Review of Contractor’s Unit Price Breakdown Analysis

Client: Dire Dawa University


Consultant: Ethiopian Construction Design & Supervision
Contractor: Eshetu Lemma RC
Project: Site Work & Landscape
Project location: Dire Dawa City, DDU Campus

According to Standard Bidding Document (SBD) For Procurement of Works,


version 1, August 2011. Prepared by the Federal Democratic Republic of
Ethiopia, Federal Procurement and Property Administration (FPPA),

Part 1: Bidding Procedures


Section 4. Bidding Forms
C. Financial Offer - Unit Price Contract
2. Detailed Breakdown of Prices
Table B. Breakdown of the basic prices for materials
It is stated; ‘(5) Any losses or breakages to be determined by the Bidder.’
(page 53 of 150)

This means, basic prices for the supply of material are inclusive of wastage
caused by the Bidder/Contractor.
Therefore, the Unit Rate Breakdown Analysis should consider only the exact
quantity of material required for the corresponding item without adding wastage
in percent.

Reviewer: Alexander O.
Review No.: 01
Signature: __________
Date: October 21, 2022