You are on page 1of 33

TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES

Ayala Blvd., Ermita, Manila


COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS
FOOTING BEAMS
TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
LONGITUDINAL LONGITUDINAL LONGITUDINAL LONGITUDINAL LONGITUDINAL LONGITUDINAL LONGITUDINAL LONGITUDINAL LONGITUDINAL LONGITUDINAL LONGITUDINAL LONGITUDINAL LONGITUDINAL LONGITUDINAL LONGITUDINAL

GRID
BARS

TB-1 0.240 0.060 7.400 8.000 1 4 4 20


B-D 5

GRID
BARS

0.240 0.060 7.400 8.000 1 4 4 20


A-B 3

F GRID
BARS

O 0.240 0.060 7.400 8.000 1 4 4 20


1-3 B
U
N
D GRID
BARS

0.240 0.060 7.400 8.000 1 4 4 20


A 1-3 C
T
TB-2
I
O GRID
BARS

0.240 0.060 4.240 4.840 1 4 4 20


N 3-4 B

GRID
BARS

0.240 0.060 5.000 5.600 1 4 4 20


4-5 B

GRID
BARS

0.240 0.060 5.320 5.920 1 4 4 20


C-D 4

GRID
BARS

0.240 0.060 7.400 8.000 1 4 4 20


A-B 5

GRID
BARS

0.240 0.060 7.400 8.000 1 4 4 20


A-B 1

GRID
BARS

0.240 0.060 7.400 8.000 1 4 4 20


B-D 1
F
O
U GRID
BARS

0.240 0.060 7.400 8.000 1 4 4 20


N 1-3 A
D
TB-3
A
T GRID
BARS

0.240 0.060 7.400 8.000 1 4 4 20


I 1-3 D
O
N
GRID
BARS

0.240 0.060 4.240 4.840 1 4 4 20


3-4 A

GRID
BARS

0.240 0.060 4.240 4.840 1 4 4 20


3-4 D

GRID
BARS

0.240 0.060 5.000 5.600 1 4 4 20


4-5 A

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS
BEAMS TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH
TOTAL PIECES
NO. OF
ITEM TO BE ESTIMATED FIGURE LENGTH PER BAR (m) STRUCTURAL
NO. OF NO. OF DIAMETER
TOTAL OF BARS
PER BAR
LENGTH PER
PIECES
ITEM TO BE ESTIMATED FIGURE a b c MEMBER
STRUCTURAL BARS
NO. OF OF(mm)
BARS
(m)
PER BAR MEMBER
PER
a b c MEMBER BARS (mm)
(m) MEMBER
CONTINUOUS

