You are on page 1of 42

FINAL

COA PIT LINE PATH WAY

BS IS FS HC RL Remarks

2.09 102.09 100.00 TBM on S&T Box EP/25 Base top


2.49 99.60 Closed on Cat walk slab top
0.89 100.49 99.60

C/S No. 1 @Ch. 0 m


3.42 97.070 3.3 D/L RL
3.42 97.070 4.5 Toe of ballast
3.42 97.070 6 Face wall Inside
3.42 97.070 7.3 Fill top
3.42 97.070 13 Fill Top
1.42 99.070 13 Fill Top
1.42 99.070 15 Toe
1.42 99.070 17 GL

C/S No. 2 @Ch. 20 99.07 20


4.02 98.070 22 D/L RL
5.02 97.070 24 Toe of ballast
5.07 97.023 24.154 Face wall Inside
5.03 97.060 26 Fill top
5.04 97.050 30 Fill Top
91.49 10.600 7 Fill Top
92.54 9.550 8.5 Toe
92.56 9.530 12 GL
C/S No. 3 @Ch. 40 m
92.04 10.050 0.84 D/L RL
92.47 9.620 2.4 Toe of ballast
91.41 10.680 2.4 Face wall Inside
91.43 10.660 4 Fill top
91.44 10.650 6 Fill Top
91.49 10.600 7 Fill Top
92.54 9.550 8.5 Toe
92.58 9.510 12 GL
C/S No. 4 @Ch. 60 m
92.06 10.030 0.84 D/L RL
92.41 9.680 2.4 Toe of ballast
91.41 10.680 2.4 Face wall Inside
91.43 10.660 4 Fill top
91.44 10.650 6 Fill Top
91.49 10.600 7 Fill Top
92.49 9.600 8.5 Toe
92.52 9.570 12 GL
1.39 1.18 102.300 100.910
C/S No. 5 @Ch. 80 m
92.26 10.040 0.84 D/L RL
92.44 9.860 2.4 Toe of ballast
91.60 10.700 2.4 Face wall Inside
91.62 10.680 4 Fill top
91.65 10.650 6 Fill Top
91.69 10.610 7 Fill Top
92.65 9.650 8.5 Toe
92.70 9.600 12 GL

RDV PF 1 FINAL
BS IS FS HC RL Remarks

C/S No. 6 @Ch. 100 m


92.26 10.040 0.84 D/L RL
92.43 9.870 2.4 Toe of ballast
91.60 10.700 2.4 Face wall Inside
91.62 10.680 4 Fill top
91.65 10.650 6 Fill Top
91.69 10.610 7 Fill Top
92.69 9.610 8.5 Toe
92.71 9.590 12 GL

RDV PF 1 FINAL
BS IS FS HC RL Remarks

C/S No. 7 @Ch. 120 m


92.21 10.090 0.84 D/L RL
92.41 9.890 2.4 Toe of ballast
91.60 10.700 2.4 Face wall Inside
91.62 10.680 4 Fill top
91.65 10.650 6 Fill Top
91.69 10.610 7 Fill Top
92.93 9.370 8.5 Toe
92.85 9.450 12 GL
C/S No. 8 @Ch. 140 m
92.17 10.130 0.84 D/L RL
92.32 9.980 2.4 Toe of ballast
91.59 10.710 2.4 Face wall Inside
91.62 10.680 4 Fill top
91.65 10.650 6 Fill Top
91.69 10.610 7.2 Fill Top
90.93 11.370 7.2 Building
C/S No. 9 @Ch. 150 m
92.18 10.120 0.84 D/L RL
92.33 9.970 2.4 Toe of ballast
91.53 10.770 2.4 Face wall Inside
91.52 10.780 4 Fill top
91.50 10.800 6 Fill Top
91.49 10.810 7.2 Fill Top
90.94 11.360 7.2 Building
C/S No. 10 @Ch. 170 m
92.19 10.110 0.84 D/L RL
92.34 9.960 2.4 Toe of ballast
91.55 10.750 2.4 Face wall Inside
91.53 10.770 4 Fill top
91.51 10.790 6 Fill Top
91.49 10.810 7.2 Fill Top
90.95 11.350 7.2 Building
C/S No. 11 @Ch. 190 m
92.18 10.120 0.84 D/L RL
92.30 10.000 2.4 Toe of ballast
91.54 10.760 2.4 Face wall Inside
91.53 10.770 4 Fill top
91.51 10.790 6 Fill Top
91.49 10.810 7.2 Fill Top
90.94 11.360 7.2 Building
C/S No. 12 @Ch. 210 m
92.20 10.100 0.84 D/L RL
92.32 9.980 2.4 Toe of ballast
91.52 10.780 2.4 Face wall Inside
91.51 10.790 4 Fill top
91.51 10.790 6 Fill Top
91.49 10.810 7.2 Fill Top
90.96 11.340 7.2 Building
1.51 1.31 102.500 100.990
C/S No. 13 @Ch. 230 m
92.33 10.170 0.84 D/L RL
92.45 10.050 2.4 Toe of ballast
91.70 10.800 2.4 Face wall Inside
91.69 10.810 4 Fill top
91.67 10.830 6 Fill Top

RDV PF 1 FINAL
BS IS FS HC RL Remarks

91.65 10.850 7.2 Fill Top


91.09 11.410 7.2 Building

RDV PF 1 FINAL
BS IS FS HC RL Remarks

C/S No. 14 @Ch. 250 m


92.25 10.250 0.84 D/L RL
92.37 10.130 2.4 Toe of ballast
91.70 10.800 2.4 Face wall Inside
91.71 10.790 3.2 Fill top
91.75 10.750 6 Fill Top
91.80 10.700 8 Fill Top
91.83 10.670 9 Fill Top
92.98 9.520 10 Slope
94.13 8.370 11 GL
94.11 8.390 12 GL
91.88 10.620 13 GL
91.88 10.620 14 GL
C/S No. 15 @Ch. 270 m
92.16 10.340 0.84 D/L RL
92.28 10.220 2.4 Toe of ballast
91.61 10.890 2.4 Face wall Inside
91.68 10.820 3.2 Fill top
91.72 10.780 6 Fill Top
91.76 10.740 8 Fill Top
91.78 10.720 9 Fill Top
93.06 9.440 10 Slope
94.35 8.150 11 GL
94.23 8.270 12 GL
91.86 10.640 13 GL
91.86 10.640 14 GL
C/S No. 16 @Ch. 290 m
92.11 10.390 0.84 D/L RL
92.23 10.270 2.4 Toe of ballast
91.56 10.940 2.4 Face wall Inside
91.60 10.900 3.2 Fill top
91.63 10.870 6 Fill Top
91.65 10.850 8 Fill Top
91.70 10.800 9 Fill Top
93.03 9.470 10 Slope
94.35 8.150 11 GL
94.24 8.260 12 GL
91.84 10.660 13 GL
91.84 10.660 14 GL
C/S No. 17 @Ch. 310 m
92.10 10.400 0.84 D/L RL
92.22 10.280 2.4 Toe of ballast
91.57 10.930 2.4 Face wall Inside
91.59 10.910 3.2 Fill top
91.62 10.880 6 Fill Top
91.65 10.850 8 Fill Top
91.70 10.800 9 Fill Top
93.03 9.470 10 Slope
94.32 8.180 11 GL
94.26 8.240 12 GL
91.85 10.650 13 GL
91.85 10.650 14 GL

