Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/13/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TECNICO II: PEDRO MATA; TEC I: LEONARDO GARCIA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: LEANDRO GARCIA, TECNICO II: RAMON RODRIGUEZ, TEC I: LUIS MARCANO, SIHO-A: CLARIVEL ORTIZ.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉF

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA

0:00 1:00 1:00


C

1:00 2:00 1:00


C

2:00 3:00 1:00


C

3:00 4:00 1:00


C

4:00 5:00 1:00


C

5:00 6:00 1:00


C

6:00 7:00 1:00


C

7:00 8:00 1:00


C

8:00 9:00 1:00


C

9:00 10:00 1:00


C

10:00 11:00 1:00 INICIA MOVILIZACIÓN DE EQUIPOS DEL SWT, DESDE LA BASE HASTA LA LOCALIZACIÓN MÚLTIPLE DE FLUJO 2 DEL CAMPO TACATA
C

11:00 12:00 1:00 LLEGA MOVILIZACIÓN DE EQUIPOS PERTENECIENTES AL SWT A LA LOCALIZACIÓN MF2 DEL CAMPO TACATA.
C

12:00 13:00 1:00 SE REALIZA FIRMA DE ART Y PERMISOS DE TRABAJO, SE INICIA POSICIONAMIENTO Y VESTIDA DE EQUIPOS WT.
C

13:00 14:00 1:00 POSICIONAMIENTO DE EQUIPO AVANCE 50%, AVANCE DE VESTIDA 10%
C

14:00 15:00 1:00 POSICIONAMIENTO DE EQUIPO AVANCE 70%, AVANCE DE VESTIDA 30%
C

15:00 16:00 1:00 POSICIONAMIENTO DE EQUIPO AVANCE 100%, AVANCE DE VESTIDA 75%
C

16:00 17:00 1:00 POSICIONAMIENTO DE EQUIPO AVANCE 100%, AVANCE DE VESTIDA 85%
C

17:00 18:00 1:00 POSICIONAMIENTO DE EQUIPO AVANCE 100%, AVANCE DE VESTIDA 90%
C

18:00 19:00 1:00 SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. POSICIONAMIENTO DE EQUIPO AVANCE 100
C

19:00 20:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

20:00 21:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

21:00 22:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

22:00 23:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

23:00 23:59 0:59 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C
TOTAL D./24 HRS 0 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 0 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

VIAJES DE VACUUM

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

23:59 0:00
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/14/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TECNICO II: PEDRO MATA; TEC I: LEONARDO GARCIA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: LEANDRO GARCIA, TECNICO II: RAMON RODRIGUEZ, TEC I: LUIS MARCANO, SIHO-A: CLARIVEL ORTIZ.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFON

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA

0:00 1:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

1:00 2:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

2:00 3:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

3:00 4:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

4:00 5:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

5:00 6:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

6:00 7:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

7:00 8:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

8:00 9:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

9:00 10:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

10:00 11:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C

11:00 12:00 1:00 EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACION, WHP:N, RED:", BLS/H:, BLS/D:, T/DESP:, API: , BSW:%
C
EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACIÓN, PERSONAL DE PDVSA PRODUCCIÓN LLEGA A MPF2 DE TACATA A INSTALAR PANQUECA PARA CEGADO
12:00 13:00 1:00
DE LÍNEA. WHP:N/A, RED:N/A, BLS/H:N/A BLS/D:N/A, T/DESP:N/A, API:N/A , BSW:N/A%
C
EQUIPO SEPARADOR 100% MUDADO Y VESTIDO, EN ESPERA DE ALINEACIÓN, CONTINUA PERSONAL DE PDVSA PRODUCCIÓN EN MPF2 DE TACATA INSTALANDO PANQUECA PARA
13:00 14:00 1:00
CESGADO DE LINEA. WHP:N/A, RED:N/A, BLS/H:N/A BLS/D:N/A, T/DESP:N/A, API:N/A , BSW:N/A%
C

14:00 15:00 1:00 POZO TAG-18, ALINEADO AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, WHP: 350PSI, RED:1/4", PSEP: 130PSI, BLS/H:80BLS, BLS/D:1920BLS, T/DESP:80BLS.
a

15:00 16:00 1:00 POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:107,25BLS, BLS/D:2574BLS, T/DESP:187,2BLS
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:67,60BLS, BLS/D:1622,40BLS,
16:00 17:00 1:00
T/DESP:254,80BLS
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80BLS, BLS/D:1123,20BLS,
17:00 18:00 1:00
T/DESP:301,6BLS, SE REALIZA TRASEGADO DE CRUDO, VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART, PSEP:60PSI, BLS/H:10,40BLS, BLS/D:249,60
18:00 19:00 1:00
BLS, T/DESP:312BLS
a

19:00 20:00 1:00 POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:10,40BLS, BLS/D:249,6BLS, T/DESP:322,4BLS.
a

20:00 21:00 1:00 POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:1,95BLS, BLS/D:46,50BLS, T/DESP:324,35BLS.
a

21:00 22:00 1:00 POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:7,15BLS, BLS/D:171,60BLS, T/DESP:331,50BLS.
a

22:00 23:00 1:00 POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:8,45BLS, BLS/D:202,80BLS, T/DESP:339,95BLS.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:34,45BLS, BLS/D:826,80BLS,
23:00 23:59 0:59
T/DESP:374,40BLS
a
TOTAL D./24 HRS 374,4 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 374,4 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

VIAJES DE VACUUM 1.00 #01 VIAJE DE VACUUM CON 150,80 BLS

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

14:00 9:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/15/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TECNICO II: PEDRO MATA; TEC I: LEONARDO GARCIA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: LEANDRO GARCIA, TECNICO II: RAMON RODRIGUEZ, TEC I: LUIS MARCANO, SIHO-A: CLARIVEL ORTIZ.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:39BLS, BLS/D:936,80BLS, T/DESP:413,40BLS.
0:00 1:00 1:00
SE REALIZA TRASEGADO DE CRUDO, VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,80BLS, BLS/D:499,20BLS,
1:00 2:00 1:00
T/DESP:434,200BLS
a

2:00 3:00 1:00 POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:15,60BLS, BLS/D:374,40BLS, T/DESP:449,8BLS
a

3:00 4:00 1:00 POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:15,60BLS, BLS/D:374,40BLS, T/DESP:465,40BLS
a

4:00 5:00 1:00 POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,8BLS, BLS/D:499,20BLS, T/DESP:486,20BLS
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:13BLS, BLS/D:312BLS, T/DESP:499,20BLS. SE
5:00 6:00 1:00
REALIZA TRASEGADO DE CRUDO, VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:20,80BLS, BLS/D:499,20
6:00 7:00 1:00
BLS, T/DESP:520BLS
a

7:00 8:00 1:00 POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:31,2BLS, BLS/D:748,80BLS, T/DESP:551,20BLS
a

8:00 9:00 1:00 POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:22,10BLS, BLS/D:530,40BLS, T/DESP:573,30BLS
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:22,10BLS, BLS/D:530,40BLS,
9:00 10:00 1:00
T/DESP:595,40BLS, BSW: 0,2%.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:28,60BLS, BLS/D:686,40BLS, T/DESP:624BLS,
10:00 11:00 1:00
BSW:0,4%
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:650BLS,
11:00 12:00 1:00
BSW:0,4%
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:31,20BLS, BLS/D:748,80BLS,
12:00 13:00 1:00
T/DESP:681,20BLS, BSW:0,4%.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:33,8BLS, BLS/D:811,20BLS, T/DESP:715BLS,
13:00 14:00 1:00
BSW:0,2%
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,40BLS, BLS/D:561,60BLS, T/DESP:738,40
14:00 15:00 1:00
BLS, BSW:0,2%. SE REALIZA TRASEGADO DE CRUDO, VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:24,05BLS, BLS/D:577,20BLS,
15:00 16:00 1:00
T/DESP:762,45BLS, BSW:0,2%, TGAS:75°F, QGAS: 0,602 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:22,75BLS, BLS/D:546BLS, T/DESP:785,20BLS,
16:00 17:00 1:00
BSW:0,2%, TGAS:72°F, QGAS: 0,807 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40BLS, BLS/D:1185,60BLS,
17:00 18:00 1:00
T/DESP:834,60BLS, BSW:0,2%, TGAS:72°F, QGAS: 0,807 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:26BLS, BLS/D:624 BLS,
18:00 19:00 1:00
T/DESP:860,60BLS
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:28,60BLS, BLS/D:686,40BLS,
19:00 20:00 1:00
T/DESP:889,20BLS, BSW:0,2%, TGAS:70°F, QGAS: 0,72 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 26BLS, BLS/D:6240BLS, T/DESP:915,20BLS,
20:00 21:00 1:00
BSW:0,2%, TGAS:70°F, QGAS: 0,69 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,40BLS, BLS/D:561,60BLS,
21:00 22:00 1:00
T/DESP:938,60BLS, BSW:0,2%, TGAS:69°F, QGAS: 0,66 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:33,15BLS, BLS/D:795,60BLS,
22:00 23:00 1:00
T/DESP:971,75BLS, BSW:0,2%, TGAS:69°F, QGAS: 0,72 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:18,85BLS, BLS/D:452,40BLS,
23:00 23:59 0:59
T/DESP:990,60BLS, BSW:0,2%, TGAS:68°F, QGAS: 0,67 MMSCFD.
a
TOTAL D./24 HRS 616,20 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 990,60 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

VIAJES DE VACUUM 4.00 #01 VIAJE DE VACUUM CON 150,80BLS. #02 VIAJE DE VACUUM CON 150,80BLS.

#03 VIAJE DE VACUUM CON 150,80BLS. #04 VIAJE DE VACUUM CON 150,80BLS
HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/16/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TECNICO II: PEDRO MATA; TEC I: LEONARDO GARCIA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: LEANDRO GARCIA, TECNICO II: RAMON RODRIGUEZ, TEC I: LUIS MARCANO, SIHO-A: CLARIVEL ORTIZ.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,80BLS, BLS/D:499,2BLS, T/DESP:1011,4BLS, BSW:0,2%,
0:00 1:00 1:00 TGAS:68°F, QGAS: 0,68 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:1037,40BLS,
1:00 2:00 1:00
BSW:0,2%, TGAS:68°F, QGAS: 0,69 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:28,6BLS, BLS/D:686,40BLS, T/DESP:1066BLS,
2:00 3:00 1:00
BSW:0,2%, TGAS:68°F, QGAS: 0,72 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,40BLS, BLS/D:561,60BLS,
3:00 4:00 1:00
T/DESP:1089,40BLS, BSW:0,2%, TGAS:68°F, QGAS: 0,71 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:1115,40BLS,
4:00 5:00 1:00
BSW:0,2%, TGAS:68°F, QGAS: 0,72 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:19,50BLS, BLS/D:468BLS, T/DESP:1134,90BLS.
5:00 6:00 1:00
SE REALIZA TRASEGADO DE CRUDO, CON 157,95 BLS, CON DESTINO A LA EST. LA CEIBA.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:31,20BLS, BLS/D:748,80
6:00 7:00 1:00
BLS, T/DESP:1166,10BLS
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,4BLS, BLS/D:561,60BLS,
7:00 8:00 1:00
T/DESP:1189,50BLS, BSW:0,2%, TGAS:72°F, QGAS: 0,70 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:16,90BLS, BLS/D:405,60BLS,
8:00 9:00 1:00
T/DESP:1206,40BLS, BSW:50%, TGAS:75°F, QGAS: 0,68 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:45,50BLS, BLS/D:1092BLS, T/DESP:1251,90BLS,
9:00 10:00 1:00
BSW:40%, TGAS:85°F, QGAS: 0,693MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:1277,9BLS,
10:00 11:00 1:00
BSW:35%, TGAS:80°F, QGAS: 0,71MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:40,95BLS, BLS/D:982,80BLS,
11:00 12:00 1:00
T/DESP:1318,85BLS, BSW: 8%, TGAS:85°F, QGAS: 0,707 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:37,70BLS, BLS/D:904,80BLS,
12:00 13:00 1:00
T/DESP:1356,55BLS, BSW: 8%, TGAS:85°F, QGAS: 0,707 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:31,2BLS, BLS/D:748,80BLS,
13:00 14:00 1:00
T/DESP:1387,75BLS, BSW: 7,5%, TGAS:87°F, QGAS: 0,719 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:31,2BLS, BLS/D:748,80BLS, T/DESP:1418,95BLS, BSW: 8%,
14:00 15:00 1:00 TGAS:87°F, QGAS: 0,72 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:1444,95BLS, BSW: 8%,
15:00 16:00 1:00 TGAS:80°F, QGAS: 0,641 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:1470,95BLS, BSW: 0.2%,
16:00 17:00 1:00 TGAS:80°F, QGAS: 0,641 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20.8BLS, BLS/D:499.2BLS, T/DESP:1491,75BLS, BSW: 0.2%,
17:00 18:00 1:00 TGAS:80°F, QGAS: 0,681 MMSCFD.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:23,4BLS, BLS/D:561,6 BLS,
18:00 19:00 1:00
T/DESP:1515,15BLS
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,80BLS, BLS/D:499,20BLS,
19:00 20:00 1:00
T/DESP:1535,95BLS, BSW:0,2%, TGAS:78°F, QGAS: 0,70 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 20,8BLS, BLS/D:499,2BLS, T/DESP:1556,75BLS,
20:00 21:00 1:00
BSW:0,2%, TGAS:78°F, QGAS: 0,70 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,80BLS, BLS/D:499,20BLS,
21:00 22:00 1:00
T/DESP:1577,55BLS, BSW:0,2%, TGAS:77°F, QGAS: 0,71 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,4BLS, BLS/D:561,6BLS, T/DESP:1600,95BLS,
22:00 23:00 1:00
BSW:0,2%, TGAS:77°F, QGAS: 0,72 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,8BLS, BLS/D:499,2BLS, T/DESP:1621,75BLS,
23:00 23:59 0:59
BSW:0,2%, TGAS:77°F, QGAS: 0,74 MMSCFD.
a
TOTAL D./24 HRS 631,15 BLS TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 1621,75 BLS TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

VIAJES DE VACUUM 3.00 #01 VIAJE DE VACUMS CON 157,95BLS. #02 VIAJE DE VACUMS CON 150,80BLS. #03 VIAJE DE VACUMS CON 150,80BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/17/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TECNICO II: PEDRO MATA; TEC I: LEONARDO GARCIA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: LEANDRO GARCIA, TECNICO II: RAMON RODRIGUEZ, TEC I: LUIS MARCANO, SIHO-A: CLARIVEL ORTIZ.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:1647,75BLS, BSW:0,2%,
0:00 1:00 1:00 TGAS:77°F, QGAS: 0,74 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:1673,75BLS,
1:00 2:00 1:00
BSW:0,2%, TGAS:76°F, QGAS: 0,73 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,8BLS, BLS/D:499,2BLS, T/DESP:1694,55BLS,
2:00 3:00 1:00
BSW:0,2%, TGAS:76°F, QGAS: 0,72 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:1720,55BLS,
3:00 4:00 1:00
BSW:0,2%, TGAS:76°F, QGAS: 0,73 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:31,20BLS, BLS/D:748,8BLS,
4:00 5:00 1:00
T/DESP:1751,75BLS, BSW:0,2%, TGAS:76°F, QGAS: 0,73 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:31,20BLS, BLS/D:748,80BLS,
5:00 6:00 1:00
T/DESP:1782,90BLS.BSW:0,2%, TGAS:76°F, QGAS: 0,74 MMSCFD.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:31,20BLS, BLS/D:748,80
6:00 7:00 1:00
BLS, T/DESP:1814,10BLS, SE REALIZA TRASEGADO DE CRUDO, CON 153,40 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:33,80BLS, BLS/D:811,20BLS,
7:00 8:00 1:00
T/DESP:1847,90BLS.BSW:0,2%, TGAS:80°F, QGAS: 0,753 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,40BLS, BLS/D:561,60BLS,
8:00 9:00 1:00
T/DESP:1872,60BLS.BSW: 1%, TGAS:82°F, QGAS: 0,723 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:24,70BLS, BLS/D:592,80BLS,
9:00 10:00 1:00
T/DESP:1896BLS.BSW: 1%, TGAS:82°F, QGAS: 0,723 MMSCFD. SE REALIZA TRASIEGO DE CRUDO, CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,15BLS, BLS/D:483,60BLS,
10:00 11:00 1:00
T/DESP:1916,15BLS.BSW: 1%, TGAS:82°F, QGAS: 0,72 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:22,75BLS, BLS/D:546BLS,
11:00 12:00 1:00
T/DESP:1938,90BLS.BSW: 24%, TGAS:86°F, QGAS: 0,678 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,40BLS, BLS/D:561,60BLS,
12:00 13:00 1:00
T/DESP:1962,30BLS.BSW: 1,2%, TGAS:90°F, QGAS: 0,704 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS,
13:00 14:00 1:00
T/DESP:1988,30BLS.BSW: 1,2%, TGAS:92°F, QGAS: 0,702 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:39BLS, BLS/D:936BLS,
14:00 15:00 1:00
T/DESP:2027,30BLS.BSW:2%, TGAS:90°F, QGAS: 0,863 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,4BLS, BLS/D:561,6BLS,
15:00 16:00 1:00
T/DESP:2050,70BLS.BSW:2%, TGAS:87°F, QGAS: 0,775 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:28,60BLS, BLS/D:686,4BLS,
16:00 17:00 1:00
T/DESP:2079,30BLS.BSW:5%, TGAS:85°F, QGAS: 0,777 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:18,20BLS, BLS/D:436,80BLS, T/DESP:2097,5.
17:00 18:00 1:00
BLS.BSW:2%, TGAS:87°F, QGAS: 0,775 MMSCFD.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:26BLS, BLS/D:624 BLS,
18:00 19:00 1:00
T/DESP:2123,5BLS .BSW:2%, TGAS:87°F, QGAS: 0,745 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,4BLS, BLS/D:561,6BLS, T/DESP:2146,9BLS,
19:00 20:00 1:00
BSW:2%, TGAS:87°F, QGAS: 0,752 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 18,2BLS, BLS/D:436,20BLS, T/DESP:2165,1BLS,
20:00 21:00 1:00
BSW:2%, TGAS:73°F, QGAS: 0,73 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,4BLS, BLS/D:561,6BLS, T/DESP:2188,5BLS,
21:00 22:00 1:00
BSW:2%, TGAS:87°F, QGAS: 0,692 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,8BLS, BLS/D:499,2BLS, T/DESP:2209,3BLS,
22:00 23:00 1:00
BSW:0,4%, TGAS:87°F, QGAS: 0,680 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:22,1BLS, BLS/D:530,4BLS, T/DESP:2231,40BLS,
23:00 23:59 0:59
BSW:0,4%, TGAS:87°F, QGAS: 0,65 MMSCFD.
a
TOTAL D./24 HRS 609,65 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 2231,4 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

