You are on page 1of 4
AYED EID AL OSAIMI ENGINEERING CONSULTING OFFICE anfane ‘SUMMARY OF TEST RESULTS lien ts. NEW HORIZONS COMPANY (Nt) Project tame Sataniya Water Diposal System Refurbishment (SDS) lctents sample No. :g ‘Lab Ret. No 0sn-20235 [source Location: AZM Lab Project. 20031 [sample Descripion CLEAN SAND Date Sara Facaves 2280920 [SempingMetos = ASTM D519 Dele Test Stated 2380920 lsamale size ASTM C702M-11(Resuced Ses) Date Test Competed 24-8ep20 [sanpledby HAIDER (CTTA #1021) Dato Reported + 2480920 Date ot Samping :22.Sap20 Tested by ‘eer FIN, ENPRHCCIL3 crtat ones Test tem Method Test Results [sieve Anais ASTC 13654 Encosed [suis Linas asta 0 si6-7e1 | oud NotB» Determined Jriastctyindex ASTD 4916-701 Nen-latc |vrimum index Density (Kain) ASTD 4254-10 1705 Jwaximum index Density (Kgim’) ASTD 4255-16 2040 [Method Variavon Remarks SocimentNe, Revianne, tecte Oxte_Pagesequence yeti Onin Energon ce rece oe ‘earims | are AYED EID AL OSAIM ENGINEERING CONSULTING OFFICE andar SIEVE ANALYSIS FOR SOILS cient

You might also like