RDV PF 1 FINAL
BS IS FS HC RL Remarks

C/S No. 18 @Ch. 330 m


92.08 10.420 0.84 D/L RL
92.20 10.300 2.4 Toe of ballast
91.55 10.950 2.4 Face wall Inside
91.57 10.930 3.2 Fill top
91.60 10.900 6 Fill Top
91.65 10.850 8 Fill Top
91.70 10.800 9 Fill Top
93.03 9.470 10 Slope
94.33 8.170 11 GL
94.30 8.200 12 GL
91.89 10.610 13 GL
91.89 10.610 14 GL
C/S No. 19 @Ch. 350 m
92.07 10.430 0.84 D/L RL
92.19 10.310 2.4 Toe of ballast
91.53 10.970 2.4 Face wall Inside
91.55 10.950 3.3 Fill top
91.58 10.920 6 Fill Top
91.60 10.900 8 Fill Top
91.64 10.860 9 Fill Top
92.96 9.540 10 Slope
94.30 8.200 11 GL
94.28 8.220 12 GL
91.86 10.640 13 GL
91.86 10.640 14 GL
C/S No. 20 @Ch. 370 m
92.07 10.430 0.84 D/L RL
92.19 10.310 2.4 Toe of ballast
91.46 11.040 2.4 Face wall Inside
91.50 11.000 3.3 Fill top
91.54 10.960 6 Fill Top
91.58 10.920 8 Fill Top
91.60 10.900 9 Fill Top
92.88 9.620 10 Slope
94.31 8.190 11 GL
94.26 8.240 12 GL
91.82 10.680 13 GL
91.82 10.680 14 GL
C/S No. 21 @Ch. 390 m
92.04 10.460 0.84 D/L RL
92.16 10.340 2.4 Toe of ballast
91.44 11.060 2.4 Face wall Inside
91.47 11.030 3.3 Fill top
91.50 11.000 6 Fill Top
91.54 10.960 8 Fill Top
91.58 10.920 9 Fill Top
92.88 9.620 10 Slope
94.29 8.210 11 GL
94.26 8.240 12 GL
91.82 10.680 13 GL
91.82 10.680 14 GL

RDV PF 1 FINAL
BS IS FS HC RL Remarks

C/S No. 22 @Ch. 410 m


92.01 10.490 0.84 D/L RL
92.13 10.370 2.4 Toe of ballast
91.41 11.090 2.4 Face wall Inside
91.44 11.060 3.3 Fill top
91.46 11.040 6 Fill Top
91.50 11.000 8 Fill Top
92.42 10.080 9 Fill Top
93.35 9.150 10 Slope
94.29 8.210 11 GL
94.26 8.240 12 GL
91.82 10.680 13 GL
91.82 10.680 14 GL
C/S No. 23 @Ch. 425 m
92.02 10.480 0.84 D/L RL
92.14 10.360 2.4 Toe of ballast
91.43 11.070 2.4 Face wall Inside
91.44 11.060 3.3 Fill top
91.46 11.040 6 Fill Top
91.50 11.000 7.2 Fill Top
91.92 10.580 8 Fill Top
92.62 9.880 9.3 Slope
92.48 10.020 11 GL
92.33 10.170 12 GL
91.82 10.680 13 GL
91.82 10.680 14 GL
2.13 10.370 Closed on LB 13 Base
Top

RDV PF 1 FINAL
INITIAL
RAVIKAMPADU PF.1

BS IS FS HC RL Remarks

0.78 100.78 100.00 TBM on top of Br.C 407 Coping top


1.24 99.54
1.18 99.60 Closed on Cat walk slab top of Rd.10
0.78 100.38 99.60
C/S No. 1 @Ch. 0 m
3.31 97.07 3.3 Ballast toe
3.31 97.07 4.5 Slope
3.31 97.07 6 Toe
3.31 97.07 7.3 GL
3.31 97.07 13 GL
3.31 97.07 13 GL
3.33 97.05 15
3.36 97.02 17
3.34 97.04 20
3.30 97.08 22
3.36 97.02 24
3.36 97.023 24.154
3.32 97.06 26
3.33 97.05 30
C/S No. 2 @Ch. 20 m
100.38 3.3 Ballast toe
100.38 4.5 Slope
100.38 6 Toe
100.38 7.3 GL
100.38 13 GL
100.38 13 GL
100.38 15
100.38 17
100.38 20
100.38 22
100.38 24
100.38 24.154
100.38 26
100.38 30

RVD PF 1 INITIAL
-34 92.554 115.004 22.45
-20 86.227 108.327 22.1 22.275 14 311.85
-10 85.762 105.327 19.565 20.8325 10 208.325
0 71.522 89.772 18.25 18.9075 10 189.075
5 56.305 67.705 11.4 14.825 5 74.125

3.3 4.5 6 7.3 13 13 15 17 20


97.07 97.07 97.07 97.07 97.07 99.07 99.07 99.07 99.07
97.07 97.07 97.07 97.07 97.07 99.07 99.07 99.07 99.07
97.07 97.07 97.07 97.07 97.07 97.07 97.05 97.02 97.04
FINAL INITIAL
0 0 0 0
97.07 3.3 97.07 3.3
97.07 4.5 97.07 4.5
97.07 6 97.07 6
97.07 7.3 97.07 7.3
97.07 13 97.07 13
99.07 13 97.07 13
99.07 15 97.05 15
99.07 17 97.02 17
99.07 20 97.04 20
98.07 22 97.08 22
97.07 24 97.02 24
97.023 24.154 97.023 24.154
97.06 26 97.06 26
97.05 30 97.05 30
97.07 30 97.07 30
97.07 30 97.07 30
96.73 48 96.73 48
96.71 48 96.71 48
22 24 24.154 26 30 30 30 48 48
98.07 97.07 97.023 97.06 97.05 97.07 97.07 96.73 96.71
98.07 97.07 97.023 97.06 97.05 97.07 97.07 96.73 96.71
97.08 97.02 97.023 97.06 97.05 97.07 97.07 96.73 96.71
Earth work in filling for forming pathway along 3rd PIT line in Rd.11
Cross Section No. 1 @ 0 0

100.0

99.0

98.0

97.0

96.0

95.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0

RL
Distance 0.84 3.30 4.50 6.00 7.30 13.00 13.00 15.00 17.00 20.00 22.00 24.00 24.15 26.00 30.00 30.00 30.00
Final Level 97.070 97.070 97.070 97.070 97.070 99.070 99.070 99.070 99.070 98.070 97.070 97.023 97.060 97.050 97.070 97.070
Fineshed Level 97.070 97.070 97.070 97.070 97.070 99.070 99.070 99.070 99.070 98.070 97.070 97.023 97.060 97.050 97.070 97.070
Initial Level 97.070 97.070 97.070 97.070 97.070 97.070 97.050 97.020 97.040 97.080 97.020 97.023 97.060 97.050 97.070 97.070

Calculation of Earth Wor


Distance F.L I.L Diff. Mean Distance Area
3.30 97.070 97.070 0.000
4.50 97.070 97.070 0.000 0.000 1.200 0.000
6.00 97.070 97.070 0.000 0.000 1.500 0.000
7.30 97.070 97.070 0.000 0.000 1.300 0.000
13.00 97.070 97.070 0.000 0.000 5.700 0.000
13.00 99.070 97.070 2.000 1.000 0.000 0.000
15.00 99.070 97.050 2.020 2.010 2.000 4.020
17.00 99.070 97.020 2.050 2.035 2.000 4.070
20.00 99.070 97.040 2.030 2.040 3.000 6.120
22.00 98.070 97.080 0.990 1.510 2.000 3.020
24.00 97.070 97.020 0.050 0.520 2.000 1.040
24.15 97.023 97.023 0.000 0.025 0.154 0.004
26.00 97.060 97.060 0.000 0.000 1.846 0.000
30.00 97.050 97.050 0.000 0.000 4.000 0.000
30.00 97.070 97.070 0.000 0.000 0.000 0.000
30.00 97.070 97.070 0.000 0.000 0.000 0.000

18.274 M2

SSE/W/SW/CCT
Earth work in filling for forming pathway along 3rd PIT line in Rd.11
Cross Section No. 2 @ 50 0

