You are on page 1of 1

CASE STUDY FLYER

FUGRO
GEOCONSULTING
MAMMOET – CRANE LOCATION DE-RISKING, DUBAI EYE PROJECT, BLUEWATERS ISLAND, U.A.E

A stability study was done to assess rigging ■ Review of site condition and project
feasibility for Mammoet Circular Crane requirements.
(3,200Tons) to support assembly of a 210 ■ Effective site characterization with CPT
meter Ferry Wheel. The project involved data acquisition.
several challenges including the size and ■ Ground modeling including revetment
requirement of the crane proposed for condition assessment.
rigging, the proximity of reclamation edge ■ Use of Finite Element modeling to verify
near the revetment due to mobilisation from stability of the leg support and crane
the sea. loadspreaders.
■ Check on safety factor and effect on the
PROJECT INFORMATION revetment and recommendation.
Bluewaters Island, Dubai, UAE
Mammoet Fig. 2. Ring Crane 3,200 Tons
Fugro (U.A.E)
2015

SERVICES PROVIDED
© FUGRO 01 2016 / FSME-GEOCONSULTING

Fugro provided following support which


assisted the safe deployment of the crane:

Fig. 1. Site Location


Fig. 4. Leg Support Structure

Fig. 3. 2D Axisymmetric FEM Modelling