G
GR GRID
GRID
BARSBARS

0.240 0.060 4.240 4.840 1 4 4 20


CONTINUOUSCONTINUOUS

RO 3-4 A
T G-1 A-B 0.240 0.060 1.900 2.500 1 4 4 20
OU
O
UN 0-1
ND GRID
F
BARSBARS

DF 3-4 0.240 0.060 4.240 4.840 1 4 4 20


CONTINUOUSCONTINUOUS

O GRID
LU A-B 0.240 0.060 1.900 2.500 1 4 4 20
FO A-1
R
LO
T G-2
OR GRID
BARSBARS

H G-5 0.240 0.060 4.240 4.840 1 4 4 20


CONTINUOUSCONTINUOUS

O GRID
3-4 B
T
RO 0.240 0.060 1.900 2.500 1 4 4 20
F B-1
L
FR
L O
O GRID
BARSBARS

0.240 0.060 4.240 4.840 1 4 4 20


CONTINUOUSCONTINUOUS

O GRID
3-4 C
OO 0.240 0.060 7.400 8.000 1 4 4 20
FR
O A-B 0
RD
E GRID
BARSBARS

0.240 0.060 4.240 4.840 1 4 4 20


CONTINUOUSCONTINUOUS

C
GRID
3-4 E
K G-3 0.240 0.060 1.980 2.580 1 4 4 20
B-C 4
G
R
GRID
BARSBARS

0.240 0.060 5.000 5.600 1 8 8 20


CONTINUOUSCONTINUOUS

O GRID
4-5 A
G 0.240 0.060 1.980 2.580 1 4 4 20
U
R B-C 5
O
N
U GRID
D
BARSBARS

4-5 0.240 0.060 5.000 5.600 1 8 8 20


CONTINUOUSCONTINUOUS

N
D GRID
A-B 0.240 0.060 3.650 4.250 1 8 8 20
FF 1-3 A
LL
O GRID
BARSBARS

O 0.240 0.060 5.000 5.600 1 8 8 20


CONTINUOUSCONTINUOUS

O GRID
4-5 B
OR 0.240 0.060 3.650 4.250 1 8 8 20
1-3 A
R G-6
T
O GRID
BARSBARS

T 0.240 0.060 5.000 5.600 1 8 8 20


CONTINUOUSCONTINUOUS

GRID
4-5 C
O
R 0.240 0.060 3.650 4.250 1 8 8 20
O 1-3 B
O
RF G-4
GRID
BARSBARS

O 0.240 0.060 5.320 5.920 1 8 8 20


CONTINUOUSCONTINUOUS

D GRID
C-E 4
O 0.240 0.060 3.650 4.250 1 8 8 20
E 1-3 B
FC
K GRID
BARSBARS

C-E 0.240 0.060 5.320 5.920 1 8 8 20


CONTINUOUS

D
GRID
E 3-4 0.240 0.060 3.650 4.250 1 8 8 20
1-3 E
C
K
CONTINUOUS

GRID
BARS

0.240 0.060 3.650 4.250 1 8 8 20


1-3 E

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CONTINUOUS

GRID
BARS

0.300 0.150 7.400 8.300 1 4 4 25


A-B 5
G
R
CONTINUOUS

O GRID
BARS

U 0.300 0.150 7.400 8.300 1 4 4 25


N
A-B 3
D
CONTINUOUS

F GRID
BARS

0.300 0.150 7.400 8.300 1 4 4 25


L A-B 1
O
O
CONTINUOUS

R
GRID
BARS

G-7 0.300 0.150 7.400 8.300 1 4 4 25


T B-E 3
O
CONTINUOUS

R GRID
BARS

O
0.300 0.150 7.400 8.300 1 4 4 25
B-E 1
O
F
GRID
CONTINUOUS
BARS

D 1-3 0.300 0.150 7.400 8.300 1 4 4 25


E A-B
C
K
CONTINUOUS

GRID
BARS

0.300 0.150 7.400 8.300 1 4 4 25


1-3 D
CONTINUOUS

G
GRID
BARS

0.300 0.150 7.400 8.300 1 4 4 25


R A-B 4
O
U R
GRID
CONTINUOUS

N O
BARS

D O A-B 0.300 0.150 7.400 8.300 1 4 4 25


F 3-4
F G-8
L D
CONTINUOUS

O E GRID
BARS

0.300 0.150 7.400 8.300 1 4 4 25


O C A-B 2
R K
CONTINUOUS

T GRID
BARS

O 0.300 0.150 7.400 8.300 1 4 4 25


B-E 2

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS
FOOTING BEAMS
TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ MIDSPAN CUT BARS @ MIDSPAN CUT BARS @ MIDSPAN CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 0.824 1.074 1 6 6 20


BOTTOM
BARS

0.240 0.060 0.824 1.074 1 6 6 20


TOP BARS

0.240 0.060 0.974 1.224 1 6 6 20


BOTTOM
BARS

0.240 0.060 0.974 1.224 1 6 6 20


TOP BARS

0.935 - - 0.935 1 4 4 20
BOTTOM
BARS

0.935 - - 0.935 1 4 4 20
F
O
TOP BARS

U
N 1.245 - - 1.245 1 4 4 20
TB-1
D
GRID
A
B-D 5
BOTTOM

T
BARS

1.245 - - 1.245 1 4 4 20
I
O
N
TOP BARS

1.009 - - 1.009 1 4 4 20
BOTTOM
BARS

1.009 - - 1.009 1 4 4 20
TOP BARS

1.394 - - 1.394 1 4 4 20
BOTTOM
BARS

1.394 - - 1.394 1 4 4 20
TOP BARS

1.977 - - 1.977 1 4 4 20
BOTTOM
BARS

1.977 - - 1.977 1 4 4 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ MIDSPAN CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 2.238 2.488 2 6 12 20


F
O
BOTTOM

U
BARS

N 0.240 0.060 2.238 2.488 2 6 12 20


TB-2
D
GRID
A
A-B 3
TOP BARS

T
3.966 - - 3.966 1 4 4 20
I
O
N
BOTTOM
BARS

3.966 - - 3.966 1 4 4 20
TOP BARS

0.240 0.060 1.373 1.623 1 6 6 20


BOTTOM
BARS

0.240 0.060 1.373 1.623 1 6 6 20


TOP BARS

0.240 0.060 1.376 1.626 1 6 6 20


BOTTOM
BARS

0.240 0.060 1.376 1.626 1 6 6 20


F
O
TOP BARS

U
N 1.892 - - 1.892 1 4 4 20
TB-2
D
GRID
A
1-3 B
BOTTOM

T
BARS

1.892 - - 1.892 1 4 4 20
I
O
N
TOP BARS

2.164 - - 2.164 1 4 4 20
BOTTOM
BARS

2.164 - - 2.164 1 4 4 20
TOP BARS

1.899 - - 1.899 1 4 4 20
BOTTOM
BARS

1.899 - - 1.899 1 4 4 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 2.256 2.506 2 6 12 20