100.0

99.0

98.0

97.0

96.0

95.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0

RL 10.19
Distance 0.84 3.30 4.50 6.00 7.30 13.00 13.00 15.00 17.00 20.00 22.00 24.00 23.90 26.00 30.00 30.00 30.00
Final Level 96.710 96.710 96.710 96.710 96.710 98.720 98.720 98.720 98.720 97.720 96.720 96.772 96.740 96.720 96.720 96.720
Fineshed Level 96.710 96.710 96.710 96.710 96.710 98.720 98.720 98.720 98.720 97.720 96.720 96.772 96.740 96.720 96.720 96.720
Initial Level 96.710 96.710 96.710 96.710 96.710 96.710 96.760 96.740 96.700 96.810 96.770 96.772 96.740 96.720 96.720 96.720

Calculation of Earth Wor


Distance F.L I.L Diff. Mean Distance Area
3.30 96.710 96.710 0.000
4.50 96.710 96.710 0.000 0.000 1.200 0.000
6.00 96.710 96.710 0.000 0.000 1.500 0.000
7.30 96.710 96.710 0.000 0.000 1.300 0.000
13.00 96.710 96.710 0.000 0.000 5.700 0.000
13.00 98.720 96.710 2.010 1.005 0.000 0.000
15.00 98.720 96.760 1.960 1.985 2.000 3.970
17.00 98.720 96.740 1.980 1.970 2.000 3.940
20.00 98.720 96.700 2.020 2.000 3.000 6.000
22.00 97.720 96.810 0.910 1.465 2.000 2.930
24.00 96.720 96.770 -0.050 0.430 2.000 0.860
23.90 96.772 96.772 0.000 -0.025 -0.103 0.003
26.00 96.740 96.740 0.000 0.000 2.103 0.000
30.00 96.720 96.720 0.000 0.000 4.000 0.000
30.00 96.720 96.720 0.000 0.000 0.000 0.000
30.00 96.720 96.720 0.000 0.000 0.000 0.000

17.703 M2

SSE/W/SW/CCT
Earth work in filling for forming pathway along 3rd PIT line in Rd.11
Cross Section No. 3 @ 100 0

100.0

99.0

98.0

97.0

96.0

95.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0

RL 10.19
Distance 0.84 3.30 4.50 6.00 7.30 13.00 13.00 15.00 17.00 20.00 22.00 24.00 24.13 26.00 30.00 30.00 30.00
Final Level 96.880 96.880 96.880 96.880 96.880 98.890 98.890 98.890 98.890 97.890 96.890 96.824 96.880 96.810 96.810 96.810
Fineshed Level 96.880 96.880 96.880 96.880 96.880 98.890 98.890 98.890 98.890 97.890 96.890 96.824 96.880 96.810 96.810 96.810
Initial Level 96.880 96.880 96.880 96.880 96.880 96.880 96.840 96.890 96.780 96.780 96.820 96.824 96.880 96.810 96.810 96.810

Calculation of Earth Wor


Distance F.L I.L Diff. Mean Distance Area
3.30 96.880 96.880 0.000
4.50 96.880 96.880 0.000 0.000 1.200 0.000
6.00 96.880 96.880 0.000 0.000 1.500 0.000
7.30 96.880 96.880 0.000 0.000 1.300 0.000
13.00 96.880 96.880 0.000 0.000 5.700 0.000
13.00 98.890 96.880 2.010 1.005 0.000 0.000
15.00 98.890 96.840 2.050 2.030 2.000 4.060
17.00 98.890 96.890 2.000 2.025 2.000 4.050
20.00 98.890 96.780 2.110 2.055 3.000 6.165
22.00 97.890 96.780 1.110 1.610 2.000 3.220
24.00 96.890 96.820 0.070 0.590 2.000 1.180
24.13 96.824 96.824 0.000 0.035 0.132 0.005
26.00 96.880 96.880 0.000 0.000 1.868 0.000
30.00 96.810 96.810 0.000 0.000 4.000 0.000
30.00 96.810 96.810 0.000 0.000 0.000 0.000
30.00 96.810 96.810 0.000 0.000 0.000 0.000

18.680 M2

SSE/W/SW/CCT
Earth work in filling for forming pathway along 3rd PIT line in Rd.11
Cross Section No. 4 @ 150 0

100.0

99.0

98.0

97.0

96.0

95.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0

RL 10.19
Distance 0.84 3.30 4.50 6.00 7.30 13.00 13.00 15.00 17.00 20.00 22.00 24.00 24.23 26.00 30.00 30.00 30.00
Final Level 96.690 96.690 96.690 96.690 96.690 98.740 98.740 98.740 98.740 97.740 96.740 96.265 96.660 96.670 96.670 96.670
Fineshed Level 96.690 96.690 96.690 96.690 96.690 98.740 98.740 98.740 98.740 97.740 96.740 96.265 96.660 96.670 96.670 96.670
Initial Level 96.690 96.690 96.690 96.690 96.690 96.690 96.720 96.720 96.780 96.640 96.620 96.265 96.660 96.670 96.670 96.670

Calculation of Earth Wor


Distance F.L I.L Diff. Mean Distance Area
3.30 96.690 96.690 0.000
4.50 96.690 96.690 0.000 0.000 1.200 0.000
6.00 96.690 96.690 0.000 0.000 1.500 0.000
7.30 96.690 96.690 0.000 0.000 1.300 0.000
13.00 96.690 96.690 0.000 0.000 5.700 0.000
13.00 98.740 96.690 2.050 1.025 0.000 0.000
15.00 98.740 96.720 2.020 2.035 2.000 4.070
17.00 98.740 96.720 2.020 2.020 2.000 4.040
20.00 98.740 96.780 1.960 1.990 3.000 5.970
22.00 97.740 96.640 1.100 1.530 2.000 3.060
24.00 96.740 96.620 0.120 0.610 2.000 1.220
24.23 96.265 96.265 0.000 0.060 0.231 0.014
26.00 96.660 96.660 0.000 0.000 1.769 0.000
30.00 96.670 96.670 0.000 0.000 4.000 0.000
30.00 96.670 96.670 0.000 0.000 0.000 0.000
30.00 96.670 96.670 0.000 0.000 0.000 0.000

18.374 M2

SSE/W/SW/CCT
Earth work in filling for forming pathway along 3rd PIT line in Rd.11
Cross Section No. 5 @ 200 0

100.0

99.0

98.0

97.0

96.0

95.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0

RL 10.19
Distance 0.84 3.30 4.50 6.00 7.30 13.00 13.00 15.00 17.00 20.00 22.00 24.00 24.32 26.00 30.00 30.00 30.00
Final Level 96.860 96.860 96.860 96.860 96.860 98.910 98.910 98.910 98.910 97.910 96.910 96.753 96.820 96.760 96.760 96.760
Fineshed Level 96.860 96.860 96.860 96.860 96.860 98.910 98.910 98.910 98.910 97.910 96.910 96.753 96.820 96.760 96.760 96.760
Initial Level 96.860 96.860 96.860 96.860 96.860 96.860 96.900 96.840 96.810 96.760 96.740 96.753 96.820 96.760 96.760 96.760

Calculation of Earth Wor


Distance F.L I.L Diff. Mean Distance Area
3.30 96.860 96.860 0.000
4.50 96.860 96.860 0.000 0.000 1.200 0.000
6.00 96.860 96.860 0.000 0.000 1.500 0.000
7.30 96.860 96.860 0.000 0.000 1.300 0.000
13.00 96.860 96.860 0.000 0.000 5.700 0.000
13.00 98.910 96.860 2.050 1.025 0.000 0.000
15.00 98.910 96.900 2.010 2.030 2.000 4.060
17.00 98.910 96.840 2.070 2.040 2.000 4.080
20.00 98.910 96.810 2.100 2.085 3.000 6.255
22.00 97.910 96.760 1.150 1.625 2.000 3.250
24.00 96.910 96.740 0.170 0.660 2.000 1.320
24.32 96.753 96.753 0.000 0.085 0.315 0.027
26.00 96.820 96.820 0.000 0.000 1.685 0.000
30.00 96.760 96.760 0.000 0.000 4.000 0.000
30.00 96.760 96.760 0.000 0.000 0.000 0.000
30.00 96.760 96.760 0.000 0.000 0.000 0.000

