1. OUTPUT RATE, OR
2. PRODUCTIVE TIME, PT
(CAN ALSO BE STATED IN THE QUESTION WHICH RELATES TO
CYCLE TIME, CT)
1. CLEARLY STATED AS PT OR
2. STATED AS “AVAILABLE TIME”/ “ALLOCATED TIME”
3. STATED AS “WORKING HOURS”
4. WORKING HOURS GIVEN, BUT PERCENTAGE OF PRODUCTIVE TIME IS
STATED
OR = 315 units/day
INTRO
TASK
TABLE
500
idleness percentage
if wage rate is given in a daily basis, you HAVE to change it to per hour basis
RM25
day =RM 3.57/hour
7 hours
day
Task
a) Precedence Diagram (in seconds)
Precedence / Sequence
45 65 20
A C F
15
D
35
75
B H
55 50
80 60
I J
E G
Cycle Time, CT = PT / OR
OR = 315 units/day
PT = 25, 200 secs/day
WS 1 2 3 4 5 6 7
TASK(S) A, B C, D E F, G H I J
TASK TIME (TT) 80 80 80 80 75 55 50
IDLE TIME (IT) 0 30
0 0 0 5 25
= CT - TT
= 60 SECS
PART A
QUESTION 1
Adidos Manufacturing Sdn Bhd produces high quality shoes. Manufacturing these shoes
require 10 separate tasks. There are 420 minutes available for manufacturing the shoes in
the plant each day and the weekly demand is 300 shoes. The information for the tasks is as
follows:
TASK TIME
TASK (MINUTES) PREDECESSOR
A 1 -
B 3 A
C 2 B
D 4 B
E 1 C,D
F 3 A
G 2 F
PT = 420 mins/day * H 5 G
5 days/week I 1 E,H
= 2100 mins/week J 3 I
OR = 300 units/week
a) Draw the precedence diagram of the operation.
(4 marks)
b) Assuming a 5 days work a week, calculate the cycle time of the line.
CT = PT/OR = 2100 mins/week (1.5 marks)
300 units/week
= 7 mins/unit
c) Determine the theoretical minimum number of workstations.
# of WS = 725 mins
mins/unit
= 3.57 ~ 4 unit of WS (1.5 marks)
WS 1 2 3 4
TASK(S) A, B, F C, D, E G, H I, J
TASK
7 7 7 4
TIME
= RM 375 /MONTH
PRODUCTIVE TIME, PT Question 3
2. STATED AS “AVAILABLE TIME”/ “ALLOCATED TIME”
OR
Question 4
PRODUCTIVE TIME, PT
3. STATED AS “WORKING HOURS”
OR
CT
PRODUCTIVE TIME, PT Question 5
4. WORKING HOURS GIVEN, BUT PERCENTAGE/AMOUNT OF
CONFIDENTIAL 2 BM/MAY 2012/MGT345/365/375
NON- PRODUCTIVE TIME IS STATED.
NEED TO CALCULATE PT = Working Hours - Non Productive time
PART A
OR
QUESTION 1
d) By using the Longest Task Time Heuristic approach, balance the production line and
draft the layout with a suitable diagram.
(3 marks)
f) If wages per worker cost RM5 per hour, what is the cost of idleness per week?
(2 marks)
THIS IS THE CT
Σ Task Time
= 57 mins
CT = PT OR = PT = 480 MIN
OR
Doesn’t ask us to find CT CT DAY
12 MINS
PT = 8 hours * 60 mins = 480 mins UNIT
day hour day = 40 UNITS
DAY
WS 1 D WS 1
A, B, D 12 MINS
WS5 A 5 MINS
5 B 4 MINS
A, B 9 MINS
A
12 WS2 7 3
WS3
C H J
4 5 2 WS 2
B E F C 12
WS4 G 5
5 11
G I Σ Task Time
= 57 mins
d) Line layout
WS 1 2 3 4 5
TASK(S) A, B, D C E, F, G I H,J
TASK TIME(TT) 12 12 12 11 10
IDLE TIME 0 0 0 1 2
= CT - TT
Σ Idle Time = 3 mins