2 Criteria, sub-criteria, and point system for the evaluation of Full Technical
Proposals are:
At least two references on the work of the same nature (Study of Drinking water
supply) with good completion certificates accompanied with notified contracts
whose value is between and greater than [15-35 million Frw each reference]
executed in last five years [2021, 2020, 2019, 2018, 2017].
(15 Marks).
N.B The deviation of the requirement will affect the Bidder to lose marks
and the methodology should be prepared referring to the duration of the
project.
4° Keys staff: 55 Marks
He/she must have participated at least in three (3) similar projects as site Engineer
with proof/certificate of completion :(10 Marks).
She/he must have a bachelors (A0) or a master’s degree in water resources and
environmental management (proven by notarized degree or equivalence for those
who studied in foreign country, Minimum of 5 years of work experience in
environmental and social impacts assessments, or environmental and social,
management plan for construction projects. She/he must be registered with
RAPEP as a lead expert proven by a valid practicing Certificate:
Note:
The key personnel must have the good detailed C.V, updated and signed by the
holder with the notified copy of certification of their qualification as stated above,
copy of Identity card and certificate of availability.
Having a written agreement with one recognized laboratory by RSB inspection tools (Plate
test, tape measure, laser meter, wheel meter, concrete structure scan “GSSI”, Poll static
penetrometer test, cone penetration test); and Surveying equipment (total stations, GPS);
The weights that will be used in combination of technical and financial scores are
as follows:
5.7 The formula for determining the financial scores is the following:
Sf = 100 x Fm / F, in which Sf is the financial score, Fm is the lowest price and F
the price of the proposal under consideration.
[Comments in brackets [ ] provide guidance to the short-listed Consultants for the preparation of
their Technical Proposals; they should not appear on the Technical Proposals to be submitted.]
Refer to Reference Paragraph 3.4 of the Data Sheet for format of Technical Proposal to be
submitted, and paragraph 3.4 of Section 2 of the RFP for Standard Forms required and
number of pages recommended.
A Consultant’s Organization
B Consultant’s Experience
TECH-4 Description of the Approach, Methodology and Work Plan for Performing the
Assignment