VIAJES DE VACUUM 4.00 #01 VIAJE DE VACUMS CON 153,40BLS. #02 VIAJES DE VACUMS CON 150,80 BLS. #03 VIAJES DE VACUMS CON 150,80 BLS. #04 VIAJES DE VACUMS CON 150,80 BLS

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/18/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TECNICO II: PEDRO MATA; TEC I: LEONARDO GARCIA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA

POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:24,7BLS, BLS/D:592,8BLS, T/DESP:2256,1BLS, BSW:0,4%,
0:00 1:00 1:00
TGAS:87°F, QGAS: 0,66 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:2282,1BLS, BSW:0,4%,
1:00 2:00 1:00
TGAS:87°F, QGAS: 0,67 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,4BLS, BLS/D:561,6BLS, T/DESP:2305,5BLS, BSW:0,4%,
2:00 3:00 1:00 TGAS:87°F, QGAS: 0,67 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:28,6BLS, BLS/D:686,4BLS, T/DESP:2334,1BLS, BSW:0,4%,
3:00 4:00 1:00
TGAS:87°F, QGAS: 0,70 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,4BLS, BLS/D:561,6BLS, T/DESP:2357,5BLS,
4:00 5:00 1:00
BSW:0,4%, TGAS:87°F, QGAS: 0,71 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:18,20BLS, BLS/D:436,8BLS,
5:00 6:00 1:00
T/DESP:2375,7BLS.BSW:0,4%, TGAS:87°F, QGAS: 0,69 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:26 BLS, BLS/D: 624 BLS,
6:00 7:00 1:00
T/DESP:2401,7BLS, SE REALIZA TRASEGADO DE CRUDO, CON 158,60 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:18,2BLS, BLS/D:436,80BLS,
7:00 8:00 1:00
T/DESP:2419,90BLS.BSW:0,4%, TGAS:87°F, QGAS: 0,71 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:28,60BLS, BLS/D:686,40BLS,
8:00 9:00 1:00
T/DESP:2448,40BLS.BSW: 0,4%, TGAS:87°F, QGAS: 0,75 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:22,1BLS, BLS/D:530,40BLS,
9:00 10:00 1:00
T/DESP:2470,60BLS.BSW: 0,4%, TGAS:87°F, QGAS: 0,70 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:19,5BLS, BLS/D:468BLS,
10:00 11:00 1:00
T/DESP:2490,10BLS.BSW: 0,4%, TGAS:87°F, QGAS: 0,70 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:22,10BLS, BLS/D:530,4BLS, T/DESP:2512,2BLS.
11:00 12:00 1:00
BSW: 2%, TGAS:87°F, QGAS: 0,71 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,8BLS, BLS/D:499,20BLS,
12:00 13:00 1:00
T/DESP:2533BLS.BSW: 2%, TGAS:87,8°F, QGAS: 0,71 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:113,10BLS, BLS/D:2714,40BLS,
13:00 14:00 1:00
T/DESP:2646,100BLS.BSW: 2%, TGAS:87°F, QGAS: 0,71 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:10,4BLS, BLS/D:249,6LS,
14:00 15:00 1:00
T/DESP:2656,50BLS.BSW:2%, TGAS:87°F, QGAS: 0,71 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS,
15:00 16:00 1:00
T/DESP:2682,50BLS.BSW:2,4%, TGAS:87°F, QGAS: 0,71 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS,
16:00 17:00 1:00
T/DESP:2708,50BLS.BSW:2,4%, TGAS:87°F, QGAS: N/A MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:41,6BLS, BLS/D:998,40BLS, T/DESP:22750,10
17:00 18:00 1:00
BLS.BSW:2%, TGAS:77°F, QGAS: 1,280 MMSCFD.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:20,80BLS, BLS/D: 499,20
18:00 19:00 1:00
BLS, T/DESP:2770,90BLS .BSW:2,4%, TGAS:76°F, QGAS: 1,155 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:10,4BLS, BLS/D:249,60BLS, T/DESP:2781,30
19:00 20:00 1:00
BLS, BSW:2,4%, TGAS:76°F, QGAS: 0,919 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 10,4BLS, BLS/D:249,60BLS,
20:00 21:00 1:00
T/DESP:2791,70BLS, BSW:0,4%, TGAS:76°F, QGAS: 0,625 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:15,60BLS, BLS/D: 374,40BLS,
21:00 22:00 1:00
T/DESP:2807,3BLS, BSW:0,4%, TGAS:76°F, QGAS: 0,625 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:18,20BLS, BLS/D:BLS, T/DESP:2825,50BLS,
22:00 23:00 1:00
BSW:0,4%, TGAS:76°F, QGAS: 0,685 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:18,2BLS, BLS/D:436,80 BLS, T/DESP:2843,7BLS,
23:00 23:59 0:59
BSW:0,4%, TGAS:76°F, QGAS: 0,685 MMSCFD.
a
TOTAL D./24 HRS 612,3 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 2843,7 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

VIAJES DE VACUUM 5.00 #01 VIAJE DE VACUMS CON 150,80BLS. #02 VIAJES DE VACUMS CON 158,60 BLS. #03 VIAJES DE VACUMS CON 150,80 BLS. #04 VIAJES DE VACUMS CON 150,80 BLS

#05 VIAJES DE VACUMS CON 150,80 BLS


HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/19/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TECNICO II: PEDRO MATA; TEC I: LEONARDO GARCIA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA

POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,8BLS, BLS/D:499,2BLS, T/DESP:2864,5BLS, BSW:0,4%,
0:00 1:00 1:00
TGAS:76°F, QGAS: 0,713 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,8BLS, BLS/D:499,2BLS, T/DESP:2885,30BLS, BSW:0,4%,
1:00 2:00 1:00
TGAS:76°F, QGAS: 0,699 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,8BLS, BLS/D:499,2BLS, T/DESP:2906,100BLS, BSW:0,4%,
2:00 3:00 1:00 TGAS:76°F, QGAS: 0,699 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:2932,10BLS, BSW:0,4%,
3:00 4:00 1:00
TGAS:87°F, QGAS: 0,7130 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:27,30BLS, BLS/D:655,20BLS,
4:00 5:00 1:00
T/DESP:2959,4BLS, BSW:0,4%, TGAS:87°F, QGAS: 0,699 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,80BLS, BLS/D:499,20BLS,
5:00 6:00 1:00
T/DESP:2980,20BLS.BSW:0,4%, TGAS:76°F, QGAS: 0,699 MMSCFD.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:15,6 BLS, BLS/D: 374,40
6:00 7:00 1:00
BLS, T/DESP:2995,80BLS, SE REALIZA TRASEGADO DE CRUDO, CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:17,55BLS, BLS/D:521,20BLS,
7:00 8:00 1:00
T/DESP:3013,35BLS.BSW:0%, TGAS:87°F, QGAS: 0,652 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:18,85BLS, BLS/D:452,40BLS,
8:00 9:00 1:00
T/DESP:3032,20BLS.BSW: 1,60%, TGAS:87°F, QGAS: 0,656 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:29,25BLS, BLS/D:702BLS,
9:00 10:00 1:00
T/DESP:3061,45BLS.BSW: 1,6%, TGAS:87°F, QGAS: 0,685 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 152,10 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:18,85BLS, BLS/D:452,40BLS,
10:00 11:00 1:00
T/DESP:3080,30BLS.BSW: 1,6%, TGAS:87°F, QGAS: 0,713 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:24,70BLS, BLS/D:592,28BLS, T/DESP:3105BLS.
11:00 12:00 1:00
BSW: 1,6%, TGAS:87°F, QGAS: 0,713 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:22,10BLS, BLS/D:530,40BLS, T/DESP:
12:00 13:00 1:00
3127,10BLS.BSW: 1,6%, TGAS:87°F, QGAS: 0,699 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS,
13:00 14:00 1:00
T/DESP:3153,10BLS.BSW: 1,6%, TGAS:87°F, QGAS: 0,70 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:31,20BLS, BLS/D:748,80LS,
14:00 15:00 1:00
T/DESP:3184,30BLS.BSW:0,4%, TGAS:87°F, QGAS: 0,72 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 154,70 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS,
15:00 16:00 1:00
T/DESP:3210,30BLS.BSW:0,4%, TGAS:87°F, QGAS: 0,70 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,4BLS, BLS/D:561,60BLS,
16:00 17:00 1:00
T/DESP:3233,70BLS.BSW:0,4%, TGAS:87°F, QGAS: 0,71 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:13BLS, BLS/D:312BLS, T/DESP:3246,70 BLS.
17:00 18:00 1:00
BSW:0,4%, TGAS:79°F, QGAS: 0,711 MMSCFD.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:31,20BLS, BLS/D: 748,80
18:00 19:00 1:00
BLS, T/DESP:3277,90BLS .BSW:0,4%, TGAS:76°F, QGAS: 0,685 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:28,60BLS, BLS/D:686,40BLS, T/DESP:3306,50
19:00 20:00 1:00
BLS, BSW:0,4%, TGAS:76°F, QGAS: 0,685 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 26BLS, BLS/D:624BLS, T/DESP:3332,5BLS,
20:00 21:00 1:00
BSW:0,2%, TGAS:76°F, QGAS: 0,685 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 26BLS, BLS/D:624BLS, T/DESP:3358,50BLS,
21:00 22:00 1:00
BSW:0,2%, TGAS:76°F, QGAS: 0,685 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,40BLS, BLS/D: 561,60BLS,
22:00 23:00 1:00
T/DESP:3381,90BLS, BSW:0,2%, TGAS:76°F, QGAS: 0,685 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:28,60BLS, BLS/D:686,40 BLS,
23:00 23:59 0:59
T/DESP:3410,50BLS, BSW:0,2%, TGAS:75°F, QGAS: 0,686 MMSCFD.
a
TOTAL D./24 HRS 566,80 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 3410,50 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

VIAJES DE VACUUM 3.00 #01 VIAJE DE VACUMS CON 150,80BLS. #02 VIAJES DE VACUMS CON 152,10 BLS. #03 VIAJES DE VACUMS CON 154,70 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/20/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TECNICO II: PEDRO MATA; TEC I: LEONARDO GARCIA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA

POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:3436,5BLS, BSW:0,2%,
0:00 1:00 1:00
TGAS:75°F, QGAS: 0,686 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:28,6BLS, BLS/D: 686,40BLS, T/DESP:3465,10BLS,
1:00 2:00 1:00
BSW:0,2%, TGAS:75°F, QGAS: 0,686 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP: 3491,10BLS, BSW:0,4%,
2:00 3:00 1:00 TGAS:75°F, QGAS: 0,686 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,8BLS, BLS/D:499,2BLS, T/DESP:3511,90BLS, BSW:6,5%,
3:00 4:00 1:00
TGAS:76°F, QGAS: 0,685 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:18,2BLS, BLS/D:436,8BLS, T/DESP:3530,10BLS,
4:00 5:00 1:00
BSW:6,5%, TGAS: 76°F, QGAS: 0,685 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:18,2BLS, BLS/D:436,80BLS,
5:00 6:00 1:00 T/DESP:3548,30BLS.BSW:24%%, TGAS:76°F, QGAS: 0,685 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 150,80 BLS C/U, CON DESTINO A LA EST. LA
a CEIBA.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:31,20 BLS, BLS/D: 748,80
6:00 7:00 1:00
BLS, T/DESP: 3579,50BLS,
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 26 BLS, BLS/D: 624BLS,
7:00 8:00 1:00
T/DESP:3605,50BLS.BSW: 46%, TGAS:76°F, QGAS: 0,685 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 26 BLS, BLS/D: 624BLS,
8:00 9:00 1:00
T/DESP:3631,50BLS.BSW: 0;4%, TGAS:76°F, QGAS: 0,674 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:29,9BLS, BLS/D:717,60BLS,
9:00 10:00 1:00
T/DESP:3661,40BLS.BSW: 1,2%, TGAS:76°F, QGAS: 0,69 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:28,60BLS, BLS/D:686,40BLS,
10:00 11:00 1:00
T/DESP:3690,0BLS.BSW: 5,2%, TGAS:76°F, QGAS: 0,71 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:31,2BLS, BLS/D:748,80BLS,
11:00 12:00 1:00
T/DESP:3721,20BLS. BSW: 4%, TGAS:77°F, QGAS: 0,71 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 156,65 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:21,45BLS, BLS/D:514,80BLS, T/DESP:
12:00 13:00 1:00
3742,65BLS.BSW: 4%, TGAS:76°F, QGAS: 0,71 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:28,60BLS, BLS/D:686,40BLS,
13:00 14:00 1:00
T/DESP:3771,25BLS.BSW: 4%, TGAS:76°F, QGAS: 0,71 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:31,20BLS, BLS/D:748,80LS,
14:00 15:00 1:00
T/DESP:3802,45BLS.BSW:4%, TGAS:76°F, QGAS: 0,76 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:33,80BLS, BLS/D:811,20BLS,
15:00 16:00 1:00
T/DESP:3836,25BLS.BSW: 30%, TGAS:86°F, QGAS: 0,75 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:41,60BLS, BLS/D:998,40BLS,
16:00 17:00 1:00
T/DESP:3877,95BLS.BSW: 30%, TGAS:86°F, QGAS: 0,75 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:27,30BLS, BLS/D:655,20BLS, T/DESP:33905,15
17:00 18:00 1:00
BLS. BSW: 30%, TGAS:84°F, QGAS: 0,706 MMSCFD.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:24,70BLS, BLS/D: 592,80
18:00 19:00 1:00
BLS, T/DESP:3929,95BLS .BSW: 30%, TGAS:80°F, QGAS: 0,71 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:31,20BLS, BLS/D:748,80BLS, T/DESP:3961,05
19:00 20:00 1:00
BLS, BSW:8,5%, TGAS:80°F, QGAS: 0,71 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 36,40BLS, BLS/D:873,6BLS,
20:00 21:00 1:00
T/DESP:3997,45BLS, BSW:8,5%, TGAS:77°F, QGAS: 0,625 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 28,60BLS, BLS/D:686,40BLS,
21:00 22:00 1:00
T/DESP:4026,05BLS, BSW:8,5%, TGAS:77°F, QGAS: 0,625 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:33,8BLS, BLS/D: 811,20BLS,
22:00 23:00 1:00
T/DESP:4059,85BLS, BSW:8,5%, TGAS:77°F, QGAS: 0,625 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624 BLS, T/DESP:4085,85BLS,
23:00 23:59 0:59
BSW:4%, TGAS:77°F, QGAS: 0,625 MMSCFD.
a
TOTAL D./24 HRS 675,35 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 4085,85 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

VIAJES DE VACUUM 4.00 #01 VIAJE DE VACUMS CON 150,80BLS. #02 VIAJES DE VACUMS CON 150,80 BLS. #03 VIAJE DE VACUMS CON 156,65BLS. #04 VIAJES DE VACUMS CON 150,80 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/21/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TECNICO II: PEDRO MATA; TEC I: LEONARDO GARCIA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA

POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS, T/DESP:4111,85BLS, BSW:4%,
0:00 1:00 1:00
TGAS:77°F, QGAS: 0,625 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:15,60BLS, BLS/D: 374,40BLS, T/DESP:3127,45BLS,
1:00 2:00 1:00
BSW:0,4%, TGAS:77°F, QGAS: 0,656 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:19,5BLS, BLS/D:468BLS, T/DESP: 4146,95BLS, BSW:0,4%,
2:00 3:00 1:00 TGAS:76°F, QGAS: 0,656 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 20,8BLS, BLS/D:499,2BLS, T/DESP:4167,75BLS, BSW: 0,4%,
3:00 4:00 1:00
TGAS:75°F, QGAS: 0,656 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:18,2BLS, BLS/D:436,8BLS, T/DESP:4185,95BLS,
4:00 5:00 1:00
BSW:0,4%, TGAS: 75°F, QGAS: 0,656 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,40BLS, BLS/D:561,60BLS,
5:00 6:00 1:00 T/DESP:4209,35BLS.BSW:0,4%, TGAS:76°F, QGAS: 0,656 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 150,80 BLS C/U, CON DESTINO A LA EST. LA
a CEIBA.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:15,6 BLS, BLS/D: 374,40
6:00 7:00 1:00
BLS, T/DESP: 4229,95BLS,
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 15,6 BLS, BLS/D: 374,4BLS,
7:00 8:00 1:00
T/DESP:4240,55BLS.BSW: 1,2%, TGAS:78°F, QGAS: 0,685 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 23,4 BLS, BLS/D: 561BLS,
8:00 9:00 1:00
T/DESP:4263,95BLS.BSW: 1,2%, TGAS:78°F, QGAS: 0,699 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:31,2BLS, BLS/D:748,80BLS,
9:00 10:00 1:00
T/DESP:4295,15BLS.BSW: 1,2%, TGAS:76°F, QGAS: 0,69 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,40BLS, BLS/D:561,60BLS,
10:00 11:00 1:00
T/DESP:418,55BLS.BSW: 1,2%, TGAS:78°F, QGAS: 0,65 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 156,65 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:22,75BLS, BLS/D:546BLS, T/DESP:4341,30BLS.
11:00 12:00 1:00
BSW: 1,2%, TGAS:78°F, QGAS: 0,65 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:15,6BLS, BLS/D:374,4BLS, T/DESP:
12:00 13:00 1:00
4356,9BLS.BSW: 0,6%, TGAS:78°F, QGAS: 0,70 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26BLS, BLS/D:624BLS,
13:00 14:00 1:00
T/DESP:4382,90BLS.BSW: 06%, TGAS:78°F, QGAS: 0,64 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,80BLS, BLS/D:499,2LS,
14:00 15:00 1:00
T/DESP:4403,7BLS.BSW:0,6%, TGAS:78°F, QGAS: 0,64 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,40BLS, BLS/D:561,60BLS,
15:00 16:00 1:00
T/DESP:4427,10BLS.BSW: 0,6%, TGAS:78°F, QGAS: 0,66 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,4BLS, BLS/D:561,6BLS,
16:00 17:00 1:00
T/DESP:4450,5BLS.BSW: 5,6%, TGAS:78°F, QGAS: 0,70 MMSCFD.
a
POZOS (TAG-18, TAG-17, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:20,80BLS, BLS/D:499,2BLS, T/DESP:4471,30
17:00 18:00 1:00
BLS. BSW: 5%, TGAS:78°F, QGAS: 0,70 MMSCFD.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:31,20BLS, BLS/D: 748,80
18:00 19:00 1:00
BLS, T/DESP:4502,50BLS .BSW: -%, TGAS:78°F, QGAS: N/A MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:70,2BLS, BLS/D: 1684,8BLS,
19:00 20:00 1:00
T/DESP:4572,70 BLS, BSW:-%, TGAS:80°F, QGAS: N/A MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,2BLS, BLS/D:1372,80BLS,
20:00 21:00 1:00
T/DESP:4629,9BLS, BSW:-%, TGAS:80°F, QGAS: N/A MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,80BLS, BLS/D:1435,20BLS,
21:00 22:00 1:00
T/DESP:4689,7BLS, BSW:-%, TGAS:80°F, QGAS: N/A MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:67,60BLS, BLS/D: 1622,40BLS,
22:00 23:00 1:00
T/DESP:4757,30BLS, BSW:2%, TGAS:78°F, QGAS: 2,131 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2BLS, BLS/D:1372,8 BLS,
23:00 23:59 0:59
T/DESP:4814,50BLS, BSW:0,4%, TGAS:78°F, QGAS: 2,087 MMSCFD.
a
TOTAL D./24 HRS 728,45 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 4814,50 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

