You are on page 1of 5

BUDAPEST UNIVERSITY OF TECHNOLOGY AND

ECONOMICS
Department pf civil engineering

Building Construction Methodology

Name: Khan Muhammad Usama


Neptun: XYUQ3Y
Course: BCM
Professor: Halasz Gyorgy
Date: 12.09.2022
A

60x60 60x60
pre-fabricated pre-fabricated
columns columns

0.33
A
Reinforced
Concrete girder

7.50
B

20.57
500
300

7.50
Pre-stressed
60x60 pre-
T-beam
60x60 fabricated
Column
pre-fabricated

30.96
columns

30.0
C

3.10

7.50
500
300
90 200
200 240
D

6.15
B 3.00 B

10.6
1.40

9.43
7.50
Reinforced
1.20 Concrete girder 1.20
+2.00

1.30
3.00

3.00
E

0.33
60x60 60x60
pre-fabricated 60x60 pre-fabricated
columns pre-fabricated columns
1 2 3 columns 4 5 6 7

7.0 7.0 7.0 7.0 7.0 7.0 A

0.33 42.0 0.33

Khan Muhammad Usama XYUQ3Y

Supervisors: Dr. gyorgy halasz Scale S 1:200

Building Construction mecthodology/ Floor Plan 12/09/2022


+13.60 R4 R1

20cm Fiber RC Slab with hard finish


3% 3% 2Layer PE membrane sliding foil
15cm XPS Thermal insulation
1Layer Drainage board
+12.00 25cm Compacted gravel
Load-bearing soil

R2

1.4cm Ceramic tile


0.6cm Cement mortar glue
+8.90 6cm Cement Screed
1Layer technological foil
+8.00 2cm Sound Insulation
20cm Hollow core slab

+6.00
R3
C profiles supporting
R2 Trapezoidal sheet vertical
windows inside
+4.90 sandwich panel
15cm thermal insulation mineral fibre
Casette profile 0.6m long
Structural piller
+4.00

R4

Trapezoidal sheet
R3

3.00 +2.00 Filtration membrane


20 cm mineral thermal insulation between purlins
Vapour Barrier
R1 Bottom trapeziodal sheet
T Beam

+0.00

-3.20

0.60 14.40 0.60 14.40 0.60

Khan Muhammad Usama XYUQ3Y

Supervisors: Dr. gyorgy halasz Scale S 1:200

Building Construction methodology/ Section A-A 12/09/2022


+13.60

+11.00
Reinforced Concrete
girder

+8.90

+8.00

+6.00

+4.00

+2.00
3.00

+0.00

+3.20

7.0 7.0 7.0 7.0 7.0 7.0


42.00

Khan Muhammad Usama XYUQ3Y

Supervisors: Dr. gyorgy halasz Scale S 1:200

Building construction methodology B-B 12/09/2022


{3D}
1

Submitted to: Halasz


Gyorgy
3D VIEW
Project number BCM
Date 15-10-2022
Drawn by Khan Muhammad Usama
Checked by Halasz Gyorgy

BUILDING II