F
O
BOTTOM

U
BARS

N 0.240 0.060 2.256 2.506 2 6 12 20


TB-2
D
GRID
A
1-3 C
TOP BARS

T
4.370 - - 4.370 1 4 4 20
I
O
N
BOTTOM
BARS

4.370 - - 4.370 1 4 4 20
TOP BARS

0.240 0.060 1.543 1.793 2 6 12 20


F
O
BOTTOM

U
BARS

N 0.240 0.060 1.543 1.793 2 6 12 20


TB-2
D
GRID
A
3-4 B
TOP BARS

T
2.238 - - 2.238 1 4 4 20
I
O
N
BOTTOM
BARS

2.238 - - 2.238 1 4 4 20
TOP BARS

0.240 0.060 1.543 1.793 2 6 12 20


F
O
BOTTOM

U
BARS

0.240 0.060 1.543 1.793 2 6 12 20


N
TB-2
D
GRID
A
4-5 B
TOP BARS

T
2.238 - - 2.238 1 4 4 20
I
O
N
BOTTOM
BARS

2.238 - - 2.238 1 4 4 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ MIDSPAN CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 0.571 0.821 1 6 6 20


BOTTOM
BARS

0.240 0.060 0.571 0.821 1 6 6 20


TOP BARS

0.240 0.060 0.957 1.207 1 6 6 20


BOTTOM
BARS

0.240 0.060 0.957 1.207 1 6 6 20


F
O
TOP BARS

U
N 1.009 - - 1.009 1 4 4 20
TB-2
D
GRID
A
C-D 4
BOTTOM

T
BARS

1.009 - - 1.009 1 4 4 20
I
O
N
TOP BARS

1.377 - - 1.377 1 4 4 20
BOTTOM
BARS

1.377 - - 1.377 1 4 4 20
TOP BARS

1.936 - - 1.936 1 4 4 20
BOTTOM
BARS

1.936 - - 1.936 1 4 4 20
TOP BARS

0.240 0.060 2.238 2.488 2 6 12 20


F
O
BOTTOM

U
BARS

N 0.240 0.060 2.238 2.488 2 6 12 20


TB-3
D
GRID
A
A-B 5
TOP BARS

T
3.966 - - 3.966 1 4 4 20
I
O
N
BOTTOM
BARS

3.966 - - 3.966 1 4 4 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 2.241 2.491 2 6 12 20


F
O
BOTTOM

U
BARS

0.240 0.060 2.241 2.491 2 6 12 20


N
TB-3
D
GRID
A
A-B 1
TOP BARS

T
3.974 - - 3.974 1 4 4 20
I
O
N
BOTTOM
BARS

3.974 - - 3.974 1 4 4 20
TOP BARS

0.240 0.060 2.241 2.491 2 6 12 20


F
O
BOTTOM

U
BARS

0.240 0.060 2.241 2.491 2 6 12 20


N
TB-3
D
GRID
A
B-D 1
TOP BARS

T
3.974 - - 3.974 1 4 4 20
I
O
N
BOTTOM
BARS

3.974 - - 3.974 1 4 4 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ MIDSPAN CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.376 1.626 1 6 6 20


BOTTOM
BARS

0.240 0.060 1.376 1.626 1 6 6 20


TOP BARS

0.240 0.060 1.376 1.626 1 6 6 20


BOTTOM
BARS

0.240 0.060 1.376 1.626 1 6 6 20


F
O
TOP BARS

U
1.899 - - 1.899 1 4 4 20
N
TB-3
D
GRID
A
1-3 A
BOTTOM

T
BARS

1.899 - - 1.899 1 4 4 20
I
O
N
TOP BARS

0.380 - - 0.380 1 4 4 20
BOTTOM
BARS

0.380 - - 0.380 1 4 4 20
TOP BARS

1.899 - - 1.899 1 4 4 20
BOTTOM
BARS

1.899 - - 1.899 1 4 4 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ MIDSPAN CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.376 1.626 1 6 6 20


BOTTOM
BARS

0.240 0.060 1.376 1.626 1 6 6 20


TOP BARS

0.240 0.060 1.376 1.626 1 6 6 20


BOTTOM
BARS

0.240 0.060 1.376 1.626 1 6 6 20


F
O
TOP BARS

U
1.899 - - 1.899 1 4 4 20
N
TB-3
D
GRID
A
1-3 D
BOTTOM

T
BARS

1.899 - - 1.899 1 4 4 20
I
O
N
TOP BARS

0.380 - - 0.380 1 4 4 20
BOTTOM
BARS

0.380 - - 0.380 1 4 4 20
TOP BARS

1.899 - - 1.899 1 4 4 20
BOTTOM
BARS

1.899 - - 1.899 1 4 4 20
TOP BARS

0.240 0.060 1.524 1.774 2 6 12 20


F
O
BOTTOM

U
BARS

0.240 0.060 1.524 1.774 2 6 12 20


N
TB-3
D
GRID
A
3-4 A
TOP BARS

T
2.253 - - 2.253 1 4 4 20
I
O
N
BOTTOM
BARS

2.253 - - 2.253 1 4 4 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.524 1.774 2 6 12 20


