Project: ALPAMINA

between:
Cal del Centro SAC, Lima, Peru
&
MAERZ Ofenbau AG, Zürich, Switzerland

3 x 400 tpd Natural Gas and LPG fired


Maerz Parallel Flow Regenerative (PFR) Lime Shaft Kilns

TIME SCHEDULE
valid for Kiln#1, #2 & #3

Document Number: AK700.760.00


Rev.B

February 22, 2012

Drawn Checked Approved

Name SB Si SB

Date 2011-11-28 2011-11-28 2011-11-28

Cal del Centro - Alpamina


Peru

TIME SCHEDULE
valid for Kiln#1, #2 & #3
B 2012-02-22 SB update of indication of months
A 2011-12-08 SB including all 3 kilns
0 2011-11-28 SB Preliminary version Size Document Number Page Rev.
Rev. Date Name Description A4 AK700.760.00 1 B
MAERZ Ofenbau AG AK700.760.00_B_Time Schedule Attachment.xlsx

Time Schedule for Kiln#1, #2 & #3


Month #0 #1 #2 #3 #4 #5 #6 #7 #8 #9 #10 #11 #12 #13 #14 #15 #16 #17 #18 #19 #20 #21 #22 #23 #24
December January February March April May June July August September October November December January February March April May June July August September October November

Activity Design Fabrication Delivery Erection Commissioning Milestone Done


#1 #2 #3 #1 #2 #3 #1 #2 #3 #1 #2 #3

Dec. 31, 2012 July 01, 2013 August 31, 2013


Cal del Centro timeline Dec. 31, 2011 Aug. 01, 2012
LPG available LNG available

DONE
Letter of Award
signature and downpayment
CdC

Coming into Force of the Contract erection site ready for pre-
assembly of steel structure kiln foundation ready for
erection of steel structure
Layout / Equipment Specification layout approval by client supply of basic engineering to compressor house and MCC
client room

Civil works / kiln foundation and


buildings #1
#2
#3

Steel structure
#1

partial FOB
#2

#3

FOB

Electrical Cabinets #1
#2
#3

Field Instruments and Cabling #1


#2 installation of grounding cables
#3
FOB

Refractory lining #1
#2
#3
FOB

Air compressors #1
#2
#3
FOB

Hydraulic system #1
#2
#3
FOB

Limestone Infeed #1
#2
#3
FOB

Waste gas filter #1


#2
#3
FOB

Waste gas duct work #1


#2
#3
FOB

Firing system (Racks) #1


#2
#3

Thermal Insuation #1
#2
#3

Cold Test #1
#2
#3

Start up of the Kiln #1


- LPG must be available - #2
#3

Normal operation #1
- LNG available - #2
#3

Performance test #1
#2
#3