VIAJES DE VACUUM 4.00 #01 VIAJE DE VACUMS CON 150,80BLS. #02 VIAJES DE VACUMS CON 150,80 BLS. #03 VIAJE DE VACUMS CON 153,4BLS. #04 VIAJES DE VACUMS CON 152,80 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/22/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TECNICO II: PEDRO MATA; TEC I: LEONARDO GARCIA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA

POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:4866,5BLS,
0:00 1:00 1:00
BSW:0,4%, TGAS:78°F, QGAS: 0,2,173 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:67,60BLS, BLS/D: 1622,4BLS, T/DESP:4934,10BLS,
1:00 2:00 1:00
BSW:0,4%, TGAS:78°F, QGAS: 2,087 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP: 4986,10BLS,
2:00 3:00 1:00 BSW:0,2%, TGAS:78°F, QGAS: 2,131 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,2 BLS, BLS/D:1372,8BLS, T/DESP:5043,30BLS,
3:00 4:00 1:00
BSW: 0,2%, TGAS:78°F, QGAS: 2,131 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6BLS, BLS/D:1310,40BLS,
4:00 5:00 1:00 T/DESP:5097,90BLS, BSW:0,2%, TGAS: 78°F, QGAS: 2,087 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 150,80 BLS C/U, CON DESTINO A LA EST.
a LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,40BLS, BLS/D:1497,60BLS,
5:00 6:00 1:00
T/DESP:5160,30BLS.BSW:0,2%, TGAS:78°F, QGAS: 2,173 MMSCFD.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:44,2 BLS, BLS/D: 1060,8
6:00 7:00 1:00
BLS, T/DESP: 5204,50BLS,
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,6 BLS, BLS/D: 1310,4 BLS,
7:00 8:00 1:00
T/DESP:5259,10BLS.BSW: 0,2%, TGAS:75°F, QGAS: 2,222 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 150,80 BLS y 156 BLS, A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D: 1497,6BLS,
8:00 9:00 1:00
T/DESP:5321,5BLS.BSW: 0,2%, TGAS:75°F, QGAS: 2,304 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4BLS, BLS/D:1185,6BLS,
9:00 10:00 1:00
T/DESP:5370,90BLS.BSW: 0,2%, TGAS:75°F, QGAS: 2,344 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:67,60BLS, BLS/D:1622,40BLS,
10:00 11:00 1:00
T/DESP:5468,50BLS.BSW: 0,2%, TGAS:76°F, QGAS: 2,135 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80BLS, BLS/D:1123,20BLS,
11:00 12:00 1:00
T/DESP:5485,3BLS. BSW: 0,2%, TGAS:76°F, QGAS: 2,240 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,4BLS, BLS/D:1497,6BLS, T/DESP:
12:00 13:00 1:00
5547,70BLS.BSW: 0,2%, TGAS:76°F, QGAS: 2,341 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6BLS, BLS/D:1310, 40BLS,
13:00 14:00 1:00
T/DESP:5602,30BLS.BSW: 0,2%, TGAS:76°F, QGAS: 2,135 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS,
14:00 15:00 1:00
T/DESP:5654,3BLS.BSW:0,2%, TGAS:76°F, QGAS: 2,15 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 153,40 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,20BLS, BLS/D:1372,80BLS,
15:00 16:00 1:00
T/DESP:5711,5BLS.BSW: 0,2%, TGAS:76°F, QGAS:2,13 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:67,6BLS, BLS/D:1622,40BLS,
16:00 17:00 1:00
T/DESP:5779,1BLS.BSW: 0,2%, TGAS:76°F, QGAS: 2,13 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80BLS, BLS/D:1123,20BLS,
17:00 18:00 1:00
T/DESP:5825,9 BLS. BSW: 0,2%, TGAS:76°F, QGAS: 2,13 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
a
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:59,80BLS, BLS/D: 1435,20
18:00 19:00 1:00
BLS, T/DESP:5885,70BLS, TGAS:78°F, QGAS: 2,215 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,60BLS, BLS/D: 1310,4 BLS,
19:00 20:00 1:00
T/DESP:5940,30BLS, BSW: 0,2%, TGAS:78°F, QGAS: 2,173 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D: 1248 BLS,
20:00 21:00 1:00
T/DESP:5992,3 BLS.BSW: 0,2%, TGAS:78°F, QGAS: 5992,30 MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,40BLS, BLS/D: 1498 BLS,
21:00 22:00 1:00
T/DESP:6054,7BLS .BSW: 0,2%, TGAS: 2,215°F, QGAS: N/A MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2BLS, BLS/D: 1372,8 BLS,
22:00 23:00 1:00
T/DESP:6111,90BLS .BSW: 0,2%, TGAS:76°F, QGAS: 2,173MMSCFD.
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D: 1248 BLS,
23:00 23:59 0:59
T/DESP:6163,9BLS .BSW: 0,2 %, TGAS:78°F, QGAS: 2,178MMSCFD.
a
TOTAL D./24 HRS 1349,40 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 6163,90 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUMS CON 150,80BLS. #02 VIAJES DE VACUMS CON 150,80 BLS. #03 VIAJE DE VACUMS CON 150,8BLS. #04 VIAJES DE VACUMS CON 156 BLS.

VIAJES DE VACUUM 9.00 #05 VIAJE DE VACUMS CON 156BLS. #06 VIAJES DE VACUMS CON 150,80 BLS. #07 VIAJE DE VACUMS CON 153,4BLS. #08 VIAJES DE VACUMS CON 150,8 BLS.

#09 VIAJE DE VACUMS CON 150BLS.


HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/23/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: LEANDRO GARCIA, TECNICO II: RAMON RODRIGUEZ, TEC I: LUIS MARCANO, SIHO-A: CLARIVEL ORTIZ.
PERSONAL
SUPERVISOR: JESÚS RAMOS; TÉCNICO II: JESÚS CHIRINOS; TEC I: EXÓN SOLÓRZANO; SIHO-A: LEÍDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:6215,90BLS, BSW:0,2%,
0:00 1:00 1:00
a TGAS:76°F, QGAS: 2,178 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,8BLS, BLS/D: 1123,2BLS, T/DESP:6262,7BLS, BSW:0,2%,
1:00 2:00 1:00
a TGAS:76°F, QGAS: 2,092 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP: 6314,70BLS, BSW:0,2%,
2:00 3:00 1:00
a TGAS:78°F, QGAS: 2,131 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,8 BLS, BLS/D:1435,2BLS, T/DESP:6374,50BLS, BSW:
3:00 4:00 1:00
a 0,2%, TGAS:78°F, QGAS: 2,131 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:6426,50BLS,
4:00 5:00 1:00
a BSW:0,2%, TGAS: 78°F, QGAS: 2,087 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, 2 VIAJES DE VACUUM CON 150,80 BLS , 153,4 BLS CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2BLS, BLS/D:1372,8BLS,
5:00 6:00 1:00
a T/DESP:6483,70BLS.BSW:0,2%, TGAS:78°F, QGAS: 2,173 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:52BLS, BLS/D: 1248BLS, T/DESP:
6:00 7:00 1:00
a 6535,70BLS,
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,15 BLS, BLS/D: 1419,6 BLS,
7:00 8:00 1:00
a T/DESP:6594,85BLS.BSW: 0,2%, TGAS:78°F, QGAS: 2,130 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, 2 VIAJES DE VACUUM CON 153,4 BLS Y 150,8 BLS, A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,2BLS, BLS/D: 1372,8BLS,
8:00 9:00 1:00
a T/DESP:6652,05BLS.BSW: 0,2%, TGAS:78°F, QGAS: 2,131 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2BLS, BLS/D:1372,8BLS,
9:00 10:00 1:00
a T/DESP:6709,25BLS.BSW: 0,2%, TGAS:78°F, QGAS: 2,131 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS,
10:00 11:00 1:00
a T/DESP:6761,25BLS.BSW: 0,2%, TGAS:76°F, QGAS: 2,135 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:44,2BLS, BLS/D:1060,8BLS,
11:00 12:00 1:00
a T/DESP:6805,45BLS. BSW: 0,2%, TGAS:78°F, QGAS: 2,18 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, 2 VIAJES DE VACUUM CON 156,65BLS Y 152,4 A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:56,55BLS, BLS/D:1357,2,6BLS, T/DESP:
12:00 13:00 1:00
a 6862,00BLS.BSW: 0,2%, TGAS:76°F, QGAS: 2,12 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,15BLS, BLS/D:1107,6BLS,
13:00 14:00 1:00
a T/DESP:6908,15BLS.BSW: 0,2%, TGAS:76°F, QGAS: 2,18 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:61,1BLS, BLS/D:1466,4BLS,
14:00 15:00 1:00
a T/DESP:6969,25BLS.BSW:0,2%, TGAS:76°F, QGAS: 2,15 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,20BLS, BLS/D:1372,80BLS,
15:00 16:00 1:00
a T/DESP:7026,45BLS.BSW: 0,2%, TGAS:80°F, QGAS:2,20 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, 2 VIAJES DE VACUUM CON 150,8 Y 150,8BLS A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:51,35BLS, BLS/D:1232,4BLS,
16:00 17:00 1:00
a T/DESP:5779,1BLS.BSW: 0,2%, TGAS:76°F, QGAS: 2,36 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:51,35BLS, BLS/D:1232,4BLS, T/DESP:7129,15
17:00 18:00 1:00
a BLS. BSW: 0,2%, TGAS:80°F, QGAS: 2,26 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 54,60BLS, BLS/D: 1310,4 BLS,
18:00 19:00 1:00
a T/DESP:7183,75BLS, TGAS:79°F, QGAS: 2,16 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:7235,75 BLS.
19:00 20:00 1:00
a BSW: 0,2%, TGAS:76°F, QGAS: 2,12 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:7287,75 BLS.
20:00 21:00 1:00
a BSW: 0,2%, TGAS:76°F, QGAS: 2,17 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,40 BLS, BLS/D:1497,6 BLS, T/DESP:7350,15
21:00 22:00 1:00
a BLS. BSW: 0,2%, TGAS:76°F, QGAS: 2,05 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:7402,15 BLS.
22:00 23:00 1:00
a BSW: 0,2%, TGAS:76°F, QGAS: 2,08 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:7454,15 BLS.
23:00 23:59 0:59
a BSW: 0,2%, TGAS:76°F, QGAS: 2,12 MMSCFD.
TOTAL D./24 HRS 1290 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 7454,15 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUMS CON 150,80BLS. #02 VIAJES DE VACUUMS CON 153,4 BLS. #03 VIAJE DE VACUUMS CON 150,8BLS. #04 VIAJES DE VACUUMS CON 150,8 BLS.

VIAJES DE VACUUM 8.00 #05 VIAJE DE VACUUMS CON 156,65BLS. #06 VIAJES DE VACUUMS CON 152,1 BLS. #07 VIAJE DE VACUUMS CON 152,1BLS. #08 VIAJES DE VACUUMS CON 150,8 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/24/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: LEANDRO GARCIA, TECNICO II: RAMON RODRIGUEZ, TEC I: LUIS MARCANO, SIHO-A: CLARIVEL ORTIZ.
PERSONAL
SUPERVISOR: JESÚS RAMOS; TÉCNICO II: JESÚS CHIRINOS; TEC I: EXÓN SOLÓRZANO; SIHO-A: LEÍDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:7506,15BLS, BSW:0,2%, TGAS:76°F,
0:00 1:00 1:00
a QGAS: 2,178 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,8BLS, BLS/D: 1123,2BLS, T/DESP:7552,95BLS, BSW:0,2%,
1:00 2:00 1:00
a TGAS:76°F, QGAS: 2,05 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP: 7604,95BLS, BSW:0,2%, TGAS:73°F,
2:00 3:00 1:00
a QGAS: 2,04 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248BLS, T/DESP:7656,95BLS, BSW: 0,2%, TGAS:73°F,
3:00 4:00 1:00
a QGAS: 2,06 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2BLS, BLS/D:1372,8BLS, T/DESP:7714,15BLS,
4:00 5:00 1:00
a BSW:0,2%, TGAS: 78°F, QGAS: 2,01 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, 2 VIAJES DE VACUUM CON 150,80 BLS , 153,4 BLS CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2BLS, BLS/D:1372,8BLS,
5:00 6:00 1:00
a T/DESP:6483,70BLS.BSW:0,2%, TGAS:78°F, QGAS: 2,173 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:52BLS, BLS/D: 1248BLS, T/DESP:
6:00 7:00 1:00
a 6535,70BLS,
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,2 BLS, BLS/D: 1372,8 BLS, T/DESP:7880,55BLS.BSW:
7:00 8:00 1:00
a 0,2%, TGAS:73°F, QGAS: 2,01 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, 2 VIAJES DE VACUUM CON 150,8 BLS Y 150,8 BLS, A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,2BLS, BLS/D: 1372,8BLS, T/DESP:7937,75BLS.BSW:
8:00 9:00 1:00
a 0,2%, TGAS:73°F, QGAS: 2,17 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:59,8BLS, BLS/D:1435,2BLS, T/DESP:7997,55BLS.BSW:
9:00 10:00 1:00
a 0,2%, TGAS:73°F, QGAS: 2,17 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52,65BLS, BLS/D:1264BLS, T/DESP:8050,20BLS.BSW:
10:00 11:00 1:00
a 0,2%, TGAS:74°F, QGAS: 2,15 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:48,75BLS, BLS/D:1170BLS, T/DESP:8098,95BLS. BSW:
11:00 12:00 1:00
a 0,2%, TGAS:74°F, QGAS: 2,15 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, 2 VIAJES DE VACUUM CON 156 BLS Y 158.6 , CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:48,1BLS, BLS/D:1154BLS, T/DESP: 8147,05BLS.BSW:
12:00 13:00 1:00
a 0,2%, TGAS:74°F, QGAS: 2,19 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,15BLS, BLS/D:1107,6BLS, T/DESP:8193,20BLS.BSW:
13:00 14:00 1:00
a 0,2%, TGAS:74°F, QGAS: 2,19 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52,65BLS, BLS/D:1264BLS,
14:00 15:00 1:00
a T/DESP:8245,85BLS.BSW:0,2%, TGAS:75°F, QGAS: 2,10 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6BLS, BLS/D:1310BLS, T/DESP:8300,45BLS.BSW:
15:00 16:00 1:00
a 0,2%, TGAS:75°F, QGAS:2,10 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, 2 VIAJES DE VACUUM CON 152,1 Y 150,8BLS A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:50,7BLS, BLS/D:1216,8BLS, T/DESP:8351,15BLS.BSW:
16:00 17:00 1:00
a 0,2%, TGAS:75°F, QGAS: 2,19 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:8403,15 BLS. BSW: 0,2%,
17:00 18:00 1:00
a TGAS:75°F, QGAS: 2,10 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 48,1BLS, BLS/D: 1154,4 BLS,
18:00 19:00 1:00
a T/DESP:8451,25BLS, TGAS:74°F, QGAS: 2,1 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4BLS, BLS/D:1185,6BLS, T/DESP:8500,6 BLS. BSW:
19:00 20:00 1:00
a 0,2%, TGAS:74°F, QGAS: 2,19 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:8552,6 BLS. BSW: 0,2%,
20:00 21:00 1:00
a TGAS:74°F, QGAS: 2,21 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6 BLS, BLS/D:1310,4 BLS, T/DESP:8607,2 BLS. BSW:
21:00 22:00 1:00
a 0,2%, TGAS:73°F, QGAS: 2,19 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40BLS, BLS/D:1185,6BLS, T/DESP:8656,65 BLS. BSW:
22:00 23:00 1:00
a 0,2%, TGAS:73°F, QGAS: 2,17 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:50,05BLS, BLS/D:1201,2BLS, T/DESP:8706,70 BLS. BSW:
23:00 23:59 0:59
a 0,2%, TGAS:73°F, QGAS: 2,21 MMSCFD.
TOTAL D./24 HRS 1290 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 7454,15 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUMS CON 150,80BLS. #02 VIAJES DE VACUUMS CON 150,8 BLS. #03 VIAJE DE VACUUMS CON 150,8BLS. #04 VIAJES DE VACUUMS CON 150,8 BLS.