F
O
BOTTOM

U
BARS

0.240 0.060 1.524 1.774 2 6 12 20


N
TB-3
D
GRID
A
3-4 D
TOP BARS

T
2.253 - - 2.253 1 4 4 20
I
O
N
BOTTOM
BARS

2.253 - - 2.253 1 4 4 20
TOP BARS

0.240 0.060 1.641 1.891 2 6 12 20


F
O
BOTTOM

U
BARS

0.240 0.060 1.641 1.891 2 6 12 20


N
TB-3
D
GRID
A
4-5 A
TOP BARS

T
2.534 - - 2.534 1 4 4 20
I
O
N
BOTTOM
BARS

2.534 - - 2.534 1 4 4 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS
BEAMS
TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 0.500 0.750 2 3 6 20

G
R
BOTTOM

O
BARS

U
G-1 0.240 0.060 0.500 0.750 2 2 4 20
N
D GRID
A-B
TOP BARS

F
0-1
L 1.200 - - 1.200 1 2 2 20
O
O
R
BOTTOM
BARS

1.200 - - 1.200 1 2 2 20
TOP BARS

0.240 0.060 0.981 1.231 2 4 8 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 0.981 1.231 2 2 4 20


N G-2
D
GRID
A-1
TOP BARS

F
L 1.035 - - 1.035 1 2 2 20
O
O
R
BOTTOM
BARS

1.035 - - 1.035 1 2 2 20
TOP BARS

0.240 0.060 0.981 1.231 2 4 8 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 0.981 1.231 2 2 4 20


N G-2
D
GRID
B-1
TOP BARS

F
L 1.035 - - 1.035 1 2 2 20
O
O
R
BOTTOM
BARS

1.035 - - 1.035 1 2 2 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.875 2.125 2 4 8 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.875 2.125 2 2 4 20


N G-3
D
GRID
A-B 0
TOP BARS

F
L 4.500 - - 4.500 1 2 2 20
O
O
R
BOTTOM
BARS

4.500 - - 4.500 1 2 2 20
TOP BARS

0.240 0.060 0.801 1.051 2 4 8 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 0.801 1.051 2 2 4 20


N G-3
D
GRID
B-C 4
TOP BARS

F
L 0.963 - - 0.963 1 2 2 20
O
O
R
BOTTOM
BARS

0.963 - - 0.963 1 2 2 20
TOP BARS

0.240 0.060 0.801 1.051 2 4 8 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 0.801 1.051 2 2 4 20


N G-3
D
GRID
B-C 5
TOP BARS

F
L 0.963 - - 0.963 1 2 2 20
O
O
R
BOTTOM
BARS

0.963 - - 0.963 1 2 2 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.350 1.600 4 3 12 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.350 1.600 4 3 12 20


N G-4
D
GRID
1-3 A
TOP BARS

F
L 1.920 - - 1.920 2 3 6 20
O
O
R
BOTTOM
BARS

1.920 - - 1.920 2 3 6 20
TOP BARS

0.240 0.060 1.350 1.600 4 3 12 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.350 1.600 4 3 12 20


N G-4
D
GRID
1-3 B
TOP BARS

F
L 1.920 - - 1.920 2 3 6 20
O
O
R
BOTTOM
BARS

1.920 - - 1.920 2 3 6 20
TOP BARS

0.240 0.060 1.350 1.600 4 3 12 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.350 1.600 4 3 12 20


N G-4
D
GRID
1-3 E
TOP BARS

F
L 1.920 - - 1.920 2 3 6 20
O
O
R
BOTTOM
BARS

1.920 - - 1.920 2 3 6 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.498 1.748 2 6 12 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.498 1.748 2 3 6 20


N G-5
D
GRID
3-4 A
TOP BARS

F
L 2.274 - - 2.274 1 3 3 20
O
O
R
BOTTOM
BARS

2.274 - - 2.274 1 4 4 20
TOP BARS

0.240 0.060 1.085 1.335 2 6 12 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.085 1.335 2 3 6 20


G-5
N
D GRID
3-4
TOP BARS

F
A-B
L 2.604 - - 2.604 1 3 3 20
O
O
R
BOTTOM
BARS

2.604 - - 2.604 1 4 4 20
TOP BARS

0.240 0.060 1.498 1.748 2 6 12 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.498 1.748 2 3 6 20


N G-5
D
GRID
3-4 B
TOP BARS

F
L 2.274 - - 2.274 1 3 3 20
O
O
R
BOTTOM
BARS

2.274 - - 2.274 1 4 4 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.566 1.816 2 6 12 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.566 1.816 2 3 6 20


