PROJECT BRIEF
SITE LAYOUT
REINFORCEMENT STACKING
Family Type Area Default Thickness Elevation at Top Elevation at Bottom Volume
Slab 3rd Basement Slab 62023 SF 0' - 6" 0' - 0" -0' - 6" 31011.66 CF
Slab 2nd basement slab 62503 SF 0' - 6" 11' - 6" 11' - 0" 31251.26 CF
Slab 1st basement slab 63356 SF 0' - 6" 23' - 0" 22' - 6" 31678.08 CF
Slab Ground Floor Level 62144 SF 0' - 6" 37' - 6" 37' - 0" 31071.81 CF
Slab Plinth Concrete Slab 32808 SF 0' - 6" 40' - 6" 40' - 0" 16403.81 CF
Slab 1st Floor Concrete Slab 35219 SF 0' - 6" 53' - 5" 52' - 11" 17609.61 CF
Slab 2nd Floor Concrete Slab 23075 SF 0' - 6" 66' - 4" 65' - 10" 11537.51 CF
Slab 3rd Floor Concrete Slab 23075 SF 0' - 6" 79' - 3" 78' - 9" 11537.51 CF
Time (in
Mark Speed seconds) Length
Quality Control Office 3.0 mph 135.8 597' - 5 15/32"
Safety Office 3.0 mph 128.3 564' - 8 1/4"
Existing Toilets 3.0 mph 131.4 577' - 11 5/8"
RMC Lift for C Block Casting Slabs 3.0 mph 86.1 378' - 11 21/32"
Proposed Facilities
Time (in
Mark seconds) Length Time Saved
Proposed QC Lab 81.7 359' - 3 1/4" 54.1
Proposed Safety Office 90.1 396' - 4 11/32" 38.2
Proposed Toilets 107.3 471' - 11 5/32" 24.1
Proposed Path for RMC
Entry 51.5 226' - 7 5/32" 34.6
TOILETS
RMC ENTRY
UPTO GATE-2
QC OFFICE
SAFETY OFFICE