VIAJES DE VACUUM 8.00 #05 VIAJE DE VACUUMS CON 156BLS. #06 VIAJES DE VACUUMS CON 158,6 BLS. #07 VIAJE DE VACUUMS CON 152,1BLS. #08 VIAJES DE VACUUMS CON 150,8 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/25/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: LEANDRO GARCIA, TECNICO II: RAMON RODRIGUEZ, TEC I: LUIS MARCANO, SIHO-A: CLARIVEL ORTIZ.
PERSONAL
SUPERVISOR: JESÚS RAMOS; TÉCNICO II: JESÚS CHIRINOS; TEC I: EXÓN SOLÓRZANO; SIHO-A: LEÍDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:8758,70BLS, BSW:0,2%, TGAS:73°F, QGAS: 2,13 MMSCFD.
0:00 1:00 1:00
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:53,95BLS, BLS/D: 1295BLS, T/DESP:8812,65BLS, BSW:0,2%, TGAS:73°F, QGAS: 2,17 MMSCFD.
1:00 2:00 1:00
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,8BLS, BLS/D:1123BLS, T/DESP: 8859,45BLS, BSW:0,2%, TGAS:73°F, QGAS: 2,13 MMSCFD.
2:00 3:00 1:00
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 41,6 BLS, BLS/D:998,4BLS, T/DESP:8901,05BLS, BSW: 0,2%, TGAS:72°F, QGAS: 2,19 MMSCFD.
3:00 4:00 1:00
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:8953,05BLS, BSW:0,2%, TGAS: 72°F, QGAS: 2,7
4:00 5:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, 2 VIAJES DE VACUUM CON 156 BLS , 156 BLS CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:9005,05BLS.BSW:0,2%, TGAS:72°F, QGAS: 2,15
5:00 6:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:52BLS, BLS/D: 1248BLS, T/DESP: 9057,05BLS,
6:00 7:00 1:00
a
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 67,6 BLS, BLS/D: 11622 BLS, T/DESP:9124,65BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,13
7:00 8:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, 2 VIAJES DE VACUUM CON 150,8 BLS Y 150,8 BLS, A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52BLS, BLS/D: 1248BLS, T/DESP:9176,65BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,13
8:00 9:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:65BLS, BLS/D:1560BLS, T/DESP:9241,65BLS.BSW: 0,1%, TGAS:74°F, QGAS: 2,17
9:00 10:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,4BLS, BLS/D:1497,6BLS, T/DESP:9304,05BLS.BSW: 0,1%, TGAS:74°F, QGAS: 2,19
10:00 11:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:39BLS, BLS/D:936BLS, T/DESP:9343,05BLS. BSW: 0,1%, TGAS:74°F, QGAS: 2,19
11:00 12:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, 2 VIAJES DE VACUUM CON 158,6 BLS Y 156 , CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:55,25BLS, BLS/D:1326BLS, T/DESP: 9398,30BLS.BSW: 0,1%, TGAS:74°F, QGAS: 2,23
12:00 13:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:53,3BLS, BLS/D:1279,2BLS, T/DESP:9451,6BLS.BSW: 0,2%, TGAS:74°F, QGAS: 2,23
13:00 14:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:9503,6BLS.BSW:0,2%, TGAS:75°F, QGAS: 2,17
14:00 15:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6BLS, BLS/D:1310BLS, T/DESP:9558,2BLS.BSW: 0,2%, TGAS:74°F, QGAS:2,15
15:00 16:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, 2 VIAJES DE VACUUM CON 150,8 Y 150,8BLS A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:9610,20BLS.BSW: 0,2%, TGAS:74°F, QGAS: 2,15
16:00 17:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:48,1BLS, BLS/D:1154.4BLS, T/DESP:9658,3 BLS. BSW: 0,2%, TGAS:74°F, QGAS: 2,15
17:00 18:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 52BLS, BLS/D: 1248 BLS, T/DESP:9710,30BLS, TGAS:74°F, QGAS: 2,17
18:00 19:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:9762,30 BLS. BSW: 0,2%, TGAS:74°F, QGAS: 2,17
19:00 20:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,8 BLS, BLS/D:1123,2 BLS, T/DESP:9809,10 BLS. BSW: 0,2%, TGAS:74°F, QGAS:
20:00 21:00 1:00
a 2,13MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:9861,10 BLS. BSW: 0,2%, TGAS:73°F, QGAS: 2,17
21:00 22:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80BLS, BLS/D:1123,8BLS, T/DESP:9907,9 BLS. BSW: 0,2%, TGAS:73°F, QGAS: 2,19
22:00 23:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:9959,9 BLS. BSW: 0,2%, TGAS:73°F, QGAS:
23:00 23:59 0:59
a 2,17MMSCFD.
TOTAL D./24 HRS 1253,20 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 9959,90 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACION LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUMS CON 150,80BLS. #02 VIAJES DE VACUUMS CON 150,8 BLS. #03 VIAJE DE VACUUMS CON 158,6BLS. #04 VIAJES DE VACUUMS CON 156 BLS.

VIAJES DE VACUUM 8.00 #05 VIAJE DE VACUUMS CON 154,05BLS. #06 VIAJES DE VACUUMS CON 150,8 BLS. #07 VIAJE DE VACUUMS CON 150,8BLS. #08 VIAJES DE VACUUMS CON 150,8 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/26/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: LEANDRO GARCÍA, TÉCNICO II: RAMÓN RODRÍGUEZ, TEC I: LUÍS MARCANO, SIHO-A: CLARIVEL ORTIZ.
PERSONAL
SUPERVISOR: JESÚS RAMOS; TÉCNICO II: JESÚS CHIRINOS; TEC I: EXÓN SOLÓRZANO; SIHO-A: LEÍDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6BLS, BLS/D:1310,40BLS, T/DESP:10014,50BLS, BSW:0,1%,
0:00 1:00 1:00
a TGAS:73°F, QGAS: 2,28 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:59,8BLS, BLS/D: 1435,20BLS, T/DESP:10074,30BLS, BSW:0,1%,
1:00 2:00 1:00
a TGAS:73°F, QGAS: 2,30MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:41,6BLS, BLS/D:1123,2BLS, T/DESP: 10115,90BLS, BSW:0,1%,
2:00 3:00 1:00
a TGAS:73°F, QGAS: 2,30 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248BLS, T/DESP:10167,90BLS, BSW: 0,1%,
3:00 4:00 1:00
a TGAS:73°F, QGAS: 2,26 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:10219,90BLS,
4:00 5:00 1:00
a BSW:0,1%, TGAS: 73°F, QGAS: 2,7 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 150,8 BLS , 150,8 BLS CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,8BLS, BLS/D:1123,2BLS,
5:00 6:00 1:00
a T/DESP:10266,70BLS.BSW:0,1%, TGAS:73°F, QGAS: 2,26 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:52BLS, BLS/D: 1248BLS, T/DESP:
6:00 7:00 1:00
a 10318,70BLS,
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D: 1497,6 BLS,
7:00 8:00 1:00
a T/DESP:10381,10BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,17 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 150,8 BLS Y 150,8 BLS, A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 67,6BLS, BLS/D: 1622,4BLS,
8:00 9:00 1:00
a T/DESP:10448,7BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,17 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:47,45BLS, BLS/D:1138.8BLS,
9:00 10:00 1:00
a T/DESP:10496,15BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,15 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:53,3BLS, BLS/D:1279,2BLS,
10:00 11:00 1:00
a T/DESP:10549,45BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,17 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:47,45BLS, BLS/D:1138,8BLS, T/DESP:1O596,9BLS.
11:00 12:00 1:00
a BSW: 0,1%, TGAS:73°F, QGAS: 2,17 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 150,8 BLS Y 153,4 Bls , CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:50,7BLS, BLS/D:1216,8BLS, T/DESP:
12:00 13:00 1:00
a 10647,6BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,17MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4BLS, BLS/D:1185,6BLS,
13:00 14:00 1:00
a T/DESP:10697,00BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,21 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS,
14:00 15:00 1:00
a T/DESP:10749,00BLS.BSW:0,1%, TGAS:73°F, QGAS: 2,21 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:10801BLS.BSW:
15:00 16:00 1:00
a 0,2%, TGAS:73°F, QGAS:2,21 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 152,1 Y 150,8BLS A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:10853BLS.BSW:
16:00 17:00 1:00
a 0,1%, TGAS:73°F, QGAS: 2,21 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:41,6BLS, BLS/D:998,4BLS, T/DESP:10894,60 BLS.
17:00 18:00 1:00
a BSW: 0,2%, TGAS:72°F, QGAS: 2,17 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 52BLS, BLS/D: 1248 BLS,
18:00 19:00 1:00
a T/DESP:10946,6BLS, TGAS:72°F, QGAS: 2,19 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2BLS, BLS/D:1372,8BLS, T/DESP:11003,8 BLS.
19:00 20:00 1:00
a BSW: 0,2%, TGAS:72°F, QGAS: 2,24 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2 BLS, BLS/D:1372,8 BLS, T/DESP:11061,0 BLS.
20:00 21:00 1:00
a BSW: 0,2%, TGAS:72°F, QGAS: 2,24MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:41,6 BLS, BLS/D:998,4 BLS, T/DESP:11102,60 BLS.
21:00 22:00 1:00
a BSW: 0,2%, TGAS:72°F, QGAS: 2,22 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80BLS, BLS/D:1123,8BLS, T/DESP:9907,9 BLS.
22:00 23:00 1:00
a BSW: 0,2%, TGAS:72°F, QGAS: 2,22 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:9959,9 BLS. BSW:
23:00 23:59 0:59
a 0,2%, TGAS:72°F, QGAS: 2,24 MMSCFD.
TOTAL D./24 HRS 1241,50 bls TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 11201,4 bls TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 150,80BLS. #02 VIAJES DE VACUUM CON 150,8 BLS. #03 VIAJE DE VACUUM CON 150,8BLS. #04 VIAJES DE VACUUM CON 150,8 BLS.
VIAJES DE VACUUM 8.00 #05 VIAJE DE VACUUM CON 150,8BLS. #06 VIAJES DE VACUUM CON 153,4 BLS. #07 VIAJE DE VACUUM CON 152,1BLS. #08 VIAJES DE VACUUM CON 150,8 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/27/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: LEANDRO GARCÍA, TÉCNICO II: RAMÓN RODRÍGUEZ, TEC I: LUÍS MARCANO, SIHO-A: CLARIVEL ORTIZ.
PERSONAL
SUPERVISOR: JESÚS RAMOS; TÉCNICO II: JESÚS CHIRINOS; TEC I: EXÓN SOLÓRZANO; SIHO-A: LEÍDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:41,6BLS, BLS/D:998,4 BLS, T/DESP:11243,00BLS, BSW:0,1%,
0:00 1:00 1:00
a TGAS:73°F, QGAS: 2,28 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D: 1248 BLS, T/DESP:11295,00 BLS, BSW:0,1%,
1:00 2:00 1:00
a TGAS:73°F, QGAS: 2,30MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248 BLS, T/DESP: 11347,00BLS, BSW:0,1%,
2:00 3:00 1:00
a TGAS:73°F, QGAS: 2,30 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,8 BLS, BLS/D:1123,2 BLS, T/DESP:11393,80BLS, BSW: 0,1%,
3:00 4:00 1:00
a TGAS:73°F, QGAS: 2,26 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:11445,80BLS,
4:00 5:00 1:00
a BSW:0,1%, TGAS: 73°F, QGAS: 2,7 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 150,8 BLS C/U, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2 BLS, BLS/D:1372,8BLS,
5:00 6:00 1:00
a T/DESP:11503,00BLS.BSW:0,1%, TGAS:73°F, QGAS: 2,26 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:52BLS, BLS/D: 1248BLS, T/DESP:
6:00 7:00 1:00
a 11555,00BLS,
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 70,2 BLS, BLS/D: 1684,8 BLS, T/DESP:11625,20
7:00 8:00 1:00
a BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,17 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 150,8 BLS Y 156 BLS, A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 72,8 BLS, BLS/D: 1747,2 BLS, T/DESP:11698,00
8:00 9:00 1:00
a BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,17 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:67,6 BLS, BLS/D:1622,4 BLS, T/DESP:11765,60
9:00 10:00 1:00
a BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,15 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4 BLS, BLS/D:1185,6 BLS, T/DESP:11815,00
10:00 11:00 1:00
a BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,17 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:44,2 BLS, BLS/D:11859,20 BLS, T/DESP:11859,20
11:00 12:00 1:00
a BLS. BSW: 0,1%, TGAS:73°F, QGAS: 2,17 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, TRES (3) VIAJES DE VACUUM CON 156 BLS, 150,8 Bls Y 150,8 Bls CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:65 BLS, BLS/D:1560 BLS, T/DESP: 11924,20
12:00 13:00 1:00
a BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,17MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:67,6 BLS, BLS/D:1622,4 BLS, T/DESP:11991,80
13:00 14:00 1:00
a BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,21 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:59,8 BLS, BLS/D:1435,2 BLS, T/DESP:12051,60
14:00 15:00 1:00
a BLS.BSW:0,1%, TGAS:73°F, QGAS: 2,21 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D:1185,6 BLS, T/DESP:12101,00
15:00 16:00 1:00
a BLS.BSW: 0,1%, TGAS:73°F, QGAS:2,21 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, TRES (3) VIAJES DE VACUUM CON 153,4 BLS, 150,8 BLS Y 150,8 BLS A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:55,90 BLS, BLS/D:1341,6 BLS, T/DESP:12156,90
16:00 17:00 1:00
a BLS.BSW: 0,1%, TGAS:73°F, QGAS: 2,21 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:42,90 BLS, BLS/D:1029,6 BLS, T/DESP:12199,80
17:00 18:00 1:00
a BLS. BSW: 0,1%, TGAS:73°F, QGAS: 2,17 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 52BLS, BLS/D: 1248 BLS,
18:00 19:00 1:00
a T/DESP:12251,80 BLS, TGAS:73°F, QGAS: 2,19 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,40 BLS, BLS/D:1497,6 BLS, T/DESP:12314,20
19:00 20:00 1:00
a BLS. BSW: 0,1%, TGAS:73°F, QGAS: 2,24 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:12366,20 BLS.
20:00 21:00 1:00
a BSW: 0,1%, TGAS:73°F, QGAS: 2,24MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:12418,20 BLS.
21:00 22:00 1:00
a BSW: 0,1%, TGAS:73°F, QGAS: 2,22 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H67,60 BLS, BLS/D:1622,4 BLS, T/DESP:12485,80
22:00 23:00 1:00
a BLS. BSW: 0,1%, TGAS:73°F, QGAS: 2,22 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80 BLS, BLS/D:1123,2 BLS, T/DESP:12532,60
23:00 23:59 0:59
a BLS. BSW: 0,1%, TGAS:73°F, QGAS: 2,24 MMSCFD.
TOTAL D./24 HRS 1331.2 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 12532.6 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 150,80BLS. #02 VIAJES DE VACUUM CON 150,8 BLS. #03 VIAJE DE VACUUM CON 150,8BLS. #04 VIAJES DE VACUUM CON 156 BLS.
VIAJES DE VACUUM 10.00 #05 VIAJE DE VACUUM CON 156 BLS. #06 VIAJE DE VACUUM CON 150,8 BLS. #07 VIAJE DE VACUUM CON 150,8 BLS. #08 VIAJE DE VACUUM CON 150,8 BLS. #09 VIAJE DE VAC