N G-5
D
GRID
3-4 C
TOP BARS

F
L 2.439 - - 2.439 1 3 3 20
O
O
R
BOTTOM
BARS

2.439 - - 2.439 1 4 4 20
TOP BARS

0.240 0.060 1.498 1.748 2 6 12 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.498 1.748 2 3 6 20


N G-5
D
GRID
3-4 E
TOP BARS

F
L 2.274 - - 2.274 1 3 3 20
O
O
R
BOTTOM
BARS

2.274 - - 2.274 1 4 4 20
TOP BARS

0.240 0.060 1.619 1.869 2 4 8 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.619 1.869 2 3 6 20


N G-6
D
GRID
4-5 A
TOP BARS

F
L 2.565 - - 2.565 1 3 3 20
O
O
R
BOTTOM
BARS

2.565 - - 2.565 1 3 3 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.275 1.525 2 4 8 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.275 1.525 2 3 6 20


G-6
N
D GRID
4-5
TOP BARS

F
A-B
L 3.060 - - 3.060 1 3 3 20
O
O
R
BOTTOM
BARS

3.060 - - 3.060 1 3 3 20
TOP BARS

0.240 0.060 1.619 1.869 2 4 8 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.619 1.869 2 3 6 20


N G-6
D
GRID
4-5 B
TOP BARS

F
L 2.565 - - 2.565 1 3 3 20
O
O
R
BOTTOM
BARS

2.565 - - 2.565 1 3 3 20
TOP BARS

0.240 0.060 1.525 1.775 2 4 8 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.525 1.775 2 3 6 20


N G-6
D
GRID
4-5 C
TOP BARS

F
L 2.700 - - 2.700 1 3 3 20
O
O
R
BOTTOM
BARS

2.700 - - 2.700 1 3 3 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.568 1.818 2 4 8 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.568 1.818 2 3 6 20


