PPP Projects in Bangladesh: An Overview
• Operation stage: 1 17
5 6 Ministry of Posts,… 5
• Construction stage: 5 7 Prime Minister’s… 3
Ministry of Local… 2
• Contract Signed: 8 Ministry of Labor… 2
2012201320142015 2016201720182019
• Contract to be Signed: Others 5
2
• Procurement Stage:
17
• Feasibility Stage: 8
• Others: 32 BDT 1875 BDT 220
Awarded projects and
Billion Billion
the pipeline represent Project
Projects
investment above USD pipeline
Awarded
20 billion
Restricted
PPP Program Overview and Way Forward
Key Changes
▪ 24-hours service
▪ Walk-in Service
▪ Full-fledged facility (no outside consumables required)
▪ Minimum of 19,500 sessions (guaranteed) in two
facilities