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/28/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TÉCNICO II: PEDRO MATA; TEC I: LEONARDO GARCÍA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: LEANDRO GARCÍA, TÉCNICO II: RAMÓN RODRÍGUEZ, TEC I: LUÍS MARCANO, SIHO-A: CLARIVEL ORTIZ.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:41,6BLS, BLS/D:998,4 BLS, T/DESP:12574,200BLS, BSW:0,1%, TGAS:73°F,
0:00 1:00 1:00
a QGAS: 2,24 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,8BLS, BLS/D: 1123,2 BLS, T/DESP:12621 BLS, BSW:0,1%, TGAS:73°F,
1:00 2:00 1:00
a QGAS: 2,22MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4BLS, BLS/D:1185,6BLS, T/DESP: 12670,40BLS, BSW:0,1%, TGAS:73°F,
2:00 3:00 1:00
a QGAS: 2,29 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52BLS, BLS/D:1248BLS, T/DESP:12722,40BLS, BSW: 0,1%, TGAS:73°F,
3:00 4:00 1:00
a QGAS: 2,22 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2BLS, BLS/D:1372,8BLS, T/DESP:12779,60BLS, BSW:0,1%,
4:00 5:00 1:00
a TGAS: 73°F, QGAS: 2,19 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248BLS, T/DESP:12831,60BLS.BSW:0,1%,
5:00 6:00 1:00
a TGAS:73°F, QGAS: 2,31 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:59,8BLS, BLS/D: 1435,2BLS, T/DESP: 12891,40
6:00 7:00 1:00
a BLS, SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,8 BLS, BLS/D: 1123,2 BLS, T/DESP:12938,20 BLS.BSW:
7:00 8:00 1:00
a 0,1%, TGAS:73°F, QGAS: 2,03 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP:12990,20 BLS.BSW: 0,1%,
8:00 9:00 1:00
a TGAS:75°F, QGAS: 1,99 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 145,6 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:70,2 BLS, BLS/D:1684,8 BLS, T/DESP:13060,4 BLS.BSW: 0,1%,
9:00 10:00 1:00
a TGAS:85°F, QGAS: 2,06 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,8 BLS, BLS/D:1123,2 BLS, T/DESP:13107,20 BLS.BSW: 0,1%,
10:00 11:00 1:00
a TGAS:82°F, QGAS: 2,07 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4 BLS, BLS/D:1185,6 BLS, T/DESP:13156,6 BLS. BSW: 0,1%,
11:00 12:00 1:00
a TGAS:73°F, QGAS: 1,96 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:59,8 BLS, BLS/D:1435,20 BLS, T/DESP: 13216,40 BLS.BSW:
12:00 13:00 1:00
a 0,2%, TGAS:86,5°F, QGAS: 2,00MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:75,4 BLS, BLS/D:1809,60 BLS, T/DESP:13291,80 BLS.BSW:
13:00 14:00 1:00
a 0,2%, TGAS:90°F, QGAS: 2,00 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,8 BLS, BLS/D:1123,20 BLS, T/DESP:13338,6 BLS.BSW:0,2%,
14:00 15:00 1:00
a TGAS:90°F, QGAS: 2,05 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D:1185,6 BLS, T/DESP:13388,00 BLS.BSW:
15:00 16:00 1:00
a 0,2%, TGAS:86°F, QGAS:2,01 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:59,80 BLS, BLS/D:1435,2 BLS, T/DESP:13447,8 BLS.BSW: 0,2%,
16:00 17:00 1:00
a TGAS:84°F, QGAS: 2,02 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2 BLS, BLS/D:1372,8 BLS, T/DESP:13505 BLS. BSW: 0,2%,
17:00 18:00 1:00
a TGAS:84°F, QGAS: 2,05 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 53,3BLS, BLS/D: 1279,2 BLS, T/DESP:13558,3
18:00 19:00 1:00
a BLS, TGAS:84°F, QGAS: 2,04 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:50,7BLS, BLS/D:1216,8 BLS, T/DESP:13609,2 BLS. BSW: 0,2%,
19:00 20:00 1:00
a TGAS:84°F, QGAS: 2,04 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:48,1 BLS, BLS/D:1154,4 BLS, T/DESP:13657,1 BLS. BSW: 0,2%,
20:00 21:00 1:00
a TGAS:84°F, QGAS: 1,99MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6 BLS, BLS/D:1310,4 BLS, T/DESP:13711,7 BLS. BSW: 0,2%,
21:00 22:00 1:00
a TGAS:83°F, QGAS: 2,02 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4 BLS, BLS/D:1185,6 BLS, T/DESP:13761,1 BLS. BSW: 0,2%,
22:00 23:00 1:00
a TGAS:83°F, QGAS: 1,97 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2 BLS, BLS/D:1372,8 BLS, T/DESP:13818,3 BLS. BSW: 0,2%,
23:00 23:59 0:59
a TGAS:83°F, QGAS: 2,04 MMSCFD.
TOTAL D./24 HRS 1285.7 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 13818.3 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 150,80BLS. #02 VIAJES DE VACUUM CON 150,8 BLS. #03 VIAJE DE VACUUM CON 150,8BLS. #04 VIAJES DE VACUUM CON 145,6 BLS.
VIAJES DE VACUUM 9.00 #05 VIAJE DE VACUUM CON 150,8 BLS. #06 VIAJE DE VACUUM CON 130,8 BLS. #07 VIAJE DE VACUUM CON 156 BLS. #08 VIAJE DE VACUUM CON 150,8 BLS.
#09 VIAJE DE VACUUM CON 150,8 BLS
HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/29/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TÉCNICO II: PEDRO MATA; TEC I: LEONARDO GARCÍA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: LEANDRO GARCÍA, TÉCNICO II: RAMÓN RODRÍGUEZ, TEC I: LUÍS MARCANO, SIHO-A: CLARIVEL ORTIZ.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6BLS, BLS/D:1310,4 BLS, T/DESP:13872,9BLS, BSW:0,1%, TGAS:83°F,
0:00 1:00 1:00
a QGAS: 2,02 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2BLS, BLS/D: 1372,8 BLS, T/DESP:13930,1 BLS, BSW:0,1%, TGAS:83°F,
1:00 2:00 1:00
a QGAS: 1,99MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2BLS, BLS/D:1372,8 BLS, T/DESP: 13987,3BLS, BSW:0,1%, TGAS:83°F,
2:00 3:00 1:00
a QGAS: 2,04 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 53,95BLS, BLS/D:1294,8BLS, T/DESP:14041,25BLS, BSW: 0,1%, TGAS:83°F,
3:00 4:00 1:00
a QGAS: 1,99 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:50,7BLS, BLS/D:1216,8BLS, T/DESP:14091,95BLS, BSW:0,1%,
4:00 5:00 1:00
a TGAS: 83°F, QGAS: 2,04 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 150,8 BLS Y 152,1 BLS RESPECTIVAMENTE, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,4 BLS, BLS/D:1497,6BLS, T/DESP:14154,35BLS.BSW:0,1%,
5:00 6:00 1:00
a TGAS:83°F, QGAS: 1,95 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156,65 BLS, CON DESTINO A LA EST. LA CEIBA.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:57,2BLS, BLS/D: 1372,8BLS, T/DESP: 14211,55
6:00 7:00 1:00
a BLS.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 49,4 BLS, BLS/D: 1185,6 BLS, T/DESP:14260,95 BLS.BSW:
7:00 8:00 1:00
a 0,2%, TGAS:80,6°F, QGAS: 2,04 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP:14312,95 BLS.BSW: 0,2%,
8:00 9:00 1:00
a TGAS:82,5°F, QGAS: 2,07MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6 BLS, BLS/D:1310,4 BLS, T/DESP:14367,55 BLS.BSW: 0,2%,
9:00 10:00 1:00
a TGAS:84,3°F, QGAS: 2,06 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D: 1497,6 BLS, T/DESP: 14429,95 BLS.BSW:
10:00 11:00 1:00
a 0,2%, TGAS:87,8°F, QGAS: 2,10 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:14481,95 BLS. BSW: 0,2%,
11:00 12:00 1:00
a TGAS:88°F, QGAS: 2,10 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4 BLS, BLS/D:1185,6 BLS, T/DESP: 14531,35 BLS.BSW: 0,2%,
12:00 13:00 1:00
a TGAS:89,5°F, QGAS: 2,05MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:67,6 BLS, BLS/D:1622,4 BLS, T/DESP:14598,95 BLS.BSW: 0,2%,
13:00 14:00 1:00
a TGAS:85°F, QGAS: 2,06 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6 BLS, BLS/D:1310,4 BLS, T/DESP:14653,55 BLS.BSW:0,2%,
14:00 15:00 1:00
a TGAS:86,8°F, QGAS: 2,06 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4 BLS, BLS/D:1185,6 BLS, T/DESP:14702,95 BLS.BSW: 0,2%,
15:00 16:00 1:00
a TGAS:85°F, QGAS:2,06 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6 BLS, BLS/D:1310,4 BLS, T/DESP:14757,55 BLS.BSW: 0,2%,
16:00 17:00 1:00
a TGAS:85°F, QGAS: 2,01 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:14809,55 BLS. BSW: 0,2%,
17:00 18:00 1:00
a TGAS:85°F, QGAS: 2,06 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 50,7BLS, BLS/D: 1216,8 BLS, T/DESP:14860,25
18:00 19:00 1:00
a BLS, TGAS:83°F, QGAS: 2,02 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2BLS, BLS/D:1372,8 BLS, T/DESP:14917,45 BLS. BSW: 0,2%,
19:00 20:00 1:00
a TGAS:83°F, QGAS: 1,99 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 157,3 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52,65 BLS, BLS/D:1263,6 BLS, T/DESP:14970,10 BLS. BSW:
20:00 21:00 1:00
a 0,2%, TGAS:83°F, QGAS: 1,99MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:48,75 BLS, BLS/D:1170 BLS, T/DESP:15018,85 BLS. BSW: 0,2%,
21:00 22:00 1:00
a TGAS:81°F, QGAS: 2,02 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:59,8 BLS, BLS/D:1435,2 BLS, T/DESP:15078,65 BLS. BSW: 0,2%,
22:00 23:00 1:00
a TGAS:81°F, QGAS: 2,04 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:44,2BLS, BLS/D:1060,8BLS, T/DESP:15122,85 BLS. BSW: 0,2%,
23:00 23:59 0:59
a TGAS:80°F, QGAS: 1,98 MMSCFD.
TOTAL D./24 HRS 1304.6 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 15122.9 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 150,8BLS. #02 VIAJES DE VACUUM CON 152,1 BLS. #03 VIAJE DE VACUUM CON 156,65BLS. #04 VIAJES DE VACUUM CON 156 BLS.
VIAJES DE VACUUM 9.00 #05 VIAJE DE VACUUM CON 150,8 BLS. #06 VIAJE DE VACUUM CON 150,8 BLS. #07 VIAJE DE VACUUM CON 150,8 BLS. #08 VIAJE DE VACUUM CON 150,8 BLS. #09 VIAJE DE VACUUM CON

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/30/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TÉCNICO II: PEDRO MATA; TEC I: LEONARDO GARCÍA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: LEANDRO GARCÍA, TÉCNICO II: RAMÓN RODRÍGUEZ, TEC I: LUÍS MARCANO, SIHO-A: CLARIVEL ORTIZ.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:50,05 BLS, BLS/D:1201,2 BLS, T/DESP:15172,9 BLS, BSW:0,1%, TGAS:79°F,
0:00 1:00 1:00
a QGAS: 1,98 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:39 BLS, BLS/D: 936 BLS, T/DESP:15211,9 BLS, BSW:0,1%, TGAS:83°F,
1:00 2:00 1:00
a QGAS: 1,93MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2 BLS, BLS/D:1372,8 BLS, T/DESP: 15269,1BLS, BSW:0,1%, TGAS:78°F,
2:00 3:00 1:00
a QGAS: 2,0 MMSCFD.SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 151,45 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 53,3 BLS, BLS/D:1279,2 BLS, T/DESP:15322,4BLS, BSW: 0,1%, TGAS:78°F,
3:00 4:00 1:00
a QGAS: 1,96 MMSCFD..SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:15374,4 BLS, BSW:0,1%,
4:00 5:00 1:00
a TGAS: 78°F, QGAS: 2,0 MMSCFD. .SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 152,1 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:53,3 BLS, BLS/D:1279,2 BLS, T/DESP:15427,7 BLS.BSW:0,1%,
5:00 6:00 1:00
a TGAS:78°F, QGAS: 2,03 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:49,4 BLS, BLS/D: 1185,6BLS, T/DESP:
6:00 7:00 1:00
a 15477,1BLS.BSW: 0,1%, TGAS:78°F, QGAS: 1,99 MMSCFD
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP:15529,1 BLS.BSW: 0,2%,
7:00 8:00 1:00
a TGAS:78°F, QGAS: 2,00 MMSCFD. UN (1) VIAJES DE VACUUM CON 154,7 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP:15581,1 BLS.BSW: 0,2%,
8:00 9:00 1:00
a TGAS:80°F, QGAS: 2,0MMSCFD. SE REALIZA TRASEGADO DE CRUDO.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6 BLS, BLS/D:1310,4 BLS, T/DESP:15635,7 BLS.BSW: 0,2%,
9:00 10:00 1:00
a TGAS:85°F, QGAS: 2,01 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP: 15687,7 BLS.BSW: 0,2%,
10:00 11:00 1:00
a TGAS:89,6°F, QGAS: 2,05 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 49,4 BLS, BLS/D:1185,6 BLS, T/DESP:15737,1 BLS. BSW: 0,2%,
11:00 12:00 1:00
a TGAS:88,6°F, QGAS: 2,05 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,6 BLS, BLS/D:1310,4 BLS, T/DESP: 15791,7 BLS.BSW: 0,2%,
12:00 13:00 1:00
a TGAS:86°F, QGAS: 2,06MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4 BLS, BLS/D:1185,6 BLS, T/DESP:15841,1 BLS.BSW: 0,2%,
13:00 14:00 1:00
a TGAS:88°F, QGAS: 2,10 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,4 BLS, BLS/D:1497,6 BLS, T/DESP:15903,5 BLS.BSW:0,2%,
14:00 15:00 1:00
a TGAS:90°F, QGAS: 2,09 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:11248 BLS, T/DESP:15955,5 BLS.BSW: 0,2%,
15:00 16:00 1:00
a TGAS:86°F, QGAS:2,15 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2 BLS, BLS/D:1372,8 BLS, T/DESP:16012,7 BLS.BSW: 0,2%,
16:00 17:00 1:00
a TGAS:85°F, QGAS: 2,10 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:16064,7 BLS. BSW: 0,2%,
17:00 18:00 1:00
a TGAS:85°F, QGAS: 2,08 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 52,65BLS, BLS/D: 1263,6 BLS, T/DESP:16117,35
18:00 19:00 1:00
a BLS, TGAS:83°F, QGAS: 2,06 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2BLS, BLS/D:1372,8 BLS, T/DESP:16174,55 BLS. BSW: 0,2%,
19:00 20:00 1:00
a TGAS:82,5°F, QGAS: 2,02 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:16226,55 BLS. BSW: 0,2%,
20:00 21:00 1:00
a TGAS:82°F, QGAS: 2,0 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2 BLS, BLS/D:1372,8 BLS, T/DESP:16283,75 BLS. BSW:
21:00 22:00 1:00
a 0,2%, TGAS:81°F, QGAS: 2,04 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:51,35 BLS, BLS/D:1232,4 BLS, T/DESP:16335,1 BLS. BSW: 0,2%,
22:00 23:00 1:00
a TGAS:81°F, QGAS: 2,0 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:53,3BLS, BLS/D:1279,2BLS, T/DESP:16388,4 BLS. BSW: 0,2%,
23:00 23:59 0:59
a TGAS:80°F, QGAS: 1,98 MMSCFD.
TOTAL D./24 HRS 1265.6 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 16388.4 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 151,45 BLS. #02 VIAJES DE VACUUM CON 150,8 BLS. #03 VIAJE DE VACUUM CON 152,1BLS. #04 VIAJES DE VACUUM CON 154,7 BLS.
VIAJES DE VACUUM 7.00 #05 VIAJE DE VACUUM CON 156 BLS. #06 VIAJE DE VACUUM CON 150,8 BLS. #07 VIAJE DE VACUUM CON 156 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


12/31/2022 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TÉCNICO II: PEDRO MATA; TEC I: LEONARDO GARCÍA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: LEANDRO GARCÍA, TÉCNICO II: RAMÓN RODRÍGUEZ, TEC I: LUÍS MARCANO, SIHO-A: CLARIVEL ORTIZ.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:16440,4 BLS, BSW:0,1%, TGAS:80°F,
0:00 1:00 1:00
a QGAS: 2,0 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:51,35 BLS, BLS/D:1232,4 BLS, T/DESP:16491,75 BLS, BSW:0,1%, TGAS:80°F,
1:00 2:00 1:00
a QGAS: 2,08MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52,65 BLS, BLS/D:1263,6 BLS, T/DESP: 16544,4BLS, BSW:0,2%, TGAS:80°F,
2:00 3:00 1:00
a QGAS: 2,05 MMSCFD.SE
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 53,3 BLS, BLS/D:1279,2 BLS, T/DESP:16597,7BLS, BSW: 0,2%, TGAS:80°F,
3:00 4:00 1:00
a QGAS: 2,07 MMSCFD..SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 151,45 BLS, Y 153,4BLS RESPECTIVAMENTE, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:53,3 BLS, BLS/D:1279,2 BLS, T/DESP:16651,0 BLS, BSW:0,2%, TGAS: 80°F,
4:00 5:00 1:00
a QGAS: 1,98 MMSCFD. .SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 152,75 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2 BLS, BLS/D:1372,8 BLS, T/DESP:16708,2 BLS.BSW:0,2%, TGAS:80°F,
5:00 6:00 1:00
a QGAS: 2,0 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:53,95 BLS, BLS/D: 1294,8BLS, T/DESP: 16762,15BLS.BSW:
6:00 7:00 1:00
a 0,2%, TGAS:80°F, QGAS: 1,98 MMSCFD SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 154,7 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,80BLS, BLS/D: 1435,20 BLS, T/DESP:16821,95 BLS.BSW: 0,2%,
7:00 8:00 1:00
a TGAS:80°F, QGAS: 2,05 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,60 BLS, BLS/D: 1310,40 BLS, T/DESP:16876,55 BLS.BSW: 0,2%,
8:00 9:00 1:00
a TGAS:84°F, QGAS: 2,06MMSCFD.UN (1) VIAJES DE VACUUM CON 150,15 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D:1185,60 BLS, T/DESP:16925,95 BLS.BSW: 0,2%,
9:00 10:00 1:00
a TGAS:85°F, QGAS: 2,08 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP: 16977,95 BLS.BSW: 0,2%, TGAS:86,5°F,
10:00 11:00 1:00
a QGAS: 2,07 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,8 BLS, BLS/D:1435,2 BLS, T/DESP:17037,75 BLS. BSW: 0,2%,
11:00 12:00 1:00
a TGAS:88,6°F, QGAS: 2,11 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 150,8 BLS CADA UNO, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP: 17089,75 BLS.BSW: 0,2%, TGAS:92°F,
12:00 13:00 1:00
a QGAS: 2,09MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP: 17141,75 BLS.BSW: 0,2%, TGAS:92°F,
13:00 14:00 1:00
a QGAS: 2,13MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP: 17193,75 BLS.BSW: 0,2%, TGAS:86°F,
14:00 15:00 1:00
a QGAS: 2,15MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:59,8 BLS, BLS/D:1435,2 BLS, T/DESP:17253,55 BLS.BSW: 0,2%, TGAS:86°F,
15:00 16:00 1:00
a QGAS:2,15 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6 BLS, BLS/D:1310,4 BLS, T/DESP:17308,15 BLS.BSW: 0,2%, TGAS:83°F,
16:00 17:00 1:00
a QGAS: 2,06 MMSCFD.SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:55,9 BLS, BLS/D:1341,6 BLS, T/DESP:17364,05 BLS. BSW: 0,2%, TGAS:83°F,
17:00 18:00 1:00
a QGAS: 2,11 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 153,4 BLS, CON DESTINO A LA EST. LA CEIBA.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 50,7BLS, BLS/D: 1216,8 BLS, T/DESP:17414,75 BLS,
18:00 19:00 1:00
a TGAS:82°F, QGAS: 2,04 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248 BLS, T/DESP:17414,75 BLS. BSW: 0,2%, TGAS:82°F,
19:00 20:00 1:00
a QGAS: 2,02 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:50,05 BLS, BLS/D:1201,2 BLS, T/DESP:17516,8 BLS. BSW: 0,2%, TGAS:81°F,
20:00 21:00 1:00
a QGAS: 2,07 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52,65 BLS, BLS/D:1263,6 BLS, T/DESP:17569,45 BLS. BSW: 0,2%,
21:00 22:00 1:00
a TGAS:81,5°F, QGAS: 2,09 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:51,35 BLS, BLS/D:1232,4 BLS, T/DESP:17620,8 BLS. BSW: 0,2%, TGAS:80°F,
22:00 23:00 1:00
a QGAS: 2,07 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6BLS, BLS/D:1310,4BLS, T/DESP:17675,4 BLS. BSW: 0,2%, TGAS:80°F,
23:00 23:59 0:59
a QGAS: 2,08 MMSCFD.
TOTAL D./24 HRS 1287.0 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 17675.4 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 151,45 BLS. #02 VIAJES DE VACUUM CON 153,4 BLS. #03 VIAJE DE VACUUM CON 152,75BLS. #04 VIAJES DE VACUUM CON 154,7 BLS.
VIAJES DE VACUUM 9.00 #05 VIAJE DE VACUUM CON 150,15 BLS. #06 VIAJE DE VACUUM CON 150,8 BLS. #07 VIAJE DE VACUUM CON 150,8 BLS. #08 VIAJE DE VACUUM CON 150,8 BLS. #09 VIAJE DE VACUUM CO