N G-6
D
GRID
C-E 4
TOP BARS

F
L 2.802 - - 2.802 1 3 3 20
O
O
R
BOTTOM
BARS

2.802 - - 2.802 1 3 3 20
TOP BARS

0.240 0.060 1.355 1.605 2 4 8 20

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.355 1.605 2 3 6 20


N G-6
D
GRID
C-E 4
TOP BARS

F
L 3.252 - - 3.252 1 3 3 20
O
O
R
BOTTOM
BARS

3.252 - - 3.252 1 3 3 20
TOP BARS

0.240 0.060 2.219 2.469 2 5 10 25

G
R
BOTTOM

O
BARS

U 0.240 0.060 2.219 2.469 2 3 6 25


N G-7
D
GRID
A-B 5
TOP BARS

F
L 4.005 - - 4.005 1 2 2 25
O
O
R
BOTTOM
BARS

4.005 - - 4.005 1 4 4 25

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 2.219 2.469 2 5 10 25

G
R
BOTTOM

O
BARS

U 0.240 0.060 2.219 2.469 2 3 6 25


N G-7
D
GRID
A-B 3
TOP BARS

F
L 4.005 - - 4.005 1 2 2 25
O
O
R
BOTTOM
BARS

4.005 - - 4.005 1 4 4 25
TOP BARS

0.240 0.060 2.219 2.469 2 5 10 25

G
R
BOTTOM

O
BARS

U 0.240 0.060 2.219 2.469 2 3 6 25


N G-7
D
GRID
A-B 1
TOP BARS

F
L 4.005 - - 4.005 1 2 2 25
O
O
R
BOTTOM
BARS

4.005 - - 4.005 1 4 4 25
TOP BARS

0.240 0.060 2.219 2.469 2 5 10 25

G
R
BOTTOM

O
BARS

U 0.240 0.060 2.219 2.469 2 3 6 25


N G-7
D
GRID
B-E 3
TOP BARS

F
L 4.005 - - 4.005 1 2 2 25
O
O
R
BOTTOM
BARS

4.005 - - 4.005 1 4 4 25

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 2.219 2.469 2 5 10 25

G
R
BOTTOM

O
BARS

U 0.240 0.060 2.219 2.469 2 3 6 25


N G-7
D
GRID
B-E 1
TOP BARS

F
L 4.005 - - 4.005 1 2 2 25
O
O
R
BOTTOM
BARS

4.005 - - 4.005 1 4 4 25
TOP BARS

0.240 0.060 1.875 2.125 2 5 10 25

G
R
BOTTOM

O
BARS

U
G-7 0.240 0.060 1.875 2.125 2 3 6 25
N
D GRID
1-3
TOP BARS

F
A-B
L 4.500 - - 4.500 1 2 2 25
O
O
R
BOTTOM
BARS

4.500 - - 4.500 1 4 4 25
TOP BARS

0.240 0.060 1.875 2.125 2 5 10 25

G
R
BOTTOM

O
BARS

U 0.240 0.060 1.875 2.125 2 3 6 25


N G-7
D
GRID
1-3 D
TOP BARS

F
L 4.500 - - 4.500 1 2 2 25
O
O
R
BOTTOM
BARS

4.500 - - 4.500 1 4 4 25

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 2.219 2.469 2 5 10 25

G
R
BOTTOM

O
BARS

U 0.240 0.060 2.219 2.469 2 3 6 25


N G-8
D
GRID
A-B 4
TOP BARS

F
L 4.005 - - 4.005 1 2 2 25
O
O
R
BOTTOM
BARS

4.005 - - 4.005 1 4 4 25
TOP BARS

0.240 0.060 1.875 2.125 2 5 10 25

G
R
BOTTOM

O
BARS

U
G-8 0.240 0.060 1.875 2.125 2 3 6 25
N
D GRID
A-B
TOP BARS

F
3-4
L 4.500 - - 4.500 1 2 2 25
O
O
R
BOTTOM
BARS

4.500 - - 4.500 1 4 4 25
TOP BARS

0.240 0.060 2.219 2.469 2 5 10 25

G
R
BOTTOM

O
BARS

U 0.240 0.060 2.219 2.469 2 3 6 25


N G-8
D
GRID
A-B 2
TOP BARS

F
L 4.005 - - 4.005 1 2 2 25
O
O
R
BOTTOM
BARS

4.005 - - 4.005 1 4 4 25

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 2.219 2.469 2 5 10 25

G
R
BOTTOM

O
BARS

U 0.240 0.060 2.219 2.469 2 3 6 25


N G-8
D
GRID
B-E 2
TOP BARS

F
L 4.005 - - 4.005 1 2 2 25
O
O
R
BOTTOM
BARS

4.005 - - 4.005 1 4 4 25

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS
BEAMS
TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
S
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

E
C 0.240 0.060 0.500 0.750 2 3 6 20
O
N
D
BOTTOM
BARS

F
G-1 0.240 0.060 0.500 0.750 2 2 4 20
L F
O L GRID
O O
R O A-B
TOP BARS

R 0-1
T 1.200 - - 1.200 1 2 2 20
O

T
BOTTOM

H
BARS

I 1.200 - - 1.200 1 2 2 20
R
D
S
TOP BARS

E
C 0.240 0.060 0.894 1.144 2 4 8 20
O
N
D
BOTTOM
BARS

F
0.240 0.060 0.894 1.144 2 2 4 20
L F
O L G-2
O O GRID
R O
A-1
TOP BARS

R
T 1.065 - - 1.065 1 2 2 20
O

T
BOTTOM

H
BARS

I 1.065 - - 1.065 1 2 2 20
R
D
S
TOP BARS

E
C 0.240 0.060 0.894 1.144 2 4 8 20
O
N
D
BOTTOM
BARS

F
0.240 0.060 0.894 1.144 2 2 4 20
L F
O L G-2
O O GRID
R O
B-1
TOP BARS

R
T 1.065 - - 1.065 1 2 2 20
O

T
BOTTOM

H
BARS

I 1.065 - - 1.065 1 2 2 20
R
D

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
S
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

E
C 0.240 0.060 1.875 2.125 2 4 8 20
O
N
D
BOTTOM
BARS

F
0.240 0.060 1.875 2.125 2 2 4 20
L F
O L G-3
O O GRID
R O
A-B 0
TOP BARS

R
T 4.500 - - 4.500 1 2 2 20
O

T
BOTTOM

H
BARS

I 4.500 - - 4.500 1 2 2 20
R
D
TOP BARS

0.240 0.060 0.814 1.064 2 4 8 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 0.814 1.064 2 2 4 20
D
T G-3
H
F GRID
L
B-C 4
TOP BARS

F
O
O
L 0.993 - - 0.993 1 2 2 20
O
R
O
R
T
BOTTOM

O
BARS

0.993 - - 0.993 1 2 2 20
TOP BARS

0.240 0.060 0.814 1.064 2 4 8 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 0.814 1.064 2 2 4 20
D
T G-3
H
F GRID
L
B-C 5
TOP BARS

F
O
O
L 0.993 - - 0.993 1 2 2 20
O
R
O
R
T
BOTTOM

O
BARS

0.993 - - 0.993 1 2 2 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.275 1.525 4 3 12 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.275 1.525 4 3 12 20
D
T G-4
H
F GRID
L
1-3 A
TOP BARS

F
O
O
L 1.980 - - 1.980 2 3 6 20
O
R
O
R
T
BOTTOM

O
BARS

1.980 - - 1.980 2 3 6 20
TOP BARS

0.240 0.060 1.275 1.525 4 3 12 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.275 1.525 4 3 12 20
D
T G-4
H
F GRID
L
1-3 B
TOP BARS