18.992 M2

SSE/W/SW/CCT
Earth work in filling for forming pathway along 3rd PIT line in Rd.11
Cross Section No. 6 @ 250 0

100.0

99.0

98.0

97.0

96.0

95.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0

RL 10.19
Distance 0.84 3.30 4.50 6.00 7.30 13.00 13.00 15.00 17.00 20.00 22.00 24.00 24.12 26.00 30.00 30.00 30.00
Final Level 97.070 97.070 97.070 97.070 97.070 99.110 99.110 99.110 99.110 98.110 97.110 97.051 97.060 97.060 97.060 97.060
Fineshed Level 97.070 97.070 97.070 97.070 97.070 99.110 99.110 99.110 99.110 98.110 97.110 97.051 97.060 97.060 97.060 97.060
Initial Level 97.070 97.070 97.070 97.070 97.070 97.070 97.120 97.030 97.010 97.000 97.050 97.051 97.060 97.060 97.060 97.060

Calculation of Earth Wor


Distance F.L I.L Diff. Mean Distance Area
3.30 97.070 97.070 0.000
4.50 97.070 97.070 0.000 0.000 1.200 0.000
6.00 97.070 97.070 0.000 0.000 1.500 0.000
7.30 97.070 97.070 0.000 0.000 1.300 0.000
13.00 97.070 97.070 0.000 0.000 5.700 0.000
13.00 99.110 97.070 2.040 1.020 0.000 0.000
15.00 99.110 97.120 1.990 2.015 2.000 4.030
17.00 99.110 97.030 2.080 2.035 2.000 4.070
20.00 99.110 97.010 2.100 2.090 3.000 6.270
22.00 98.110 97.000 1.110 1.605 2.000 3.210
24.00 97.110 97.050 0.060 0.585 2.000 1.170
24.12 97.051 97.051 0.000 0.030 0.119 0.004
26.00 97.060 97.060 0.000 0.000 1.881 0.000
30.00 97.060 97.060 0.000 0.000 4.000 0.000
30.00 97.060 97.060 0.000 0.000 0.000 0.000
30.00 97.060 97.060 0.000 0.000 0.000 0.000

18.754 M2

SSE/W/SW/CCT
Earth work in filling for forming pathway along 3rd PIT line in Rd.11
Cross Section No. 7 @ 300 0

100.0

99.0

98.0

97.0

96.0

95.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0

RL 10.19
Distance 0.84 3.30 4.50 6.00 7.30 13.00 13.00 15.00 17.00 20.00 22.00 24.00 24.04 26.00 30.00 30.00 30.00
Final Level 96.960 96.960 96.960 96.960 96.960 99.060 99.060 99.060 99.060 98.060 97.060 97.042 97.160 97.040 97.040 97.040
Fineshed Level 96.960 96.960 96.960 96.960 96.960 99.060 99.060 99.060 99.060 98.060 97.060 97.042 97.160 97.040 97.040 97.040
Initial Level 96.960 96.960 96.960 96.960 96.960 96.960 96.920 97.050 97.080 97.110 97.040 97.042 97.160 97.040 97.040 97.040

Calculation of Earth Wor


Distance F.L I.L Diff. Mean Distance Area
3.30 96.960 96.960 0.000
4.50 96.960 96.960 0.000 0.000 1.200 0.000
6.00 96.960 96.960 0.000 0.000 1.500 0.000
7.30 96.960 96.960 0.000 0.000 1.300 0.000
13.00 96.960 96.960 0.000 0.000 5.700 0.000
13.00 99.060 96.960 2.100 1.050 0.000 0.000
15.00 99.060 96.920 2.140 2.120 2.000 4.240
17.00 99.060 97.050 2.010 2.075 2.000 4.150
20.00 99.060 97.080 1.980 1.995 3.000 5.985
22.00 98.060 97.110 0.950 1.465 2.000 2.930
24.00 97.060 97.040 0.020 0.485 2.000 0.970
24.04 97.042 97.042 0.000 0.010 0.036 0.000
26.00 97.160 97.160 0.000 0.000 1.964 0.000
30.00 97.040 97.040 0.000 0.000 4.000 0.000
30.00 97.040 97.040 0.000 0.000 0.000 0.000
30.00 97.040 97.040 0.000 0.000 0.000 0.000

18.275 M2

SSE/W/SW/CCT
Earth work in filling for forming pathway along 3rd PIT line in Rd.11
Cross Section No. 8 @ 350 0

100.0

99.0

98.0

97.0

96.0

95.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0

RL 10.19
Distance 0.84 3.30 4.50 6.00 7.30 13.00 13.00 15.00 17.00 20.00 22.00 24.00 24.11 26.00 30.00 30.00 30.00
Final Level 97.070 97.070 97.070 97.070 97.070 99.090 99.090 99.090 99.090 98.090 97.090 97.030 96.970 96.920 96.920 96.920
Fineshed Level 97.070 97.070 97.070 97.070 97.070 99.090 99.090 99.090 99.090 98.090 97.090 97.030 96.970 96.920 96.920 96.920
Initial Level 97.070 97.070 97.070 97.070 97.070 97.070 97.010 96.930 97.080 97.110 97.040 97.030 96.970 96.920 96.920 96.920

Calculation of Earth Wor


Distance F.L I.L Diff. Mean Distance Area
3.30 97.070 97.070 0.000
4.50 97.070 97.070 0.000 0.000 1.200 0.000
6.00 97.070 97.070 0.000 0.000 1.500 0.000
7.30 97.070 97.070 0.000 0.000 1.300 0.000
13.00 97.070 97.070 0.000 0.000 5.700 0.000
13.00 99.090 97.070 2.020 1.010 0.000 0.000
15.00 99.090 97.010 2.080 2.050 2.000 4.100
17.00 99.090 96.930 2.160 2.120 2.000 4.240
20.00 99.090 97.080 2.010 2.085 3.000 6.255
22.00 98.090 97.110 0.980 1.495 2.000 2.990
24.00 97.090 97.040 0.050 0.515 2.000 1.030
24.11 97.030 97.030 0.000 0.025 0.108 0.003
26.00 96.970 96.970 0.000 0.000 1.892 0.000
30.00 96.920 96.920 0.000 0.000 4.000 0.000
30.00 96.920 96.920 0.000 0.000 0.000 0.000
30.00 96.920 96.920 0.000 0.000 0.000 0.000

18.618 M2

SSE/W/SW/CCT
Earth work in filling for forming pathway along 3rd PIT line in Rd.11
Cross Section No. 9 @ 400 0

100.0

99.0

98.0

97.0

96.0

95.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0

RL 10.19
Distance 0.84 3.30 4.50 6.00 7.30 13.00 13.00 15.00 17.00 20.00 22.00 24.00 24.28 26.00 30.00 30.00 30.00
Final Level 96.900 96.900 96.900 96.900 96.900 99.030 99.030 99.030 99.030 98.030 97.030 96.893 96.970 96.950 96.950 96.950
Fineshed Level 96.900 96.900 96.900 96.900 96.900 99.030 99.030 99.030 99.030 98.030 97.030 96.893 96.970 96.950 96.950 96.950
Initial Level 96.900 96.900 96.900 96.900 96.900 96.990 97.010 96.910 96.980 96.990 96.890 96.893 96.970 96.950 96.950 96.950

Calculation of Earth Wor


Distance F.L I.L Diff. Mean Distance Area
3.30 96.900 96.900 0.000
4.50 96.900 96.900 0.000 0.000 1.200 0.000
6.00 96.900 96.900 0.000 0.000 1.500 0.000
7.30 96.900 96.900 0.000 0.000 1.300 0.000
13.00 96.900 96.900 0.000 0.000 5.700 0.000
13.00 99.030 96.990 2.040 1.020 0.000 0.000
15.00 99.030 97.010 2.020 2.030 2.000 4.060
17.00 99.030 96.910 2.120 2.070 2.000 4.140
20.00 99.030 96.980 2.050 2.085 3.000 6.255
22.00 98.030 96.990 1.040 1.545 2.000 3.090
24.00 97.030 96.890 0.140 0.590 2.000 1.180
24.28 96.893 96.893 0.000 0.070 0.275 0.019
26.00 96.970 96.970 0.000 0.000 1.725 0.000
30.00 96.950 96.950 0.000 0.000 4.000 0.000
30.00 96.950 96.950 0.000 0.000 0.000 0.000
30.00 96.950 96.950 0.000 0.000 0.000 0.000