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


1/1/2023 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TÉCNICO II: PEDRO MATA; TEC I: LEONARDO GARCÍA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: LEANDRO GARCÍA, TÉCNICO II: RAMÓN RODRÍGUEZ, TEC I: LUÍS MARCANO, SIHO-A: CLARIVEL ORTIZ.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6 BLS, BLS/D:1310,4 BLS, T/DESP:17730 BLS, BSW:0,1%, TGAS:80°F,
0:00 1:00 1:00
a QGAS: 2,02 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:17782 BLS, BSW:0,1%, TGAS:80°F, QGAS:
1:00 2:00 1:00
a 2,07 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP: 17834 BLS, BSW:0,2%, TGAS:79°F, QGAS:
2:00 3:00 1:00
a 2,09 MMSCFD.SE
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP:17886 BLS, BSW: 0,2%, TGAS:79°F,
3:00 4:00 1:00
a QGAS: 2,14 MMSCFD..SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 151,45 BLS, Y 150,8 BLS RESPECTIVAMENTE, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:61,1 BLS, BLS/D:1466,4 BLS, T/DESP:17947,1 BLS, BSW:0,2%, TGAS: 78°F,
4:00 5:00 1:00
a QGAS: 2,0 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4 BLS, BLS/D:1185,6 BLS, T/DESP:17996,5 BLS.BSW:0,2%, TGAS:77°F,
5:00 6:00 1:00
a QGAS: 2,05 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:49,4 BLS, BLS/D: 1185,6 BLS, T/DESP: 18045,9 BLS.BSW: 0,2%,
6:00 7:00 1:00
a TGAS:78°F, QGAS: 2,03 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,80BLS, BLS/D: 1435,20 BLS, T/DESP:18105,70 BLS.BSW: 0,2%,
7:00 8:00 1:00
a TGAS:79°F, QGAS: 2,07 MMSCFD. SE REALIZAN DOS (2) VIAJES DE VACUUM CON 158,6 BLS Y 159,9 BLS RESPECTIVAMENTE, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,8 BLS, BLS/D: 1123,20 BLS, T/DESP:18152,50 BLS.BSW: 0,2%,
8:00 9:00 1:00
a TGAS:84°F, QGAS: 2,06MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:59,80 BLS, BLS/D:1435,2 BLS, T/DESP:18212,30 BLS.BSW: 0,2%, TGAS:86°F,
9:00 10:00 1:00
a QGAS: 2,06 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 44,20 BLS, BLS/D: 1060,80 BLS, T/DESP: 18256,50 BLS.BSW: 0,2%,
10:00 11:00 1:00
a TGAS:88°F, QGAS: 2,08 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,2 BLS, BLS/D:1372,80 BLS, T/DESP:18313,70 BLS. BSW: 0,2%,
11:00 12:00 1:00
a TGAS:90°F, QGAS: 2,12 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP: 18365,70 BLS.BSW: 0,2%, TGAS:92°F,
12:00 13:00 1:00
a QGAS: 2,09MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 146,9 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP: 18417,70 BLS.BSW: 0,2%, TGAS:92°F,
13:00 14:00 1:00
a QGAS: 2,11MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 159,90 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 50,70 BLS, BLS/D:1216,80 BLS, T/DESP: 18468,40 BLS.BSW: 0,2%,
14:00 15:00 1:00
a TGAS:91,5°F, QGAS: 2,09MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80 BLS, BLS/D:1123,20 BLS, T/DESP:18515,20 BLS.BSW: 0,2%,
15:00 16:00 1:00
a TGAS:89°F, QGAS:2,03 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 152,1 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:18567,2 BLS.BSW: 0,2%, TGAS:86°F,
16:00 17:00 1:00
a QGAS: 2,06 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 153,4 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6 BLS, BLS/D:1310,4 BLS, T/DESP:18621,8 BLS. BSW: 0,2%, TGAS:86°F,
17:00 18:00 1:00
a QGAS: 2,06 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 59,8 BLS, BLS/D: 1435,2 BLS, T/DESP:18681,6 BLS,
18:00 19:00 1:00
a TGAS:85°F, QGAS: 2,04 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4 BLS, BLS/D:1185,6 BLS, T/DESP:18721 BLS. BSW: 0,2%, TGAS:84°F,
19:00 20:00 1:00
a QGAS: 2,02 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:55,25 BLS, BLS/D:1326 BLS, T/DESP:18786,25 BLS. BSW: 0,2%, TGAS:84°F,
20:00 21:00 1:00
a QGAS: 2,06 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:18838,25 BLS. BSW: 0,2%, TGAS:83 °F,
21:00 22:00 1:00
a QGAS: 2,11 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:18890,25 BLS. BSW: 0,2%, TGAS:82,5°F,
22:00 23:00 1:00
a QGAS: 2,0 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,6 BLS, BLS/D:1310,4BLS, T/DESP:18944,85 BLS. BSW: 0,2%, TGAS:80°F,
23:00 23:59 0:59
a QGAS: 2,08 MMSCFD.
TOTAL D./24 HRS 1269.5 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 18944.9 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 151,45 BLS. #02 VIAJES DE VACUUM CON 150,80 BLS. #03 VIAJE DE VACUUM CON 158,60BLS. #04 VIAJES DE VACUUM CON 159,9 BLS.
VIAJES DE VACUUM 8.00 #05 VIAJE DE VACUUM CON 146,9 BLS. #06 VIAJE DE VACUUM CON 159,90 BLS. #07 VIAJE DE VACUUM CON 152,10 BLS. #08 VIAJE DE VACUUM CON 153,4 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


1/2/2023 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TÉCNICO II: PEDRO MATA; TEC I: LEONARDO GARCÍA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,8 BLS, BLS/D:1123,2 BLS, T/DESP:18991,65 BLS, BSW:0,2%, TGAS:80°F,
0:00 1:00 1:00
a QGAS: 2,07 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:59,8 BLS, BLS/D:1435,2 BLS, T/DESP:19051,45 BLS, BSW:0,2%, TGAS:80°F,
1:00 2:00 1:00
a QGAS: 2,09 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP: 19103,45 BLS, BSW:0,2%, TGAS:79°F,
2:00 3:00 1:00
a QGAS: 2,0 MMSCFD.SE
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 49,4 BLS, BLS/D:1185,6 BLS, T/DESP:19152,85 BLS, BSW: 0,2%, TGAS:79°F,
3:00 4:00 1:00
a QGAS: 1,96 MMSCFD..SE REALIZA TRASEGADO DE CRUDO, DOS (2) VIAJES DE VACUUM CON 157,95 BLS, Y 159,9 BLS RESPECTIVAMENTE, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,20 BLS, BLS/D:1372,8 BLS, T/DESP:19210,05 BLS, BSW:0,2%, TGAS: 78°F,
4:00 5:00 1:00
a QGAS: 2,12 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:51,35 BLS, BLS/D:1232,4 BLS, T/DESP:19261,40 BLS.BSW:0,2%, TGAS:78°F,
5:00 6:00 1:00
a QGAS: 2,07 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:50,70 BLS, BLS/D: 1216,8 BLS, T/DESP: 19312,10 BLS.BSW:
6:00 7:00 1:00
a 0,2%, TGAS:78°F, QGAS: 2,0 MMSCFD. SE REALIZAN DOS (2) VIAJES DE VACUUM CON 157,3 BLS Y 150,8 BLS RESPECTIVAMENTE, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 53,95 BLS, BLS/D: 1294,8 BLS, T/DESP:19366,05 BLS.BSW: 0,2%,
7:00 8:00 1:00
a TGAS:79°F, QGAS: 2,07 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,15 BLS, BLS/D: 1419,6 BLS, T/DESP:19425,20 BLS.BSW: 0,2%,
8:00 9:00 1:00
a TGAS:78°F, QGAS: 2,0 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:45,5 BLS, BLS/D:1092 BLS, T/DESP:19470,7 BLS.BSW: 0,2%, TGAS:78°F,
9:00 10:00 1:00
a QGAS: 1,93 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,85 BLS, BLS/D: 1388,4 BLS, T/DESP: 19528,55 BLS.BSW: 0,2%,
10:00 11:00 1:00
a TGAS:78°F, QGAS: 1,96 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 49,4BLS, BLS/D:1185,60 BLS, T/DESP:19577,95 BLS. BSW: 0,2%, TGAS:78°F,
11:00 12:00 1:00
a QGAS: 2,00 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,6BLS, BLS/D:1310,4BLS, T/DESP: 19632,55 BLS.BSW: 0,2%, TGAS:80°F,
12:00 13:00 1:00
a QGAS: 1,98MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 158,6 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,20 BLS, BLS/D:1372,8 BLS, T/DESP: 19689,75 BLS.BSW: 0,2%,
13:00 14:00 1:00
a TGAS:80°F, QGAS: 1,93MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/Desp.:19741,75 BLS.BSW: 0,2%, TGAS:80°F,
14:00 15:00 1:00
a QGAS: 2,00MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52BLS, BLS/D:1248BLS, T/DESP:19793,75 BLS.BSW: 0,2%, TGAS:80°F,
15:00 16:00 1:00
a QGAS:1,98 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:19845,75 BLS.BSW: 0,2%, TGAS:80°F,
16:00 17:00 1:00
a QGAS: 2,00 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:53,3 BLS, BLS/D:1279,2 BLS, T/DESP:19899,05 BLS. BSW: 0,2%, TGAS:86°F,
17:00 18:00 1:00
a QGAS: 2,06 MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248BLS, T/DESP:19951,05 BLS, TGAS:79°F,
18:00 19:00 1:00
a QGAS: 2,03 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 159,9 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:20003,05 BLS. BSW: 0,2%, TGAS:78°F,
19:00 20:00 1:00
a QGAS: 1,99 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D:1185,60 BLS, T/DESP:20052,45 BLS. BSW: 0,2%,
20:00 21:00 1:00
a TGAS:78°F, QGAS: 1,99 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:20104,45 BLS. BSW: 0,2%, TGAS:79 °F,
21:00 22:00 1:00
a QGAS: 1,98 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:20156,45 BLS. BSW: 0,8%, TGAS:78°F,
22:00 23:00 1:00
a QGAS: 1,98 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:20208,45 BLS. BSW: 0,2%, TGAS:78°F,
23:00 23:59 0:59
a QGAS: 1,93 MMSCFD.
TOTAL D./24 HRS 1263.6 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 20208.45 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFINOSO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 157,95 BLS. #02 VIAJES DE VACUUM CON 159,90 BLS. #03 VIAJE DE VACUUM CON 157,30BLS. #04 VIAJES DE VACUUM CON 150,8 BLS.
VIAJES DE VACUUM 9.00 #05 VIAJE DE VACUUM CON 156 BLS. #06 VIAJE DE VACUUM CON 150,80 BLS. #07 VIAJE DE VACUUM CON 158,60 BLS. #08 VIAJE DE VACUUM CON 150,8 BLS.
#09 VIAJE DE VACUUM CON 159,9 BLS.
HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


1/3/2023 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TÉCNICO II: PEDRO MATA; TEC I: LEONARDO GARCÍA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4 BLS, BLS/D:1185,6BLS, T/DESP:20257,85 BLS. BSW: 0,6%, TGAS:78°F, QGAS: 1,93
0:00 1:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D:1185,60 BLS, T/DESP: 20307,25 BLS, BSW:0%, TGAS:78°F, QGAS: 1,93
1:00 2:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D:1185,60 BLS, T/DESP: 20356,65 BLS, BSW:0%, TGAS:77°F, QGAS: 1,93
2:00 3:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 153,4 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D:1185,60 BLS, T/DESP: 20406,05 BLS, BSW:0%, TGAS:78°F, QGAS: 1,93
3:00 4:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D:1185,60 BLS, T/DESP:20455,45 BLS, BSW:0,2%, TGAS: 77°F, QGAS: 1,93
4:00 5:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D:1185,60 BLS, T/DESP:20504,85 BLS, BSW:0,2%, TGAS: 78°F, QGAS: 1,93
5:00 6:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:52 BLS, BLS/D: 1248 BLS, T/DESP: 20556,85 BLS.BSW: 0,2%, TGAS:77°F,
6:00 7:00 1:00
a QGAS: 1,89 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,6 BLS, BLS/D: 1310,4 BLS, T/DESP:20611,45 BLS.BSW: 0,2%, TGAS:78°F, QGAS: 1,88
7:00 8:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP:20663,45 BLS.BSW: 0,2%, TGAS:78°F, QGAS: 1.93
8:00 9:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,20 BLS, BLS/D:1372,8 BLS, T/DESP:20720,65 BLS.BSW: 0,2%, TGAS:84°F, QGAS: 1,94
9:00 10:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,60 BLS, BLS/D: 1310,4 BLS, T/DESP: 20775,25 BLS.BSW: 0,2%, TGAS:85°F, QGAS: 2,13
10:00 11:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 49,4BLS, BLS/D:1185,6 BLS, T/DESP:20824,65 BLS. BSW: 0,2%, TGAS:85°F, QGAS: 2,04
11:00 12:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP: 20876,65 BLS.BSW: 0,2%, TGAS:85°F, QGAS: 1,99
12:00 13:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP: 20928,65 BLS.BSW: 0,2%, TGAS:85°F, QGAS: 1,99
13:00 14:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/Desp.:20980,65 BLS.BSW: 0,2%, TGAS:85°F, QGAS:1,94
14:00 15:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80 BLS, BLS/D:1123,2 BLS, T/DESP:21027,45 BLS.BSW: 0,2%, TGAS:85°F, QGAS:1,94
15:00 16:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:21079,45 BLS.BSW: 0,2%, TGAS:85°F, QGAS: 1,97
16:00 17:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:21131,45 BLS. BSW: 0,2%, TGAS:81°F, QGAS: 2,07
17:00 18:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 54,60 BLS, BLS/D: 1310,40 BLS, T/DESP:21186,05 BLS, BSW: 0,2% TGAS:81°F,
18:00 19:00 1:00
a QGAS: 2,07 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2 BLS, BLS/D:1372,80 BLS, T/DESP:21243,25 BLS. BSW: 0,4%, TGAS:80°F, QGAS: 2,02
19:00 20:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:21295,25 BLS. BSW: 0,4%, TGAS:81°F, QGAS: 1,98
20:00 21:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,60 BLS, BLS/D:1310,40 BLS, T/DESP:21349,85 BLS. BSW: 0,4%, TGAS:79 °F, QGAS: 1,98
21:00 22:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 148,20 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,8 BLS, BLS/D:1123,20 BLS, T/DESP:21396,65 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 1,98
22:00 23:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D:1185,60BLS, T/DESP:21446,05 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 1,95
23:00 23:59 0:59
a MMSCFD.
TOTAL D./24 HRS 1237.60 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 21446.05 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFÍNICO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 153,40 BLS. #02 VIAJES DE VACUUM CON 156 BLS. #03 VIAJE DE VACUUM CON 150,80BLS. #04 VIAJES DE VACUUM CON 150,8 BLS.
VIAJES DE VACUUM 9.00 #05 VIAJE DE VACUUM CON 150,80 BLS. #06 VIAJE DE VACUUM CON 150,80 BLS. #07 VIAJE DE VACUUM CON 156 BLS. #08 VIAJE DE VACUUM CON 150,8 BLS.
#09 VIAJE DE VACUUM CON 148,209 BLS.
HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


1/4/2023 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TÉCNICO II: PEDRO MATA; TEC I: LEONARDO GARCÍA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 36,40 BLS, BLS/D:873,6 BLS, T/DESP:21482,45 BLS. BSW: 0,2%, TGAS:77°F, QGAS: 1,93
0:00 1:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,80 BLS, BLS/D: 1435,2 BLS, T/DESP: 21542,25 BLS, BSW:0%, TGAS:78°F, QGAS: 1,98
1:00 2:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP: 21594,25 BLS, BSW:02%, TGAS:77°F, QGAS: 1,93
2:00 3:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,20 BLS, BLS/D:1372,8 BLS, T/DESP: 21651,45 BLS, BSW:02%, TGAS:78°F, QGAS: 1,96
3:00 4:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80 BLS, BLS/D:1123,2 BLS, T/DESP:21698,25 BLS, BSW:0,2%, TGAS: 77°F, QGAS: 1,93
4:00 5:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,20 BLS, BLS/D:1372,8 BLS, T/DESP:21755,45 BLS, BSW:0,2%, TGAS: 77°F, QGAS: 1,93
5:00 6:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D: 1185,6 BLS, T/DESP: 21804,85 BLS.BSW: 0,2%, TGAS:78°F,
6:00 7:00 1:00
a QGAS: 1,93 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248BLS, T/DESP:21856,85 BLS.BSW: 0,2%, TGAS:78°F, QGAS: 1,98
7:00 8:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP:21908,85 BLS.BSW: 0,2%, TGAS:84°F, QGAS: 1.95
8:00 9:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80 BLS, BLS/D:1123,2 BLS, T/DESP:21955,65 BLS.BSW: 0,2%, TGAS:84°F, QGAS: 1,95
9:00 10:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP: 22007,65 BLS.BSW: 0,2%, TGAS:84°F, QGAS: 1,92
10:00 11:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,60 BLS, BLS/D:1310,4 BLS, T/DESP:22062,25 BLS. BSW: 0,2%, TGAS:84°F, QGAS: 1,92
11:00 12:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 153,4 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP: 22114,25 BLS.BSW: 0,2%, TGAS:84°F, QGAS: 1,97
12:00 13:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,80 BLS, BLS/D:1123,2 BLS, T/DESP: 22161,05 BLS.BSW: 0,2%, TGAS:84°F, QGAS: 1,97
13:00 14:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/Desp.:22213,05 BLS.BSW: 0,2%, TGAS:84°F, QGAS:1,95
14:00 15:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80 BLS, BLS/D:1123,2 BLS, T/DESP:22259,85 BLS.BSW: 0,2%, TGAS:84°F, QGAS:1,95
15:00 16:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:22311,85 BLS.BSW: 0,2%, TGAS:84°F, QGAS: 1,99
16:00 17:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:41,6 BLS, BLS/D:998,40 BLS, T/DESP:22353,45 BLS. BSW: 0,2%, TGAS:81°F, QGAS: 1,98
17:00 18:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP:22405,45 BLS, BSW: 0% TGAS:79°F, QGAS:
18:00 19:00 1:00
a 1,98 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,4 BLS, BLS/D:1497,6 BLS, T/DESP:22467,85 BLS. BSW: 0%, TGAS:79°F, QGAS: 1,93
19:00 20:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:44 BLS, BLS/D:1060,80 BLS, T/DESP:22512,05 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 1,93
20:00 21:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2 BLS, BLS/D:1372,80 BLS, T/DESP:22569,25 BLS. BSW: 0,2%, TGAS:79 °F, QGAS: 1,93
21:00 22:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 153,40 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,8 BLS, BLS/D:1123,20 BLS, T/DESP:21396,65 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 1,98
22:00 23:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80 BLS, BLS/D:1123,20BLS, T/DESP:22668,05 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 1,93
23:00 23:59 0:59
a MMSCFD.
TOTAL D./24 HRS 1222.00 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 22668.05 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFÍNICO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 156 BLS. #02 VIAJES DE VACUUM CON 156 BLS. #03 VIAJE DE VACUUM CON 156BLS. #04 VIAJES DE VACUUM CON 150,8 BLS.
VIAJES DE VACUUM 8.00 #05 VIAJE DE VACUUM CON 153,4 BLS. #06 VIAJE DE VACUUM CON 156 BLS. #07 VIAJE DE VACUUM CON 150,8 BLS. #08 VIAJE DE VACUUM CON 153,4 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


