You are on page 1of 2
_— chen jin jun ~~: SHS0276 Fimeaream oT ata Alves WOW sigg071 RaW aaa Tae [Faurmor eran chengxi xinrong ship-repairing Kane sista net fron No Conte — TC Fa Fajang hehe [a arama ove na LC ingjiang Tart one uaa) Nome ome | Tee | Comma] Sauce [ENON] You | we | SA] Oe wore tog | sng va vwatng | szcner | wen 2ore | sm se | rem | me | nora | rane | toe | rary | motor) haus] ober | stm mu 12/07 | 11:00 - 18:00] 2 5 7 fe 13/07 | 08:00 - 18:00] 8 2 10 se 14/07 | 08:00 - 18:00 2 10 sun 15/07 | 08:00 | 18:00 2 10 tron 16/07 | 08:00 | 19:00 2 1 re 17/07 | 08:00 | 19:00 2 1 wea 18/07 | 08:00 | 19:00 2 4 [Description / Reason for visit [2018/7/12, Travel from shanghat to jingjiang .apply for boarding pass and go on board to check valve system condiion [201/7/13.check valve system find too much problems.cil leakage from everywhere, most of valve can't operate bot manually and remote control as wel as feedback signal also no functon. troubleshooting and find the whole system hav tao much air inside have to ask the crew to assist us de-airing oll pipes for cargo tanks,no access into ballast tanks [suggest the crew to de-airing pipies for batlast tanks by themselves later on. |2018/7/14,troubleshocting all knds of problems for valve cabinetin the bosun store,repalce VPI,bottom paris, TC/PTC. biock accordingly make sure all valves can be operated manually and feedback signal functional, several valves such as| [01 101,01 102,07103.07 104 etc, due to emergency quick connector on deck and stop valves nm cabinet oilleakage | [severely valve can't be functional, 50 suggest the owner to order new connector and stop valves. [2018/7/18.attemp! to fx oll leakage problems in both cabinets, continue to fix all kinds of problems for valve cabinet in tht lbosun store with the assistance of the crew troubleshooting hydrarulic problems for each valve one by one [2018/7 16. troubleshooting all kinds of problems for valve cabinet in the hydraulic room, repalce VPI,bottom parts, TCIPT block and solenoid valves accordingly make sure all valves can be operated manvally and feedback signal functional ok| fx solenoid valves and troubeshooting hydraulic problems for ODME valves OT262,07263 et, [2018/7/17 manually test each valves one by one in valve cabinet continue to wroubleshootng all Kinds of problems for [valve cabinetin the hydraulic room repalce VPI pottom parts, TC/PTC block and solenoid valves accordingly; make Sure fall valves can be operated manually and feedback signal functional ok [201817118 the tme for new par's supplied on board not sure troubleshooting and ty to fix hydaulic problem for OT 108 [OP206,BA0ST etctinally make OT108,SAOST work properly Suggest to repalce control block on actuator for OPZ06, Used pars: Roturned parts Spare paris Pas nel by chaise Part name / Toe “473 way solenoid valves VPLGIVPLE bottom part, PTC ITC bloc Seraceang Haire Joven jin jun 2018/7/20 ee mes SHS0276 Poe area te Aves WO™—Siga071 aa rae Fa Fanart eine chengxi xinrong ship-repairing raha ayer ar forse Na Cuntanor AT z Wralenginchine War away Tart a over wan Sore cae ee ee Cr week tg ‘sa waning | sipmes | ya pore | sa soe | nme | tne | are | nous | ove | cny | Pouers| rows | pobiame| Cusom thy 19/07 | 08:00 - 19:00] 9 2 1 rn 20107 | 08:00 - 18:00] 5 5 10 | [Descrntion / Reason for vist — '201817/19, testing all emote control function for the whole system .and make detailed testing checklist and suggestion jection for each vaive.also troublestooting feedback signal for several valves such as OT1 17,BA002,BA010 ete and adjy [or recalibate valve position indication on computer for all continous valve. |201877720.the ship is going to sailing but new parts still not suppled on board, so discuss with owner and instruct the [crwe how to deal with a few remaining problems about cil leakage replacing quick connectors and de-airing oll pipes for OT101,07102,0T103,07 104 also give kind suggestion for the whole valve operation. lavel back to shanghai this afternnoon, the remaning job replace control block for OP206.de-airing oll pipe valve willbe operated propery 2-replace quick connectors on deck especially for OT101,OT102,0T103,0T 104,07 108,0T115.0T116 /s,open bypass vaives on actuators and then de-airing oil pipes for OT 101 OTO2,0T103,0T 104,071 15 etc at least 10 ming after that closing by pass valves on actuators, valves will be operated properly. ‘Spare parts Used pans tert pats om Returned parts Part name / Type 473 way solenoid valves PIG! VPLE bottom part, PTC/TC block ervce ong NRE chenjin jon 201877/20 Fontenaluesony

You might also like