18.744 M2

SSE/W/SW/CCT
Earth work in filling for forming pathway along 3rd PIT line in Rd.11
Cross Section No. 10 @ 450 0

100.0

99.0

98.0

97.0

96.0

95.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0

RL 10.19
Distance 0.84 3.30 4.50 6.00 7.30 13.00 13.00 15.00 17.00 20.00 22.00 24.00 24.57 26.00 30.00 30.00 30.00
Final Level 97.140 97.140 97.140 97.140 97.140 99.180 99.180 99.180 99.180 98.180 97.180 96.896 96.910 96.950 96.950 96.950
Fineshed Level 97.140 97.140 97.140 97.140 97.140 99.180 99.180 99.180 99.180 98.180 97.180 96.896 96.910 96.950 96.950 96.950
Initial Level 97.140 97.140 97.140 97.140 97.140 97.140 97.160 96.910 96.980 96.990 96.890 96.896 96.910 96.950 96.950 96.950

Calculation of Earth Wor


Distance F.L I.L Diff. Mean Distance Area
3.30 97.140 97.140 0.000
4.50 97.140 97.140 0.000 0.000 1.200 0.000
6.00 97.140 97.140 0.000 0.000 1.500 0.000
7.30 97.140 97.140 0.000 0.000 1.300 0.000
13.00 97.140 97.140 0.000 0.000 5.700 0.000
13.00 99.180 97.140 2.040 1.020 0.000 0.000
15.00 99.180 97.160 2.020 2.030 2.000 4.060
17.00 99.180 96.910 2.270 2.145 2.000 4.290
20.00 99.180 96.980 2.200 2.235 3.000 6.705
22.00 98.180 96.990 1.190 1.695 2.000 3.390
24.00 97.180 96.890 0.290 0.740 2.000 1.480
24.57 96.896 96.896 0.000 0.145 0.569 0.083
26.00 96.910 96.910 0.000 0.000 1.431 0.000
30.00 96.950 96.950 0.000 0.000 4.000 0.000
30.00 96.950 96.950 0.000 0.000 0.000 0.000
30.00 96.950 96.950 0.000 0.000 0.000 0.000

20.008 M2

SSE/W/SW/CCT
Earth work in filling for forming pathway along 3rd PIT line in Rd.11
Cross Section No. 11 @ 500 0

100.0

99.0

98.0

97.0

96.0

95.0
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 24.0 26.0 28.0 30.0

RL 10.19
Distance 0.84 3.30 4.50 6.00 7.30 13.00 13.00 15.00 17.00 20.00 22.00 24.00 24.25 26.00 30.00 30.00 30.00
Final Level 97.220 97.220 97.220 97.220 97.220 99.230 99.230 99.230 99.230 98.230 97.230 97.108 97.090 97.080 97.080 97.080
Fineshed Level 97.220 97.220 97.220 97.220 97.220 99.230 99.230 99.230 99.230 98.230 97.230 97.108 97.090 97.080 97.080 97.080
Initial Level 97.220 97.220 97.220 97.220 97.220 97.220 97.180 97.120 97.110 97.180 97.110 97.108 97.090 97.080 97.080 97.080

Calculation of Earth Wor


Distance F.L I.L Diff. Mean Distance Area
3.30 97.220 97.220 0.000
4.50 97.220 97.220 0.000 0.000 1.200 0.000
6.00 97.220 97.220 0.000 0.000 1.500 0.000
7.30 97.220 97.220 0.000 0.000 1.300 0.000
13.00 97.220 97.220 0.000 0.000 5.700 0.000
13.00 99.230 97.220 2.010 1.005 0.000 0.000
15.00 99.230 97.180 2.050 2.030 2.000 4.060
17.00 99.230 97.120 2.110 2.080 2.000 4.160
20.00 99.230 97.110 2.120 2.115 3.000 6.345
22.00 98.230 97.180 1.050 1.585 2.000 3.170
24.00 97.230 97.110 0.120 0.585 2.000 1.170
24.25 97.108 97.108 0.000 0.060 0.245 0.015
26.00 97.090 97.090 0.000 0.000 1.755 0.000
30.00 97.080 97.080 0.000 0.000 4.000 0.000
30.00 97.080 97.080 0.000 0.000 0.000 0.000
30.00 97.080 97.080 0.000 0.000 0.000 0.000

18.920 M2

SSE/W/SW/CCT
BVL - MPU Bank Protection Wall KM 614/16 to ( D/L LINE ) FINAL

BS IS FS HC RL Remarks

10.00 10.00 TBM on top of Parapet at Br.330 D/L @


KM 614/16-18

C/S No. 1 @Ch.614 510 m


-0.11 10.11 0.84
0.54 9.46 2.7
0.69 9.31 4.5
1.36 8.64 6
2.23 7.77 8
2.39 7.61 8.5
2.39 7.61 9.2
3.55 6.45 9.2
3.60 6.4 9.65
3.60 6.4 9.65
2.39 7.61 9.65
3.22 6.78 9.65
3.28 6.72 10
3.38 6.62 12
3.40 6.6 14
3.65 6.35 15
3.66 6.34 16

C/S No. 2 @Ch.614 530 m


-0.12 10.12 0.84
0.21 9.79 2.7
0.33 9.67 4.5
0.62 9.38 6
1.79 8.21 8
2.43 7.57 9
2.39 7.61 10.1
3.42 6.58 10.1
3.42 6.58 10.55
3.42 6.58 10.55
2.39 7.61 10.55
2.91 7.09 10.55
2.93 7.07 12
2.93 7.07 14
2.96 7.04 15
3.50 6.5 16

C/S No. 3 @Ch.614 550 m


-0.14 10.14 0.84
0.22 9.78 2.7
0.24 9.76 4.2
1.55 8.45 6
1.62 8.38 7.4
1.39 8.61 7.4
3.26 6.74 7.4
3.26 6.74 7.85

LC 440 UP Initial
BS IS FS HC RL Remarks

3.26 6.74 7.85


1.39 8.61 7.85
2.63 7.37 7.85
2.66 7.34 8
2.71 7.29 12
2.74 7.26 12.5
3.35 6.65 13.8
3.34 6.66 14
3.36 6.64 16

C/S No. 4 @Ch.614 570 m


-0.13 10.13 0.84
0.29 9.71 2.7
0.30 9.7 4.2
1.70 8.3 6
1.75 8.25 7
1.54 8.46 7
3.26 6.74 7
3.26 6.74 7.45
3.26 6.74 7.45
1.54 8.46 7.45
2.55 7.45 7.45
2.55 7.45 8
2.56 7.44 10
2.57 7.43 12
3.36 6.64 13.5
3.37 6.63 14
3.39 6.61 16

C/S No. 5 @Ch.614 590 m


-0.12 10.12 0.84
0.16 9.84 2.7
0.30 9.7 4.2
1.69 8.31 6
1.75 8.25 6.8
1.52 8.48 6.8
3.04 6.96 6.8
3.04 6.96 7.25
3.04 6.96 7.25
1.52 8.48 7.25
2.37 7.63 7.25
2.40 7.6 8
2.46 7.54 10
2.49 7.51 12
3.14 6.86 13.2
3.15 6.85 14
3.19 6.81 16

LC 440 UP Initial
BS IS FS HC RL Remarks

C/S No. 6 @Ch.614 610 m


-0.11 10.11 0.84
0.37 9.63 2.7
0.42 9.58 4.2
1.76 8.24 6
1.80 8.2 7.1
1.57 8.43 7.1
2.90 7.1 7.1
2.90 7.1 7.55
2.90 7.1 7.55
1.57 8.43 7.55
2.55 7.45 7.55
2.56 7.44 8
2.59 7.41 10
2.63 7.37 12
2.99 7.01 12.8
3.01 6.99 14
3.04 6.96 16

