Relocate of the Duct Bank from SS 106 / 108

Refer to the original layout of the duct bank.

Detail duct bank as per 3D models ( Width 3.5 m and depth as per duct bank type E-DB08B )
Refer to section drawings the depth of the duct bank from the ground level..

EDB 337016 = 0.6 m

EDB 337017 = 2.2 m

As per 3D models ,

1. The depth of cable trench is 1 m


2. once the duct bank overlapped with the cable trench there will be some spaced
between cable trench and the duct bank.
Re routing of the Duct bank to be reviewed.

Yellow block is propossed.