1/4/2023 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TÉCNICO II: PEDRO MATA; TEC I: LEONARDO GARCÍA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 49,40 BLS, BLS/D:1185,60 BLS, T/DESP:22727,45 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 1,93
0:00 1:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,6 BLS, BLS/D: 1310,4 BLS, T/DESP: 22772,05 BLS, BSW:0,2%, TGAS:79°F, QGAS: 1,88
1:00 2:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,80 BLS, BLS/D:1123,20 BLS, T/DESP: 22818,85 BLS, BSW:02%, TGAS:78°F, QGAS: 1,93
2:00 3:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,60 BLS, BLS/D:1310,40 BLS, T/DESP: 22873,45 BLS, BSW:02%, TGAS:78°F, QGAS: 1,96
3:00 4:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80 BLS, BLS/D:1123,2 BLS, T/DESP:22920,25 BLS, BSW:0,2%, TGAS: 78°F, QGAS: 1,88
4:00 5:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,60 BLS, BLS/D:1310,40 BLS, T/DESP:22974,85 BLS, BSW:0,2%, TGAS: 78°F, QGAS: 1,88
5:00 6:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:52 BLS, BLS/D: 1248 BLS, T/DESP: 23026,85 BLS.BSW: 0,2%, TGAS:78°F,
6:00 7:00 1:00
a QGAS: 1,88 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248BLS, T/DESP:23078,85 BLS.BSW: 0,2%, TGAS:78°F, QGAS: 1,96
7:00 8:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 153,4 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP:23130,85 BLS.BSW: 0,2%, TGAS:78°F, QGAS: 1.88
8:00 9:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP:23182,85 BLS.BSW: 0,2%, TGAS:85°F, QGAS: 1,94
9:00 10:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,80 BLS, BLS/D: 1123,2 BLS, T/DESP: 23229,65 BLS.BSW: 0,2%, TGAS:85°F, QGAS: 1,94
10:00 11:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,80 BLS, BLS/D:1123,2 BLS, T/DESP:23276,45 BLS. BSW: 0,2%, TGAS:85°F, QGAS: 1,96
11:00 12:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,80 BLS, BLS/D: 1123,2 BLS, T/DESP: 23323,25 BLS.BSW: 0,2%, TGAS:85°F, QGAS: 1,88
12:00 13:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP: 23375,25 BLS.BSW: 0,2%, TGAS:85°F, QGAS: 1,87
13:00 14:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 49,40 BLS, BLS/D:1372,8 BLS, T/Desp.:23424,65 BLS.BSW: 0,2%, TGAS:85°F, QGAS:1,94
14:00 15:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,20 BLS, BLS/D:1372,8 BLS, T/DESP:23481,85 BLS.BSW: 0,2%, TGAS:85°F, QGAS:1,87
15:00 16:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80 BLS, BLS/D: 1123,2 BLS, T/DESP:23528,65 BLS.BSW: 0,2%, TGAS:85°F, QGAS: 1,87
16:00 17:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:44,2 BLS, BLS/D:1060,80 BLS, T/DESP:23572,85 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 1,93
17:00 18:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 44,2 BLS, BLS/D: 1060,80 BLS, T/DESP: 23617,05 BLS, BSW: 0,2% TGAS:78°F,
18:00 19:00 1:00
a QGAS: 1,93 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,4 BLS, BLS/D:1185,60 BLS, T/DESP:23666,45 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 1,88
19:00 20:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,60 BLS, BLS/D:1310,40 BLS, T/DESP:23721,05 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 1,88
20:00 21:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2 BLS, BLS/D:1372,80 BLS, T/DESP:23778,25 BLS. BSW: 0,2%, TGAS:79 °F, QGAS: 1,88
21:00 22:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,8 BLS, BLS/D:1123,20 BLS, T/DESP:23825,05 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 1,88
22:00 23:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D:1185,60 BLS, T/DESP:23874,45 BLS. BSW: 0,2%, TGAS:77°F, QGAS: 1,89
23:00 23:59 0:59
a MMSCFD.
TOTAL D./24 HRS 1206.40 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 23874.45 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFÍNICO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 156 BLS. #02 VIAJES DE VACUUM CON 156 BLS. #03 VIAJE DE VACUUM CON 156BLS. #04 VIAJES DE VACUUM CON 153,40 BLS.
VIAJES DE VACUUM 8.00 #05 VIAJE DE VACUUM CON 156 BLS. #06 VIAJE DE VACUUM CON 156 BLS. #07 VIAJE DE VACUUM CON 156 BLS. #08 VIAJE DE VACUUM CON 150,80 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


1/6/2023 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: CARLOS ALVAREZ; TÉCNICO II: PEDRO MATA; TEC I: LEONARDO GARCÍA; SIHO-A: JADEL RODRIGUEZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,80 BLS, BLS/D:1123,20 BLS, T/DESP:23921,25 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 1,88
0:00 1:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 49,40 BLS, BLS/D: 1185,60 BLS, T/DESP: 23970,65 BLS, BSW:0,2%, TGAS:78°F, QGAS: 1,88
1:00 2:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,20 BLS, BLS/D:1372,80 BLS, T/DESP: 24027,85 BLS, BSW:02%, TGAS:78°F, QGAS: 1,88
2:00 3:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:49,40 BLS, BLS/D:1185,60 BLS, T/DESP: 24077,25 BLS, BSW:02%, TGAS:76°F, QGAS: 1,89
3:00 4:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80 BLS, BLS/D:1123,2 BLS, T/DESP:24124,05 BLS, BSW:0,2%, TGAS: 75°F, QGAS: 1,95
4:00 5:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,20 BLS, BLS/D:1372,80 BLS, T/DESP:24181,25 BLS, BSW:0,2%, TGAS: 78°F, QGAS: 1,88
5:00 6:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H:46,8 BLS, BLS/D: 1123,20 BLS, T/DESP: 24228,05 BLS.BSW: 0,2%, TGAS:77°F,
6:00 7:00 1:00
a QGAS: 1,89 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 153,4 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 49,40 BLS, BLS/D: 1185,6BLS, T/DESP:24277,45 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 1,99
7:00 8:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP:24329,45 BLS.BSW: 0,2%, TGAS:82°F, QGAS: 1.83
8:00 9:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP:24381,45 BLS.BSW: 0,2%, TGAS:82°F, QGAS: 1,85
9:00 10:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,80 BLS, BLS/D: 1123,2 BLS, T/DESP: 24428,25 BLS.BSW: 0,2%, TGAS:83°F, QGAS: 1,88
10:00 11:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,20 BLS, BLS/D:1372,8 BLS, T/DESP:24485,45 BLS. BSW: 0,2%, TGAS:84°F, QGAS: 1,88
11:00 12:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 153,4 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,80 BLS, BLS/D: 1123,2 BLS, T/DESP: 24532,25 BLS.BSW: 0,2%, TGAS:84°F, QGAS: 1,90
12:00 13:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP: 24584,25 BLS.BSW: 0,2%, TGAS:88°F, QGAS: 1,89
13:00 14:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,80 BLS, BLS/D:1123,2 BLS, T/Desp.:24631,05 BLS.BSW: 0,2%, TGAS:90°F, QGAS:1,91
14:00 15:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP:24683,05 BLS.BSW: 0,2%, TGAS:87°F, QGAS:1,79
15:00 16:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:46,80 BLS, BLS/D: 1123,2 BLS, T/DESP:24729,85 BLS.BSW: 0,2%, TGAS:82°F, QGAS: 1,93
16:00 17:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:44,2 BLS, BLS/D:1060,80 BLS, T/DESP:24774,05 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 1,88
17:00 18:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 54,60 BLS, BLS/D: 1310,40 BLS, T/DESP: 24828,65 BLS, BSW: 0,2%
18:00 19:00 1:00
a TGAS:78°F, QGAS: 1,88 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,80 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,60 BLS, BLS/D:1310,40 BLS, T/DESP:24883,25 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 1,93
19:00 20:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP:24935,25 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 1,88
20:00 21:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,2 BLS, BLS/D:1372,80 BLS, T/DESP:24992,45 BLS. BSW: 0,2%, TGAS:80 °F, QGAS: 1,67
21:00 22:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 153,40 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 49,4 BLS, BLS/D:1185,60 BLS, T/DESP:25041,85 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 1,88
22:00 23:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP:25093,85 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 1,93
23:00 23:59 0:59
a MMSCFD.
TOTAL D./24 HRS 1219.40 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 25093.85 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFÍNICO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 150,8 BLS. #02 VIAJES DE VACUUM CON 150,8 BLS. #03 VIAJE DE VACUUM CON 153,40BLS. #04 VIAJES DE VACUUM CON 150,80 BLS.
VIAJES DE VACUUM 8.00 #05 VIAJE DE VACUUM CON 153,40 BLS. #06 VIAJE DE VACUUM CON 150,80 BLS. #07 VIAJE DE VACUUM CON 150,80 BLS. #08 VIAJE DE VACUUM CON 153,40 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


1/7/2023 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: LEANDRO GARCIA; TÉCNICO II: RAMON RODRIGUEZ; TEC I: LUIS MARCANO; SIHO-A: CLARIBEL ORTIZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP:25145,85 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 1,88
0:00 1:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP: 25197,85 BLS, BSW:0,2%, TGAS:78°F, QGAS: 1,93
1:00 2:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 49,4 BLS, BLS/D: 1185,60 BLS, T/DESP: 25247,25 BLS, BSW:02%, TGAS:79°F, QGAS: 1,88
2:00 3:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,2 BLS, BLS/D:1372,80 BLS, T/DESP: 25304,45 BLS, BSW:02%, TGAS:79°F, QGAS: 1,88
3:00 4:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 50,05 BLS, BLS/D:1201,20 BLS, T/DESP:25354,50 BLS, BSW:0,2%, TGAS: 78°F, QGAS: 1,88
4:00 5:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,60 BLS, BLS/D:1310,40 BLS, T/DESP:25409,10 BLS, BSW:0,2%, TGAS: 78°F, QGAS: 1,88
5:00 6:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 54,60 BLS, BLS/D: 1310,40 BLS, T/DESP: 25463,70 BLS.BSW: 0,2%,
6:00 7:00 1:00
a TGAS:78°F, QGAS: 1,88 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156,65 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 53,3 BLS, BLS/D: 1279,2BLS, T/DESP:25517 BLS.BSW: 0,2%, TGAS:78°F, QGAS: 1,88
7:00 8:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 53,3 BLS, BLS/D: 1279,2 BLS, T/DESP:25570,3 BLS.BSW: 0,2%, TGAS:79°F, QGAS: 1.81
8:00 9:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 151,45 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 50,05 BLS, BLS/D:1201,2 BLS, T/DESP:25620,35 BLS.BSW: 0,2%, TGAS:79°F, QGAS: 1,81
9:00 10:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 50,05 BLS, BLS/D: 1201,2 BLS, T/DESP: 25670,4 BLS.BSW: 0,2%, TGAS:79°F, QGAS: 1,83
10:00 11:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 48,75 BLS, BLS/D:1170 BLS, T/DESP:25719,15 BLS. BSW: 0,2%, TGAS:80°F, QGAS: 1,86
11:00 12:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,8 BLS, BLS/D: 1435,2 BLS, T/DESP: 25778,95 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 1,88
12:00 13:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 153,4 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 65 BLS, BLS/D:1560 BLS, T/DESP: 25843,95 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 2,20
13:00 14:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,2 BLS, BLS/D:1372,8 BLS, T/Desp:25901,15 BLS.BSW: 0,2%, TGAS:80°F, QGAS:2,22
14:00 15:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,2 BLS, BLS/D:1372,8 BLS, T/DESP:25958,35 BLS.BSW: 0,2%, TGAS:80°F, QGAS:2,30
15:00 16:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,4 BLS, BLS/D: 1497,6 BLS, T/DESP:26020,75 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 2,28
16:00 17:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:59,80 BLS, BLS/D:1435,2 BLS, T/DESP:26080,55 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 2,33
17:00 18:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP: 26132,55 BLS, BSW: 0,2% TGAS:76°F,
18:00 19:00 1:00
a QGAS: 2,35 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:54,60 BLS, BLS/D:1310,40 BLS, T/DESP:24883,25 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 1,93
19:00 20:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 65 BLS, BLS/D:1560 BLS, T/DESP:26254,75 BLS. BSW: 0,2%, TGAS:74°F, QGAS: 2,31
20:00 21:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 153,4 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,40 BLS, BLS/D:1497,6 BLS, T/DESP:26317,15 BLS. BSW: 0,2%, TGAS:74 °F, QGAS: 2,34
21:00 22:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 65 BLS, BLS/D:1560 BLS, T/DESP:26382,15 BLS. BSW: 0,2%, TGAS:74°F, QGAS: 2,36
22:00 23:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 72,80 BLS, BLS/D:1747,2 BLS, T/DESP:26454,95 BLS. BSW: 0,2%, TGAS:74°F, QGAS: 2,36
23:00 23:59 0:59
a MMSCFD.
TOTAL D./24 HRS 1361.10 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 26454.95 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFÍNICO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 156 BLS. #02 VIAJES DE VACUUM CON 156 BLS. #03 VIAJE DE VACUUM CON 156,65 BLS. #04 VIAJES DE VACUUM CON 156,65 BLS.
VIAJES DE VACUUM 8.00 #05 VIAJE DE VACUUM CON 153,40 BLS. #06 VIAJE DE VACUUM CON 150,80 BLS. #07 VIAJE DE VACUUM CON 156 BLS. #08 VIAJE DE VACUUM CON 153,40 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


1/8/2023 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: LEANDRO GARCIA; TÉCNICO II: RAMON RODRIGUEZ; TEC I: LUIS MARCANO; SIHO-A: CLARIBEL ORTIZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 72,80 BLS, BLS/D:1747,2 BLS, T/DESP:26527,75 BLS. BSW: 0,2%, TGAS:73°F, QGAS: 2,12
0:00 1:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 67,60 BLS, BLS/D: 1622,4 BLS, T/DESP: 26595,35 BLS, BSW:0,2%, TGAS:73°F, QGAS: 2,14
1:00 2:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP: 26647,35 BLS, BSW:04%, TGAS:77°F, QGAS: 2,18
2:00 3:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP: 26699,35 BLS, BSW:02%, TGAS:77°F, QGAS: 2,16
3:00 4:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,40 BLS, BLS/D:1497,6 BLS, T/DESP:26761,75 BLS, BSW:0,2%, TGAS: 77°F, QGAS: 2,2
4:00 5:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,20 BLS, BLS/D:1372,8 BLS, T/DESP:26818,95 BLS, BSW:0,2%, TGAS: 78°F, QGAS: 2,2
5:00 6:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 57,20 BLS, BLS/D: 1372,8 BLS, T/DESP: 26876,15 BLS.BSW: 0,2%, TGAS:78°F,
6:00 7:00 1:00
a QGAS: 2,2 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,8 BLS, BLS/D: 1123,2BLS, T/DESP:26922,95 BLS.BSW: 0,2%, TGAS:78°F, QGAS: 2,2
7:00 8:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 72,8 BLS, BLS/D: 1747,2 BLS, T/DESP:26995,75 BLS.BSW: 0,2%, TGAS:78°F, QGAS: 2,2
8:00 9:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 63,7 BLS, BLS/D:1528,8 BLS, T/DESP:27059,45 BLS.BSW: 0,2%, TGAS:78°F, QGAS: 2,05
9:00 10:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 67,6 BLS, BLS/D: 1622,4 BLS, T/DESP: 27127,05 BLS.BSW: 0,2%, TGAS:79°F, QGAS: 2,07
10:00 11:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,85 BLS, BLS/D:1388,4 BLS, T/DESP:27184,9 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 2,09
11:00 12:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,15 BLS, BLS/D: 1419,6 BLS, T/DESP: 27244,05 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 2,11
12:00 13:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 58,5 BLS, BLS/D:1404 BLS, T/DESP:27302,55 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 2,07
13:00 14:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D:1497,6 BLS, T/Desp:27364,95 BLS.BSW: 0,2%, TGAS:80°F, QGAS:2,16
14:00 15:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,6 BLS, BLS/D:1310,4 BLS, T/DESP:27419,55 BLS.BSW: 0,2%, TGAS:80°F, QGAS:2,18
15:00 16:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,4 BLS, BLS/D: 1497,6 BLS, T/DESP:27481,95 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 2,14
16:00 17:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 158,6 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,4 BLS, BLS/D:1497,6 BLS, T/DESP:27544,35 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 2,14
17:00 18:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP: 27596,35 BLS, BSW: 0,2% TGAS:78°F,
18:00 19:00 1:00
a QGAS: 2,16 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:27648,35 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 2,16
19:00 20:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D:1497,6 BLS, T/DESP:27710,75 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 2,16
20:00 21:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:67,6 BLS, BLS/D:1622,4 BLS, T/DESP:27778,35 BLS. BSW: 0,2%, TGAS:77 °F, QGAS: 2,18
21:00 22:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 67,6 BLS, BLS/D:1622,4 BLS, T/DESP:27845,95 BLS. BSW: 0,2%, TGAS:77°F, QGAS: 2,21
22:00 23:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D:1497,6 BLS, T/DESP:27908,35 BLS. BSW: 0,2%, TGAS:77°F, QGAS: 2,21
23:00 23:59 0:59
a MMSCFD.
TOTAL D./24 HRS 1453.40 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 27908.35 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFÍNICO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 156 BLS. #02 VIAJES DE VACUUM CON 156 BLS. #03 VIAJE DE VACUUM CON 156 BLS. #04 VIAJES DE VACUUM CON 156 BLS.
VIAJES DE VACUUM 9.00 #05 VIAJE DE VACUUM CON 156 BLS. #06 VIAJE DE VACUUM CON 156 BLS. #07 VIAJE DE VACUUM CON 150,8 BLS. #08 VIAJE DE VACUUM CON BLS. 158,6 BLS #09 VIAJE DE VACUUM CON 150,8 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