C/S No. 7 @Ch.614 630 m


-0.15 10.15 0.84
0.32 9.68 2.6
0.42 9.58 4.2
1.59 8.41 6
1.65 8.35 7.1
1.42 8.58 7.1
2.89 7.11 7.1
2.89 7.11 7.55
2.89 7.11 7.55
1.42 8.58 7.55
2.36 7.64 7.55
2.42 7.58 8
2.48 7.52 10
2.52 7.48 12
2.98 7.02 12.8
2.99 7.01 14
2.99 7.01 16

C/S No. 8 @Ch.614 650 m


-0.19 10.19 0.84
0.27 9.73 2.6
0.29 9.71 4.5
0.96 9.04 6
1.63 8.37 7.2
1.63 8.37 8.2
1.36 8.64 8.2
2.90 7.1 8.2
2.90 7.1 8.65
2.90 7.1 8.65

LC 440 UP Initial
BS IS FS HC RL Remarks

1.36 8.64 8.65


2.30 7.7 8.65
2.32 7.68 10
2.34 7.66 12.2
2.96 7.04 13.5
2.97 7.03 14
2.97 7.03 16

C/S No. 9 @Ch.614 670 m


-0.18 10.18 0.84
0.31 9.69 2.6
0.36 9.64 4.5
0.91 9.09 6
1.39 8.61 7.2
1.43 8.57 8.15
1.20 8.8 8.15
2.76 7.24 8.15
2.76 7.24 8.6
2.76 7.24 8.6
1.20 8.8 8.6
2.29 7.71 8.6
2.31 7.69 10
2.35 7.65 12.5
2.85 7.15 13.5
2.86 7.14 14
2.88 7.12 16

C/S No. 10 @Ch.614 690 m


-0.16 10.16 0.84
0.19 9.81 2.6
0.26 9.74 4
1.42 8.58 6
1.47 8.53 7
1.23 8.77 7
2.80 7.2 7
2.80 7.2 7.45
2.80 7.2 7.45
1.23 8.77 7.45
1.89 8.11 7.45
1.94 8.06 10
1.96 8.04 11
2.40 7.6 12
2.89 7.11 13
2.90 7.1 14
2.92 7.08 16

C/S No. 11 @Ch.614 710 m

LC 440 UP Initial
BS IS FS HC RL Remarks

-0.14 10.14 0.84


0.22 9.78 2.6
0.27 9.73 4
1.42 8.58 6
1.47 8.53 7
1.33 8.67 7
2.77 7.23 7
2.77 7.23 7.45
2.77 7.23 7.45
1.33 8.67 7.45
2.11 7.89 7.45
2.15 7.85 10
2.18 7.82 12
2.84 7.16 13.3
2.85 7.15 14
2.88 7.12 16

C/S No. 12 @Ch.614 730 m


-0.11 10.11 0.84
0.15 9.85 2.6
0.18 9.82 3.6
1.71 8.29 6
1.65 8.35 6.9
1.42 8.58 6.9
2.78 7.22 6.9
2.78 7.22 7.35
2.78 7.22 7.35
1.42 8.58 7.35
2.15 7.85 7.35
2.18 7.82 10
2.21 7.79 11
2.85 7.15 12
2.88 7.12 14
2.88 7.12 16

C/S No. 13 @Ch.614 750 m


-0.13 10.13 0.84
0.16 9.84 2.6
0.19 9.81 3.2
1.29 8.71 6
1.65 8.35 7
1.70 8.3 8
1.47 8.53 8
2.75 7.25 8
2.75 7.25 8.45
2.75 7.25 8.45
1.47 8.53 8.45
2.12 7.88 8.45

LC 440 UP Initial
BS IS FS HC RL Remarks

2.14 7.86 10
2.17 7.83 12
2.19 7.81 12.5
2.84 7.16 14
2.86 7.14 16

C/S No. 14 @Ch.614 770 m


-0.15 10.15 0.84
0.13 9.87 2.6
0.16 9.84 3.4
1.23 8.77 6
1.76 8.24 7
1.80 8.2 7.9
1.57 8.43 7.9
2.80 7.2 7.9
2.80 7.2 8.35
2.80 7.2 8.35
1.57 8.43 8.35
2.28 7.72 8.35
2.30 7.7 10
2.35 7.65 12.4
2.89 7.11 13.5
2.90 7.1 14
2.92 7.08 16

C/S No. 15 @Ch.614 790 m


-0.17 10.17 0.84
0.12 9.88 2.6
0.15 9.85 3.5
1.28 8.72 6
1.76 8.24 7
1.80 8.2 7.8
1.47 8.53 7.8
2.63 7.37 7.8
2.63 7.37 8.25
2.63 7.37 8.25
1.47 8.53 8.25
2.27 7.73 8.25
2.31 7.69 10
2.35 7.65 12
2.69 7.31 12.8
2.70 7.3 14
2.72 7.28 16

C/S No. 16 @Ch.614 810 m


-0.17 10.17 0.84
0.31 9.69 2.6

LC 440 UP Initial
BS IS FS HC RL Remarks

0.35 9.65 3.5


1.73 8.27 6
1.73 8.27 6
1.78 8.22 6.8
1.46 8.54 6.8
2.64 7.36 6.8
2.64 7.36 7.25
2.64 7.36 7.25
1.46 8.54 7.25
2.04 7.96 7.25
2.07 7.93 10
2.12 7.88 12
2.71 7.29 13.2
2.72 7.28 14
2.74 7.26 16

C/S No. 17 @Ch.614 830 m


-0.14 10.14 0.84
0.20 9.8 2.6
0.25 9.75 3.5
1.12 8.88 6
1.45 8.55 7
1.51 8.49 8
1.28 8.72 8
2.54 7.46 8
2.54 7.46 8.45
2.54 7.46 8.45
1.28 8.72 8.45
1.96 8.04 8.45
1.98 8.02 10
2.00 8 12
2.62 7.38 13.5
2.63 7.37 14
2.66 7.34 16

C/S No. 18 @Ch.614 850 m


-0.13 10.13 0.84
0.22 9.78 2.6
0.25 9.75 3.5
1.52 8.48 6
1.55 8.45 6.9
1.32 8.68 6.9
2.40 7.6 6.9
2.40 7.6 7.35
2.40 7.6 7.35
1.32 8.68 7.35
1.89 8.11 7.35
1.92 8.08 10
1.94 8.06 11.2
2.34 7.66 12

LC 440 UP Initial
BS IS FS HC RL Remarks

2.47 7.53 12.3


2.50 7.5 14
2.54 7.46 16

C/S No. 19 @Ch.614 870 m


-0.13 10.13 0.84
0.25 9.75 2.6
0.29 9.71 3.5
1.50 8.5 6
1.54 8.46 7
1.31 8.69 7
2.38 7.62 7
2.38 7.62 7.45
2.38 7.62 7.45
1.31 8.69 7.45
1.82 8.18 7.45
1.85 8.15 10
1.87 8.13 12
2.49 7.51 13.3
2.52 7.48 14
2.55 7.45 16

C/S No. 20 @Ch.614 890 m


-0.11 10.11 0.84
0.33 9.67 2.6
0.37 9.63 3.5
1.51 8.49 6
1.58 8.42 6.9
1.35 8.65 6.9
2.36 7.64 6.9
2.36 7.64 7.35
2.36 7.64 7.35
1.35 8.65 7.35
1.87 8.13 7.35
1.90 8.1 10
1.93 8.07 11.5
1.94 8.06 12
2.47 7.53 12.5
2.46 7.54 14
2.48 7.52 16