F
O
O
L 1.980 - - 1.980 2 3 6 20
O
R
O
R
T
BOTTOM

O
BARS

1.980 - - 1.980 2 3 6 20
TOP BARS

0.240 0.060 1.275 1.525 4 3 12 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.275 1.525 4 3 12 20
D
T G-4
H
F GRID
L
1-3 E
TOP BARS

F
O
O
L 1.980 - - 1.980 2 3 6 20
O
R
O
R
T
BOTTOM

O
BARS

1.980 - - 1.980 2 3 6 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.423 1.673 2 6 12 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.423 1.673 2 3 6 20
D
T G-5
H
F GRID
L
3-4 A
TOP BARS

F
O
O
L 2.334 - - 2.334 1 3 3 20
O
R
O
R
T
BOTTOM

O
BARS

2.334 - - 2.334 1 4 4 20
TOP BARS

0.240 0.060 1.085 1.335 2 6 12 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R
G-5 0.240 0.060 1.085 1.335 2 3 6 20
D
T
H GRID
F
L 3-4
TOP BARS

F
O A-B
O
L 2.604 - - 2.604 1 3 3 20
O
R
O
R
T
BOTTOM

O
BARS

2.604 - - 2.604 1 4 4 20
TOP BARS

0.240 0.060 1.423 1.673 2 6 12 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.423 1.673 2 3 6 20
D
T G-5
H
F GRID
L
3-4 B
TOP BARS

F
O
O
L 2.334 - - 2.334 1 3 3 20
O
R
O
R
T
BOTTOM

O
BARS

2.334 - - 2.334 1 4 4 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.479 1.729 2 6 12 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.479 1.729 2 3 6 20
D
T G-5
H
F GRID
L
3-4 C
TOP BARS

F
O
O
L 2.469 - - 2.469 1 3 3 20
O
R
O
R
T
BOTTOM

O
BARS

2.469 - - 2.469 1 4 4 20
TOP BARS

0.240 0.060 1.423 1.673 2 6 12 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.423 1.673 2 3 6 20
D
T G-5
H
F GRID
L
3-4 E
TOP BARS

F
O
O
L 2.334 - - 2.334 1 3 3 20
O
R
O
R
T
BOTTOM

O
BARS

2.334 - - 2.334 1 4 4 20
TOP BARS

0.240 0.060 1.556 1.806 2 4 8 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.556 1.806 2 3 6 20
D
T G-6
H
F GRID
L
4-5 A
TOP BARS

F
O
O
L 2.655 - - 2.655 1 3 3 20
O
R
O
R
T
BOTTOM

O
BARS

2.655 - - 2.655 1 3 3 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.275 1.525 2 4 8 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R
G-6 0.240 0.060 1.275 1.525 2 3 6 20
D
T
H GRID
F
L 4-5
TOP BARS

F
O A-B
O
L 3.060 - - 3.060 1 3 3 20
O
R
O
R
T
BOTTOM

O
BARS

3.060 - - 3.060 1 3 3 20
TOP BARS

0.240 0.060 1.506 1.756 2 4 8 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.506 1.756 2 3 6 20
D
T G-6
H
F GRID
L
4-5 B
TOP BARS

F
O
O
L 2.655 - - 2.655 1 3 3 20
O
R
O
R
T
BOTTOM

O
BARS

2.655 - - 2.655 1 3 3 20
TOP BARS

0.240 0.060 1.525 1.775 2 4 8 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.525 1.775 2 3 6 20
D
T G-6
H
F GRID
L
4-5 C
TOP BARS

F
O
O
L 2.700 - - 2.700 1 3 3 20
O
R
O
R
T
BOTTOM

O
BARS

2.700 - - 2.700 1 3 3 20

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 1.593 1.843 2 4 8 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.593 1.843 2 3 6 20
D
T G-6
H
F GRID
L
C-E 4
TOP BARS

F
O
O
L 2.862 - - 2.862 1 3 3 20
O
R
O
R
T
BOTTOM

O
BARS

2.862 - - 2.862 1 3 3 20
TOP BARS

0.240 0.060 1.355 1.605 2 4 8 20


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.355 1.605 2 3 6 20
D
T G-6
H
F GRID
L
C-E 4
TOP BARS

F
O
O
L 3.252 - - 3.252 1 3 3 20
O
R
O
R
T
BOTTOM

O
BARS

3.252 - - 3.252 1 3 3 20
TOP BARS

0.240 0.060 2.156 2.406 2 5 10 25


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 2.156 2.406 2 3 6 25
D
T G-7
H
F GRID
L
A-B 5
TOP BARS