1/9/2023 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: LEANDRO GARCIA; TÉCNICO II: RAMON RODRIGUEZ; TEC I: LUIS MARCANO; SIHO-A: CLARIBEL ORTIZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP:27960,35 BLS. BSW: 0,2%, TGAS:76°F, QGAS: 2,12
0:00 1:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 158,6 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,8 BLS, BLS/D: 1435,2 BLS, T/DESP: 28020,15 BLS, BSW:0,2%, TGAS:77°F, QGAS: 2,12
1:00 2:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP: 28072,15 BLS, BSW:02%, TGAS:77°F, QGAS: 2,16
2:00 3:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,8 BLS, BLS/D:1435,2 BLS, T/DESP: 28131,95 BLS, BSW:02%, TGAS:77°F, QGAS: 2,14
3:00 4:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,40 BLS, BLS/D:1497,6 BLS, T/DESP:28194,35 BLS, BSW:0,2%, TGAS: 78°F, QGAS: 2,14
4:00 5:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:59,8 BLS, BLS/D:1435,2 BLS, T/DESP:28254,15 BLS, BSW:0,2%, TGAS: 78°F, QGAS: 2,16
5:00 6:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 57,20 BLS, BLS/D: 1372,8 BLS, T/DESP: 28311,35 BLS.BSW: 0,2%, TGAS:78°F,
6:00 7:00 1:00
a QGAS: 2,20 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,8 BLS, BLS/D: 1435,2BLS, T/DESP:28371,15 BLS.BSW: 0,2%, TGAS:78°F, QGAS: 2,18
7:00 8:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,6 BLS, BLS/D: 1310,4 BLS, T/DESP:28425,75 BLS.BSW: 0,2%, TGAS:79°F, QGAS: 2,14
8:00 9:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150.8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 53,3 BLS, BLS/D:1279,2 BLS, T/DESP:28479,05 BLS.BSW: 0,2%, TGAS:79°F, QGAS: 2,12
9:00 10:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 63,7 BLS, BLS/D: 1528,8 BLS, T/DESP: 28542,75 BLS.BSW: 0,2%, TGAS:79°F, QGAS: 2,16
10:00 11:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D:1497,6 BLS, T/DESP:28605,15 BLS. BSW: 0,2%, TGAS:80°F, QGAS: 2,09
11:00 12:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 153,4 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,15 BLS, BLS/D: 1419,6 BLS, T/DESP: 28664,3 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 2,11
12:00 13:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,15 BLS, BLS/D:1419,6 BLS, T/DESP:28723,45 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 2,14
13:00 14:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D:1497,6 BLS, T/Desp:28785,85 BLS.BSW: 0,2%, TGAS:80°F, QGAS:2,07
14:00 15:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 152,1 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,6 BLS, BLS/D:1310,4 BLS, T/DESP:28840,45 BLS.BSW: 0,2%, TGAS:80°F, QGAS:2,11
15:00 16:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:61,10 BLS, BLS/D: 1466,4 BLS, T/DESP:28901,55 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 2,09
16:00 17:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 158,6 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:53,3 BLS, BLS/D:1279,2 BLS, T/DESP:28954,85 BLS. BSW: 0,2%, TGAS:80°F, QGAS: 2,09
17:00 18:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 57,2 BLS, BLS/D: 1372,8 BLS, T/DESP: 29012,05 BLS, BSW: 0,2% TGAS:78°F,
18:00 19:00 1:00
a QGAS: 2,11 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 153,4 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,4 BLS, BLS/D:1497,6 BLS, T/DESP:29074,45 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 2,14
19:00 20:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,20 BLS, BLS/D:1372,8 BLS, T/DESP:29131,65 BLS. BSW: 0,2%, TGAS:77°F, QGAS: 2,14
20:00 21:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,4 BLS, BLS/D:1497,6 BLS, T/DESP:29194,05 BLS. BSW: 0,2%, TGAS:77 °F, QGAS: 2,18
21:00 22:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 67,6 BLS, BLS/D:1622,4 BLS, T/DESP:29261,65 BLS. BSW: 0,2%, TGAS:77°F, QGAS: 2,21
22:00 23:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP:29313,65 BLS. BSW: 0,2%, TGAS:77°F, QGAS: 2,21
23:00 23:59 0:59
a MMSCFD.
TOTAL D./24 HRS 1405.30 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 29313.65 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFÍNICO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 158,6 BLS. #02 VIAJES DE VACUUM CON 156 BLS. #03 VIAJE DE VACUUM CON 150,8 BLS. #04 VIAJES DE VACUUM CON 150,8 BLS.
VIAJES DE VACUUM 10.00 #05 VIAJE DE VACUUM CON 150,8 BLS. #06 VIAJE DE VACUUM CON 153,4 BLS. #07 VIAJE DE VACUUM CON 152,1 BLS. #08 VIAJE DE VACUUM CON 158,6 BLS #09 VIAJE DE VACUUM CON 153,4 BLS. #1

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


1/10/2023 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: LEANDRO GARCIA; TÉCNICO II: RAMON RODRIGUEZ; TEC I: LUIS MARCANO; SIHO-A: CLARIBEL ORTIZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,40 BLS, BLS/D:1497,6 BLS, T/DESP:29376,05 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 2,16
0:00 1:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,20 BLS, BLS/D: 1372,8 BLS, T/DESP: 29433,25 BLS, BSW:0,2%, TGAS:79°F, QGAS: 2,20
1:00 2:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D: 1497,6 BLS, T/DESP: 29495,65 BLS, BSW:02%, TGAS:80°F, QGAS: 2,14
2:00 3:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D:1497,6 BLS, T/DESP: 29558,05 BLS, BSW:02%, TGAS:81°F, QGAS: 2,12
3:00 4:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,40 BLS, BLS/D:1497,6 BLS, T/DESP:29620,45 BLS, BSW:0,2%, TGAS: 80°F, QGAS: 2,12
4:00 5:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,20 BLS, BLS/D:1372,8 BLS, T/DESP:29677,65 BLS, BSW:0,2%, TGAS: 82°F, QGAS: 2,16
5:00 6:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 57,20 BLS, BLS/D: 1372,8 BLS, T/DESP: 29734,85 BLS.BSW: 0,2%, TGAS:82°F,
6:00 7:00 1:00
a QGAS: 2,20 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 67,6 BLS, BLS/D: 1622,4BLS, T/DESP:29797,25 BLS.BSW: 0,2%, TGAS:82°F, QGAS: 2,14
7:00 8:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248 BLS, T/DESP:29849,25 BLS.BSW: 0,2%, TGAS:81°F, QGAS: 2,14
8:00 9:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150.8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D:1497,6 BLS, T/DESP:29911,65 BLS.BSW: 0,2%, TGAS:81°F, QGAS: 2,12
9:00 10:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,2 BLS, BLS/D: 1372,8 BLS, T/DESP: 29968,85 BLS.BSW: 0,2%, TGAS:81°F, QGAS: 2,09
10:00 11:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150.8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 65 BLS, BLS/D:1560 BLS, T/DESP:30033,85 BLS. BSW: 0,2%, TGAS:81°F, QGAS: 2,07
11:00 12:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150.8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 46,8 BLS, BLS/D: 1123,2 BLS, T/DESP: 30080,65 BLS.BSW: 0,2%, TGAS:82°F, QGAS: 2,11
12:00 13:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP:30132,65 BLS.BSW: 0,2%, TGAS:82°F, QGAS: 2,14
13:00 14:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 58,5 BLS, BLS/D:1404 BLS, T/Desp:30191,15 BLS.BSW: 0,2%, TGAS:82°F, QGAS:2,09
14:00 15:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 59,15 BLS, BLS/D:1419,6 BLS, T/DESP:30250,30 BLS.BSW: 0,2%, TGAS:82°F, QGAS:2,14
15:00 16:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,40 BLS, BLS/D: 1497,6 BLS, T/DESP:30312,70 BLS.BSW: 0,2%, TGAS:82°F, QGAS: 2,16
16:00 17:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:52 BLS, BLS/D:1248 BLS, T/DESP:30364,70 BLS. BSW: 0,2%, TGAS:80°F, QGAS: 2,16
17:00 18:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 152,75 BLS, CON DESTINO A LA EST. LA CEIBA.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 58,50 BLS, BLS/D: 1404 BLS, T/DESP: 30423,20 BLS, BSW: 0,2% TGAS:79°F,
18:00 19:00 1:00
a QGAS: 2,17 MMSCFD. S
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:57,20 BLS, BLS/D:1372,8 BLS, T/DESP:30480,40 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 2,14
19:00 20:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D:1497,6 BLS, T/DESP:30542,80 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 2,14
20:00 21:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:62,4 BLS, BLS/D:1497,6 BLS, T/DESP: 30605,20 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 2,16
21:00 22:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 67,6 BLS, BLS/D:1622,4 BLS, T/DESP:30672,80 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 2,16
22:00 23:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP:30724,80 BLS. BSW: 0,2%, TGAS:77°F, QGAS: 2,17
23:00 23:59 0:59
a MMSCFD.
TOTAL D./24 HRS 1416.35 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 30730.00 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFÍNICO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 150,8 BLS. #02 VIAJES DE VACUUM CON 156 BLS. #03 VIAJE DE VACUUM CON 150,8 BLS. #04 VIAJES DE VACUUM CON 150,8 BLS.
VIAJES DE VACUUM 9.00 #05 VIAJE DE VACUUM CON 150,8 BLS. #06 VIAJE DE VACUUM CON 150,8 BLS. #07 VIAJE DE VACUUM CON 156 BLS. #08 VIAJE DE VACUUM CON 152,75 BLS
#9 VIAJE DE VACUUM CON 156 BLS.
HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59
Reporte de Servicio

FECHA LOCACION CLIENTE CAMPO TIPO DE SERVICIO


1/11/2023 MF2 PDVSA TACATA WELL TESTING

SUPERVISOR: LEANDRO GARCIA; TÉCNICO II: RAMON RODRIGUEZ; TEC I: LUIS MARCANO; SIHO-A: CLARIBEL ORTIZ.
PERSONAL
SUPERVISOR: JESUS RAMOS; TECNICO II: JESUS CHIRINOS; TEC I: EXON SOLORZANO; SIHO-A: LEIDYS ROMERO.

(1) SEPARADOR 1440PSI, (1) CHOKE-MANIFOLD 3"1/16, (1) VÁLVULA DE SEGURIDAD DE 10K, (1) FLARE STACK 8" EQUIPADO, (2) TANQUES DE 500BLS C/U, COMPRESOR DE AIRES (1)(1) SISTEMA CHUT-DOWN, TUBERÍAS,

EQUIPOS VACUUM (1), GENERADOR ELÉCTRICO 123KVA, (1) TRÁILER TIPO OFICINA, CON ESCRITORIOS Y SILLAS, (1) BAÑO ECOLÓGICO, (1) SISTEMA DE ILUMINACIÓN DE FAROS, (1) LAPTOP, (1) IMPRESORA MULTIFUNCIONAL, (1) TELÉFONO,

(1) VEHÍCULO, (1) TOLDO 4X4, (1) MESA,(6) SILLAS, (2) CONTENEDORES DE DESECHOS, (4) EXTINTORES, (6) CONOS DE SEGURIDAD, (7) AVISOS DE SEGURIDAD, CERCO ELÉCTRICO (1), EQUIPO AUTOCONTENIDO (1).

HORA
, DESDE HASTA HORA
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,40 BLS, BLS/D:1497,6 BLS, T/DESP:30787,20 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 2,16
0:00 1:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 54,6 BLS, BLS/D: 1310,4 BLS, T/DESP: 30841,8 BLS, BSW:0,2%, TGAS:78°F, QGAS: 2,12
1:00 2:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 57,20 BLS, BLS/D: 1372,8 BLS, T/DESP: 30899,00 BLS, BSW:02%, TGAS:78°F, QGAS: 2,14
2:00 3:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D:1497,6 BLS, T/DESP: 30961,40 BLS, BSW:02%, TGAS:78°F, QGAS: 2,18
3:00 4:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 156 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D:1248 BLS, T/DESP:31013,40 BLS, BSW:0,2%, TGAS: 79°F, QGAS: 2,16
4:00 5:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:67,60 BLS, BLS/D:1622,4 BLS, T/DESP:31081,00 BLS, BSW:0,2%, TGAS: 79°F, QGAS: 2,14
5:00 6:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 57,20 BLS, BLS/D: 1372,8 BLS, T/DESP: 31138,20 BLS.BSW: 0,2%, TGAS:80°F,
6:00 7:00 1:00
a QGAS: 2,20 MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 52 BLS, BLS/D: 1248BLS, T/DESP:31190,2 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 2,16
7:00 8:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 62,4 BLS, BLS/D: 1497,6 BLS, T/DESP:31252,6 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 2,20
8:00 9:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 154,7 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 53,3 BLS, BLS/D:1279,2 BLS, T/DESP:31305,9 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 2,14
9:00 10:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150,8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 72,8 BLS, BLS/D: 1747,2 BLS, T/DESP: 31378,7 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 1,70
10:00 11:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 31,2 BLS, BLS/D:748,8 BLS, T/DESP:31409,9 BLS. BSW: 0,2%, TGAS:80°F, QGAS: 1,73
11:00 12:00 1:00
a MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJES DE VACUUM CON 150.8 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 22,1 BLS, BLS/D: 530,4 BLS, T/DESP: 31432 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 1,75
12:00 13:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 35,1 BLS, BLS/D:842,4 BLS, T/DESP:31467,1 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 1,75
13:00 14:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 18,2 BLS, BLS/D:436,8 BLS, T/Desp:31485,3 BLS.BSW: 0,2%, TGAS:80°F, QGAS:1,56
14:00 15:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 26 BLS, BLS/D:624 BLS, T/DESP:31511,3 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 1,59
15:00 16:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:31,2 BLS, BLS/D: 748,8 BLS, T/DESP:31542,5 BLS.BSW: 0,2%, TGAS:80°F, QGAS: 1,49
16:00 17:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:28,6 BLS, BLS/D:686,4 BLS, T/DESP:31571,1 BLS. BSW: 0,2%, TGAS:80°F, QGAS: 1,45
17:00 18:00 1:00
a MMSCFD.
SE REALIZA EL CAMBIO DE GUARDIA DEL PERSONAL, SE REALIZA LA REUNIÓN DE SEGURIDAD Y SE FIRMA PERMISO DE TRABAJO Y ART. PSEP: 60PSI, BLS/H: 31,2 BLS, BLS/D: 748,8 BLS, T/DESP: 31602,3 BLS, BSW: 0,2% TGAS:79°F,
18:00 19:00 1:00
a QGAS: 2,05 MMSCFD. SE REALIZA TRASEGADO DE CRUDO, UN (1) VIAJE DE VACUUM CON 158,6 BLS, CON DESTINO A LA EST. LA CEIBA.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:23,4 BLS, BLS/D:561,6 BLS, T/DESP:31625,7 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 2,12
19:00 20:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 23,4 BLS, BLS/D:561,6 BLS, T/DESP:31649,1 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 2,08
20:00 21:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H:26 BLS, BLS/D:624 BLS, T/DESP: 31675,1 BLS. BSW: 0,2%, TGAS:78°F, QGAS: 2,13
21:00 22:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 36,4 BLS, BLS/D:873,6 BLS, T/DESP:31711,5 BLS. BSW: 0,2%, TGAS:77°F, QGAS: 2,15
22:00 23:00 1:00
a MMSCFD.
POZOS (TAG-18, TAG-15, TAG-14, TAG-12), ALINEADOS AL SWT, CON RETORNO A LOS TANQUES Y QUEMANDO GAS EN SITIO, PSEP: 60PSI, BLS/H: 31,2 BLS, BLS/D:748,8 BLS, T/DESP:31742,7 BLS. BSW: 0,2%, TGAS:79°F, QGAS: 2,30
23:00 23:59 0:59
a MMSCFD.
TOTAL D./24 HRS 1017.90 TOTAL DESPLAZADO 24 HRS.

TOTAL DESPLAZADO 31742.70 TOTAL DESPLAZADO DURANTE LA OPERACIÓN ACTUAL. RETORNANDO: CRUDO PARAFÍNICO
ESTACIÓN LA CEIBA
DESTINO DEL VACUUM

#01 VIAJE DE VACUUM CON 156 BLS. #02 VIAJES DE VACUUM CON 156 BLS. #03 VIAJE DE VACUUM CON 150,8 BLS. #04 VIAJES DE VACUUM CON 154,7 BLS.
VIAJES DE VACUUM 7.00 #05 VIAJE DE VACUUM CON 150,8 BLS. #06 VIAJE DE VACUUM CON 150,8 BLS. #07 VIAJE DE VACUUM CON 158,6 BLS.

HRS/ STAND BY HRS/ OPERATIVAS REPRESENTANTE DE PDVSA REPRESENTANTE DE PETROALIANZA

0:00 23:59