C/S No. 21 @Ch.614 910 m


-0.14 10.14 0.84
0.42 9.58 2.6
0.45 9.55 3.5
1.50 8.5 6

LC 440 UP Initial
BS IS FS HC RL Remarks

1.53 8.47 6.8


1.30 8.7 6.8
2.12 7.88 6.8
2.12 7.88 7.25
2.12 7.88 7.25
1.30 8.7 7.25
1.79 8.21 7.25
1.82 8.18 10
1.85 8.15 12
2.21 7.79 12.7
2.22 7.78 14
2.24 7.76 16

C/S No. 22 @Ch.614 930 m


-0.18 10.18 0.84
0.32 9.68 2.6
0.36 9.64 3.2
1.45 8.55 6
1.49 8.51 7.1
1.26 8.74 7.1
2.17 7.83 7.1
2.17 7.83 7.55
2.17 7.83 7.55
1.26 8.74 7.55
1.90 8.1 7.55
1.92 8.08 10
1.94 8.06 12
2.26 7.74 12.6
2.28 7.72 14
2.31 7.69 16

C/S No. 23 @Ch.614 950 m


-0.20 10.2 0.84
0.38 9.62 2.6
0.42 9.58 3.2
1.46 8.54 6
1.51 8.49 7
1.28 8.72 7
2.18 7.82 7
2.18 7.82 7.45
2.18 7.82 7.45
1.28 8.72 7.45
1.84 8.16 7.45
1.88 8.12 10
1.90 8.1 12
2.26 7.74 12.7
2.29 7.71 14
2.32 7.68 16

LC 440 UP Initial
BS IS FS HC RL Remarks

C/S No. 24 @Ch.614 970 m


-0.19 10.19 0.84
0.48 9.52 2.6
0.52 9.48 4.5
1.03 8.97 6
1.45 8.55 7.3
1.49 8.51 8.3
1.26 8.74 8.3
2.23 7.77 8.3
2.23 7.77 8.75
2.23 7.77 8.75
1.26 8.74 8.75
1.75 8.25 8.75
1.77 8.23 10
1.79 8.21 12
1.80 8.2 13
2.32 7.68 14
2.36 7.64 16

C/S No. 25 @Ch.614 990 m


-0.19 10.19 0.84
0.48 9.52 2.6
0.52 9.48 4.5
1.07 8.93 6
1.45 8.55 7.3
1.49 8.51 8.3
1.26 8.74 8.3
2.23 7.77 8.3
2.23 7.77 8.75
2.23 7.77 8.75
1.26 8.74 8.75
1.75 8.25 8.75
1.77 8.23 10
1.79 8.21 12
1.80 8.2 13
2.32 7.68 14
2.36 7.64 16

LC 440 UP Initial
BVL - MPU Bank Protection Wall KM 614/16 to ( D/L LINE ) Initial

BS IS FS HC RL Remarks

10.00 10.00 TBM on top of Parapet at Br.330 D/L @


KM 614/16-18

C/S No. 1 @Ch.614 510 m


-0.11 10.11 0.84
0.54 9.46 2.7
0.69 9.31 4.5
1.61 8.39 6
3.13 6.87 8
3.55 6.45 8.5
3.55 6.45 9.2
3.55 6.45 9.2
3.60 6.4 9.65
3.60 6.4 9.65
3.60 6.4 9.65
3.60 6.4 9.65
3.60 6.4 10
6.38 12
6.36 14
6.35 15
6.34 16

C/S No. 2 @Ch.614 530 m


-0.12 10.12 0.84
0.21 9.79 2.7
0.33 9.67 4.5
0.62 9.38 6
2.44 7.56 8
3.41 6.59 9
3.42 6.58 10.1
3.42 6.58 10.1
3.42 6.58 10.55
3.42 6.58 10.55
3.42 6.58 10.55
3.42 6.58 10.55
3.43 6.57 12
6.55 14
6.52 15
6.5 16
16

C/S No. 3 @Ch.614 550 m


-0.14 10.14 0.84
0.22 9.78 2.7
0.24 9.76 4.2
1.78 8.22 6
3.26 6.74 7.4
3.26 6.74 7.4
3.26 6.74 7.4
3.26 6.74 7.85

LC 440 UP Initial
BS IS FS HC RL Remarks

3.26 6.74 7.85


3.26 6.74 7.85
3.26 6.74 7.85
3.27 6.73 8
3.31 6.69 12
6.68 12.5
6.65 13.8
6.66 14
6.64 16

C/S No. 4 @Ch.614 570 m


-0.13 10.13 0.84
0.29 9.71 2.7
0.30 9.7 4.2
2.06 7.94 6
3.26 6.74 7
3.26 6.74 7
3.26 6.74 7
3.26 6.74 7.45
3.26 6.74 7.45
3.26 6.74 7.45
3.26 6.74 7.45
3.27 6.73 8
3.31 6.69 10
6.66 12
6.64 13.5
6.63 14
6.61 16

C/S No. 5 @Ch.614 590 m


-0.12 10.12 0.84
0.16 9.84 2.7
0.30 9.7 4.2
2.11 7.89 6
3.04 6.96 6.8
3.04 6.96 6.8
3.04 6.96 6.8
3.04 6.96 7.25
3.04 6.96 7.25
3.04 6.96 7.25
3.04 6.96 7.25
3.06 6.94 8
3.08 6.92 10
6.9 12
6.86 13.2
6.85 14
6.81 16

LC 440 UP Initial
BS IS FS HC RL Remarks

C/S No. 6 @Ch.614 610 m


-0.11 10.11 0.84
0.37 9.63 2.7
0.42 9.58 4.2
1.96 8.04 6
2.90 7.1 7.1
2.90 7.1 7.1
2.90 7.1 7.1
2.90 7.1 7.55
2.90 7.1 7.55
2.90 7.1 7.55
2.90 7.1 7.55
2.92 7.08 8
2.95 7.05 10
7.03 12
7.01 12.8
6.99 14
6.96 16

C/S No. 7 @Ch.614 630 m


-0.15 10.15 0.84
0.32 9.68 2.6
0.42 9.58 4.2
1.92 8.08 6
2.89 7.11 7.1
2.89 7.11 7.1
2.89 7.11 7.1
2.89 7.11 7.55
2.89 7.11 7.55
2.89 7.11 7.55
2.89 7.11 7.55
2.92 7.08 8
2.94 7.06 10
7.04 12
7.02 12.8
7.01 14
7.01 16

C/S No. 8 @Ch.614 650 m


-0.19 10.19 0.84
0.27 9.73 2.6
0.29 9.71 4.5
1.44 8.56 6
2.25 7.75 7.2
2.90 7.1 8.2
2.90 7.1 8.2
2.90 7.1 8.2
2.90 7.1 8.65
2.90 7.1 8.65

LC 440 UP Initial
BS IS FS HC RL Remarks

2.90 7.1 8.65


2.90 7.1 8.65
2.92 7.08 10
7.05 12.2
7.04 13.5
7.03 14
7.03 16

C/S No. 9 @Ch.614 670 m


-0.18 10.18 0.84
0.31 9.69 2.6
0.36 9.64 4.5
1.32 8.68 6
2.11 7.89 7.2
2.76 7.24 8.15
2.76 7.24 8.15
2.76 7.24 8.15
2.76 7.24 8.6
2.76 7.24 8.6
2.76 7.24 8.6
2.76 7.24 8.6
2.80 7.2 10
7.16 12.5
7.15 13.5
7.14 14
7.12 16

C/S No. 10 @Ch.614 690 m


-0.16 10.16 0.84
0.19 9.81 2.6
0.26 9.74 4
1.82 8.18 6
2.80 7.2 7
2.80 7.2 7
2.80 7.2 7
2.80 7.2 7.45
2.80 7.2 7.45
2.80 7.2 7.45
2.80 7.2 7.45
2.85 7.15 10
2.87 7.13 11
7.12 12
7.11 13
7.1 14
7.08 16

