Professional Documents
Culture Documents
Tba04 e
Tba04 e
COMPANY PT. WSM HOLE_ID TBA04-E DATE_STARTED 18 April 2022 EASTING (X)
SITE BOENAGA RIG_NO 2 DATE_FINISHED NORTHING (Y)
WELLSITE Hasrul DRILLER Asep END OF HOLE ELEVATION
0.00 0.45 0.45 0.45 100% OVBN MGR LOW HIGH BRN TBA04-E/0,00-0,45M/1OVBN
0.45 1.00 0.55 0.65 100% SAPR MGR MED HIGH GRN YEL BRN SER MGN TBA04-E/0,45-1,00M/1SAPR
1.00 2.00 1.00 1.00 100% SAPR MGR HIGH HIGH GRN YEL BRN SER OLV MGN TBA04-E/1,00-2,00M/1SAPR
2.00 3.00 1.00 1.00 100% SAPR MGR HIGH HIGH GRN YEL GRY SER OLV MGN TBA04-E/2,00-3,00M/1SAPR
3.00 4.00 1.00 1.00 100% SAPR MGR HIGH YEL GRN GRY SER OLV SIL TBA04-E/3,00-4,00M/1SAPR
SAMPLE LIST
COMPANY PT. WSM HOLE_ID TBA04-E
SITE BOENAGA TOTAL_SAMPLE 19
TERKIRIM
DEPTH (M)
NO HOLE ID SAMPLE ID TOTAL SACK
FROM TO
1 TBA04-E/0,00-0,45M/1OVBN 0.00 0.45
2 TBA04-E/0,45-1,00M/1SAPR 0.45 1.00
3 TBA04-E/1,00-2,00M/1SAPR 1.00 2.00
4 TBA04-E/2,00-3,00M/1SAPR 2.00 3.00
5 TBA04-E/3,00-4,00M/1SAPR 3.00 4.00
TBA04-E
TOTAL KESELURUHAN 0 0
DRILL RECOVERY
Hole No. TBA04-F Start (dd/mm/yy) 18 April 2022
Deposite Boenaga Complete (dd/mm/yy)
Drill Rig NST
Depth (m) Run Swelling Loss Act. Core Core Recovery Layer
Remark
From To (m) (m) (m) (m) By Run By Meter Geology General
0.00 0.45 0.45 0.45 0.5 0.5 OVBN
0.45 1.00 0.55 0.1 0.65 0.6 0.7 SAPR
1.00 2.00 1.00 1.00 1.0 1.0 SAPR
2.00 3.00 1.00 1.00 1.0 1.0 SAPR
3.00 4.00 1.00 1.00 1.0 1.0 SAPR
Total Depth :
Driller : Asep
Field Geo : Hasrul Jamaluddin
Owner Admin :