On-board Acceptance Report —_wacmnmunmsscomane
jnginnl KYAW KYAW KHINE/ADLI |" 1338775 Pv EPMMS S'PORE
Jaron AGL EO ALVES WO —Toraaar [oarWe Ea Oe rpaze
et HYUNDAI HEAY INDUSTRY |"? [4472 aoe et
ease FRANEPETAO. [aera Conerer nar
ie MSP ANCHORAGE, SINGAPORE
NO] pap [__watingtme | Noma | Over | Wave” [Comm] Savin | Eenon cae
4 : toa | senna ‘woe vwatieg | supe | ere
2ore | st [Se | rows | me | nurs | nas | rx | ray | rbioms| "has_| pstms| Com
1 | 2108 | 07:30 - o | 20
Description 7 Reason for visit : Troubleshooting of VRC system
1. Arrive onboard and check with Chief Officer regarding VRC system.
[2. Found out that some of the valves are not able to be operated from CCR.
3. Found out that the percentage of the valves were also out of range.
|4. Replaced bottom part for valves 01101, 01102, 01103, 01104 with ordered spares.
5. Purged the valves inside cargo tank no. 1, then tested the valves
[6. Adjusted the Zero and Span for valves
7. All valves are working except for OT102 due to valve unable to closed from COR.
8. Troubleshoot and found out that close solenoid is fautly and replaced with ship spares.
ly. U1 1U2 Gan be operated trom CUR.
10. Chief Officer informed of 4 more valves unable to operate; 0113, OT114, OT115, OT116,
111, Troubleshoot and found out that half moon for OT113 & OT146 is missing
12, Found out that all 4 valves need to be purgedide-aired and informed ship crew on the procedure.
13. Hand over system back to ship crew and sign off,
Spare parts Used parts Returned parts
Name of pars fom arto Pears eturned oy |Reparabe]
Part name / Type Sera No, ae 3s hare
Spore | emesoa | om bein = Tcumomer| ves] No
foe scare sng: | Cuore’ Yes} Ne
[Seve eneer arate
Ikraw Kyaw KHINE \\
v
A wened