F
O
O
L 4.095 - - 4.095 1 2 2 25
O
R
O
R
T
BOTTOM

O
BARS

4.095 - - 4.095 1 4 4 25

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 2.156 2.406 2 5 10 25


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 2.156 2.406 2 3 6 25
D
T G-7
H
F GRID
L
A-B 3
TOP BARS

F
O
O
L 4.095 - - 4.095 1 2 2 25
O
R
O
R
T
BOTTOM

O
BARS

4.095 - - 4.095 1 4 4 25
TOP BARS

0.240 0.060 2.156 2.406 2 5 10 25


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 2.156 2.406 2 3 6 25
D
T G-7
H
F GRID
L
A-B 1
TOP BARS

F
O
O
L 4.095 - - 4.095 1 2 2 25
O
R
O
R
T
BOTTOM

O
BARS

4.095 - - 4.095 1 4 4 25
TOP BARS

0.240 0.060 2.156 2.406 2 5 10 25


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 2.156 2.406 2 3 6 25
D
T G-7
H
F GRID
L
B-E 3
TOP BARS

F
O
O
L 4.095 - - 4.095 1 2 2 25
O
R
O
R
T
BOTTOM

O
BARS

4.095 - - 4.095 1 4 4 25

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 2.156 2.406 2 5 10 25


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 2.156 2.406 2 3 6 25
D
T G-7
H
F GRID
L
B-E 1
TOP BARS

F
O
O
L 4.095 - - 4.095 1 2 2 25
O
R
O
R
T
BOTTOM

O
BARS

4.095 - - 4.095 1 4 4 25
TOP BARS

0.240 0.060 1.875 2.125 2 5 10 25


S
E
F
C
O
BOTTOM

O
U
BARS

N
R
G-7 0.240 0.060 1.875 2.125 2 3 6 25
D
T
H GRID
F
L 1-3
TOP BARS

F
O A-B
O
L 4.500 - - 4.500 1 2 2 25
O
R
O
R
T
BOTTOM

O
BARS

4.500 - - 4.500 1 4 4 25
TOP BARS

0.240 0.060 1.875 2.125 2 5 10 25


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 1.875 2.125 2 3 6 25
D
T G-7
H
F GRID
L
1-3 D
TOP BARS

F
O
O
L 4.500 - - 4.500 1 2 2 25
O
R
O
R
T
BOTTOM

O
BARS

4.500 - - 4.500 1 4 4 25

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 2.156 2.406 2 5 10 25


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 2.156 2.406 2 3 6 25
D
T G-8
H
F GRID
L
A-B 4
TOP BARS

F
O
O
L 4.095 - - 4.095 1 2 2 25
O
R
O
R
T
BOTTOM

O
BARS

4.095 - - 4.095 1 4 4 25
TOP BARS

0.240 0.060 1.875 2.125 2 5 10 25


S
E
F
C
O
BOTTOM

O
U
BARS

N
R
G-8 0.240 0.060 1.875 2.125 2 3 6 25
D
T
H GRID
F
L A-B
TOP BARS

F
O 3-4
O
L 4.500 - - 4.500 1 2 2 25
O
R
O
R
T
BOTTOM

O
BARS

4.500 - - 4.500 1 4 4 25
TOP BARS

0.240 0.060 2.156 2.406 2 5 10 25


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 2.156 2.406 2 3 6 25
D
T G-8
H
F GRID
L
A-B 2
TOP BARS

F
O
O
L 4.095 - - 4.095 1 2 2 25
O
R
O
R
T
BOTTOM

O
BARS

4.095 - - 4.095 1 4 4 25

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila
COLLEGE OF ENGINEERING
Department of Civil Engineering

Name of Project: PROPOSED FOUR STOREY SCHOOL BUILDING Date: MARCH 27, 2018
Owner: ST. THERESE OF ROSE SCHOOL
Location: CALOOCAN CITY
STEEL WORKS

TOTAL NO. OF
LENGTH PER BAR (m) NO. OF TOTAL DIAMETER
LENGTH PIECES
ITEM TO BE ESTIMATED FIGURE STRUCTURAL NO. OF OF BARS
PER BAR PER
a b c MEMBER BARS (mm)
(m) MEMBER
CUT BARS @ MIDSPAN CUT BARS @ SUPPORT

TOP BARS

0.240 0.060 2.156 2.406 2 5 10 25


S
E
F
C
O
BOTTOM

O
U
BARS

N
R 0.240 0.060 2.156 2.406 2 3 6 25
D
T G-8
H
F GRID
L
B-E 2
TOP BARS

F
O
O
L 4.095 - - 4.095 1 2 2 25
O
R
O
R
T
BOTTOM

O
BARS

4.095 - - 4.095 1 4 4 25

Prepared By: Checked By:

COLA, JOHN EDEN ROSS V. ENGR. ARNOLFO ARCIBAL


SIA, ALFONSO RAPHAEL V. INSTRUCTOR
BSCE 3A