instruction:
1. Presentation proper is limited to 30 minutes discussion and 10 minutes Q and A.
2. Group members shall be present during the presentation with their cameras on mode.
3. The copy of Progress Presentation (Powerpoint) shall be uploaded in the FB Page of the
class.
Schedule of Presentation
For your information and guidance.

ENGR. GEOFFREY L. CUETO


Instructor