C/S No. 11 @Ch.614 710 m

LC 440 UP Initial
BS IS FS HC RL Remarks

-0.14 10.14 0.84


0.22 9.78 2.6
0.27 9.73 4
1.92 8.08 6
2.77 7.23 7
2.77 7.23 7
2.77 7.23 7
2.77 7.23 7.45
2.77 7.23 7.45
2.77 7.23 7.45
2.77 7.23 7.45
2.81 7.19 10
2.83 7.17 12
7.16 13.3
7.15 14
7.12 16
16

C/S No. 12 @Ch.614 730 m


-0.11 10.11 0.84
0.15 9.85 2.6
0.18 9.82 3.6
2.04 7.96 6
2.78 7.22 6.9
2.78 7.22 6.9
2.78 7.22 6.9
2.78 7.22 7.35
2.78 7.22 7.35
2.78 7.22 7.35
2.78 7.22 7.35
2.81 7.19 10
2.83 7.17 11
7.15 12
7.12 14
7.12 16
16

C/S No. 13 @Ch.614 750 m


-0.13 10.13 0.84
0.16 9.84 2.6
0.19 9.81 3.2
1.66 8.34 6
2.21 7.79 7
2.75 7.25 8
2.75 7.25 8
2.75 7.25 8
2.75 7.25 8.45
2.75 7.25 8.45
2.75 7.25 8.45
2.75 7.25 8.45

LC 440 UP Initial
BS IS FS HC RL Remarks

2.77 7.23 10
7.21 12
7.19 12.5
7.16 14
7.14 16

C/S No. 14 @Ch.614 770 m


-0.15 10.15 0.84
0.13 9.87 2.6
0.16 9.84 3.4
1.66 8.34 6
2.26 7.74 7
2.80 7.2 7.9
2.80 7.2 7.9
2.80 7.2 7.9
2.80 7.2 8.35
2.80 7.2 8.35
2.80 7.2 8.35
2.80 7.2 8.35
2.83 7.17 10
7.13 12.4
7.11 13.5
7.1 14
7.08 16

C/S No. 15 @Ch.614 790 m


-0.17 10.17 0.84
0.12 9.88 2.6
0.15 9.85 3.5
1.66 8.34 6
2.21 7.79 7
2.63 7.37 7.8
2.63 7.37 7.8
2.63 7.37 7.8
2.63 7.37 8.25
2.63 7.37 8.25
2.63 7.37 8.25
2.63 7.37 8.25
2.65 7.35 10
7.32 12
7.31 12.8
7.3 14
7.28 16

C/S No. 16 @Ch.614 810 m


-0.17 10.17 0.84
0.31 9.69 2.6

LC 440 UP Initial
BS IS FS HC RL Remarks

0.35 9.65 3.5


2.09 7.91 6
2.09 7.91 6
2.64 7.36 6.8
2.64 7.36 6.8
2.64 7.36 6.8
2.64 7.36 7.25
2.64 7.36 7.25
2.64 7.36 7.25
2.64 7.36 7.25
2.67 7.33 10
7.3 12
7.29 13.2
7.28 14
7.26 16

C/S No. 17 @Ch.614 830 m


-0.14 10.14 0.84
0.20 9.8 2.6
0.25 9.75 3.5
1.64 8.36 6
2.11 7.89 7
2.54 7.46 8
2.54 7.46 8
2.54 7.46 8
2.54 7.46 8.45
2.54 7.46 8.45
2.54 7.46 8.45
2.54 7.46 8.45
2.56 7.44 10
7.41 12
7.38 13.5
7.37 14
7.34 16

C/S No. 18 @Ch.614 850 m


-0.13 10.13 0.84
0.22 9.78 2.6
0.25 9.75 3.5
1.83 8.17 6
2.40 7.6 6.9
2.40 7.6 6.9
2.40 7.6 6.9
2.40 7.6 7.35
2.40 7.6 7.35
2.40 7.6 7.35
2.40 7.6 7.35
2.44 7.56 10
2.45 7.55 11.2
7.54 12

LC 440 UP Initial
BS IS FS HC RL Remarks

7.53 12.3
7.5 14
7.46 16

C/S No. 19 @Ch.614 870 m


-0.13 10.13 0.84
0.25 9.75 2.6
0.29 9.71 3.5
1.77 8.23 6
2.38 7.62 7
2.38 7.62 7
2.38 7.62 7
2.38 7.62 7.45
2.38 7.62 7.45
2.38 7.62 7.45
2.38 7.62 7.45
2.44 7.56 10
2.48 7.52 12
7.51 13.3
7.48 14
7.45 16
16

C/S No. 20 @Ch.614 890 m


-0.11 10.11 0.84
0.33 9.67 2.6
0.37 9.63 3.5
1.88 8.12 6
2.36 7.64 6.9
2.36 7.64 6.9
2.36 7.64 6.9
2.36 7.64 7.35
2.36 7.64 7.35
2.36 7.64 7.35
2.36 7.64 7.35
2.40 7.6 10
2.43 7.57 11.5
7.56 12
7.53 12.5
7.54 14
7.52 16

C/S No. 21 @Ch.614 910 m


-0.14 10.14 0.84
0.42 9.58 2.6
0.45 9.55 3.5
1.73 8.27 6

LC 440 UP Initial
BS IS FS HC RL Remarks

2.12 7.88 6.8


2.12 7.88 6.8
2.12 7.88 6.8
2.12 7.88 7.25
2.12 7.88 7.25
2.12 7.88 7.25
2.12 7.88 7.25
2.16 7.84 10
2.20 7.8 12
7.79 12.7
7.78 14
7.76 16
16

C/S No. 22 @Ch.614 930 m


-0.18 10.18 0.84
0.32 9.68 2.6
0.36 9.64 3.2
1.68 8.32 6
2.17 7.83 7.1
2.17 7.83 7.1
2.17 7.83 7.1
2.17 7.83 7.55
2.17 7.83 7.55
2.17 7.83 7.55
2.17 7.83 7.55
2.22 7.78 10
2.24 7.76 12
7.74 12.6
7.72 14
7.69 16
16

C/S No. 23 @Ch.614 950 m


-0.20 10.2 0.84
0.38 9.62 2.6
0.42 9.58 3.2
1.75 8.25 6
2.18 7.82 7
2.18 7.82 7
2.18 7.82 7
2.18 7.82 7.45
2.18 7.82 7.45
2.18 7.82 7.45
2.18 7.82 7.45
2.23 7.77 10
2.25 7.75 12
7.74 12.7
7.71 14
7.68 16

LC 440 UP Initial
BS IS FS HC RL Remarks

16

C/S No. 24 @Ch.614 970 m


-0.19 10.19 0.84
0.48 9.52 2.6
0.52 9.48 4.5
1.25 8.75 6
1.81 8.19 7.3
2.23 7.77 8.3
2.23 7.77 8.3
2.23 7.77 8.3
2.23 7.77 8.75
2.23 7.77 8.75
2.23 7.77 8.75
2.23 7.77 8.75
2.25 7.75 10
7.72 12
7.7 13
7.68 14
7.64 16

C/S No. 25 @Ch.614 990 m


-0.19 10.19 0.84
0.48 9.52 2.6
0.52 9.48 4.5
1.24 8.76 6
1.82 8.18 7.3
2.23 7.77 8.3
2.23 7.77 8.3
2.23 7.77 8.3
2.23 7.77 8.75
2.23 7.77 8.75
2.23 7.77 8.75
2.23 7.77 8.75
2.25 7.75 10
7.72 12
7.7 13
7.68 14
7.64 16

LC 440 UP Initial
Chinnayyapalem Bank Protection Wall ( Dn LINE )

Sl No Chainage Area Avg Area Inter Quantity


Distance
10 18.274

2 50 17.703 17.9885 50 899.425

3 100 18.68 18.1915 50 909.575

4 150 18.374 18.527 50 926.350

5 200 18.992 18.683 50 934.150

6 250 18.754 18.873 50 943.650

7 300 18.275 18.5145 50 925.725

8 350 18.618 18.4465 50 922.325

9 400 18.744 18.681 50 934.050

10 450 20.008 19.376 50 968.800

11 500 18.92 19.464 50 973.200

9337.250