RDD-PQP-6151-124-F/56 Rev.

CALIFORNIA BEARING RATIO


BS 1377:Part 4 : 1990 ( Method 7 )
Project Title : Construction of Recharge Dams At Wadi Al Sederiyeen, Wilayat Yankul and Wadi suroor, Wilayat Dhank,
AD-DHAHIRAH Governorate
Contract / Job No
Client : Ministry of Agricultural Fisheries Wealth & Water resources
Consultant : Atlas International Engineering Consultants
Location RFI No.
Description of sample
Sample Description :
Source : Date of Casting :
Location : Date of Testing :

Density Determination
Before Soaking After Soaking Swell :
Mould No. Mould No.
Weight of Mould+Soil(g) Initial height of specimen (mm)
Weight of Mould (g) Initial dial gauge reading (mm)
Weight of Soil (g) Final dial gauge reading (mm)
Volume of Mould (cc) Percentage swell (%)
Wet Density (g/cc)
Container No.
Weight of Container+Wet Soil (g)
Weight of Container+Dry Soil (g)
Weight of Container (g)
Weight of Water (g)
Weight of Dry Soil (g)
Moisture Content (%)
Dry Density of Soil (g/cc)

Load Vs Penetration Data


Mould No.
Force gauge Force 0n
Penetration Of reading(div) plunger(KN)
Plunger (mm)
Top Bottom Top Bottom Top Bottom
0.00
0.25
0.50 MDD Mg/m3
0.75 OMC %
1.00 Proving Ring
Factor Constant
kN/Div
1.25
1.50 Area of Plunger mm2
.1.75
2.00
2.25
2.50
2.75
Corrected Corrected
3.00 CBR at CBR at
From Graph 2.50 mm 5.00 mm
3.25
penetration penetration
3.50
3.75
TOP 0 0
4.00
4.25
BOTTOM 0 0
4.50
4.75
5.00
5.25
5.50
CBR Value @ Comp.
5.75
6.00
6.25
5.50
6.75
7.00
7.25
7.50
Remarks:

CONTRACTOR CONSULTANT'S REPRESENTATIVE

Material Engineer Material Engineer


RDD-PQP-6151-124-F/56 Rev.0

EVALUATION OF CBR CURVE


BS 1377:Part 4 : 1990 ( Method 7 )

Project Title : Construction of Recharge Dams At Wadi Al Sederiyeen, Wilayat Yankul and Wadi suroor, Wilayat Dhank,
AD-DHAHIRAH Governorate
Contract / Job No
Client : Ministry of Agricultural Fisheries Wealth & Water resources
Consultant : Atlas International Engineering Consultants
Location
Description of sample
Description of sample
Sample Description :
Source : Date of Casting :
Location : Date of Testing :

Load Vs Penetration TOP


20.0

18.0

16.0

14.0

12.0
Load (Kn)

10.0

8.0

6.0

4.0

2.0

0.0
0 1 2 3 4 5 6 7 8

Penetration (mm)

Load Vs Penetration BOTTOM

20.0

18.0

16.0

14.0

12.0
Load (Kn)

10.0

8.0

6.0

4.0

2.0

0.0
0 1 2 3 4 5 6 7 8

Penetration (mm)
.

Remarks:

CONTRACTOR CONSULTANT

Material Engineer Material Engineer


RDD-PQP-6151-124-F/56 Rev.0

CALIFORNIA BEARING RATIO

BS 1377:Part 4 : 1990 ( Method 7 )

Project Title : Construction of Recharge Dams At Wadi Al Sederiyeen, Wilayat Yankul and Wadi suroor, Wilayat Dhank, AD-
DHAHIRAH Governorate
Contract / Job No : 62/2019- 10P6167
Client : Ministry of Agricultural Fisheries Wealth & Water resources
Consultant : Atlas International Engineering Consultants
Location : Stock Pile No.2 RFI No.
Description of sample : Sederiyeen GF material
Sample Description : Sample -01
Source : Borrow Material from site Date of Casting : 09.03.2022
Location : Wadi Al Sederiyeen Date of Testing : 13.03.2022

Density Determination
After Soaking Swell :
Mould No. 1 1 Mould No. 1
Weight of Mould+Soil(g) 11138 11182 Initial height of specimen (mm) 127
Weight of Mould (g) 5492 5492 Initial dial gauge reading (mm) 0.05
Weight of Soil (g) 5646 5690 Final dial gauge reading (mm) 0.05
Volume of Mould (cc) 2305 2305 Percentage swell (%) 0.0394
Wet Density (g/cc) 2.449 2.469
Container No. 11 12
Weight of Container+Wet Soil (g) 765.4 871.2
Weight of Container+Dry Soil (g) 733.1
Weight of Container (g) 108.3 102.5
Weight of Water (g) 32.3
Weight of Dry Soil (g) 624.8
Moisture Content (%) 5.2
Dry Density of Soil (g/cc) 2.323

Load Vs Penetration Data


Mould No. 0.11
Force gauge Force 0n
Penetration Of 0.11421 0.012
reading(div) plunger(KN)
Plunger (mm)
Top Bottom Top Bottom Top Bottom
0.00 0 0 0.00 0.00
0.25 4 1 0.88 0.22
0.50 7 4 1.55 0.88 MDD 2.322 Mg/m3
0.75 12 8 2.65 1.77 OMC 5.2 %
1.00 15 12 3.32 2.65 Proving Ring
Factor 0.22107 kN/Div
1.25 20 16 4.42 3.54 Constant
1.50 23 22 5.08 4.86 Area of Plunger 1935 mm2
1.75 26 28 5.75 6.19
2.00 32 33 7.07 7.30
2.25 36 38 7.96 8.40
2.50 40 44 8.84 9.73 66.99 73.69
2.75 44 50 9.73 11.05 Corrected Corrected
3.00 49 55 10.83 12.16 CBR at CBR at
From Graph
3.25 53 62 11.72 13.71 2.50 mm 5.00 mm
3.50 57 68 12.60 15.03 penetration penetration
3.75 61 73 13.49 16.14
TOP 67 90
4.00 65 81 14.37 17.91
4.25 68 86 15.03 19.01
BOTTOM 74 114
4.50 72 91 15.92 20.12
4.75 76 97 16.80 21.44
5.00 81 103 17.91 22.77 89.53 113.85
5.25 84 110 18.57 24.32
5.50 87 115 19.23 25.42
CBR Value @ Comp.
5.75 90 121 19.90 26.75
6.00 94 127 20.78 28.08
6.25 98 132 21.66 29.18
6.50 101 139 22.33 30.73
6.75 104 145 22.99 32.06
7.00 108 149 23.88 32.94
7.25 110 155 24.32 34.27
7.50 114 160 25.20 35.37
Remarks:

CONTRACTOR CONSULTANT'S REPRESENTATIVE

Material Engineer Material Engineer


RDD-PQP-6151-124-F/56 Rev.0

EVALUATION OF CBR CURVE

BS 1377:Part 4 : 1990 ( Method 7 )

Project Title : Construction of Recharge Dams At Wadi Al Sederiyeen, Wilayat Yankul and Wadi suroor, Wilayat Dhank, AD-
DHAHIRAH Governorate
Contract / Job No
Client : Ministry of Agricultural Fisheries Wealth & Water resources
Consultant : Atlas International Engineering Consultants
Location
Description of sample
Description of sample
Sample Description :
Source : Date of Casting :
Location : Date of Testing :

Load Vs Penetration TOP


40.0
38.0
36.0
34.0
32.0
30.0
28.0
26.0
24.0
Load (Kn)

22.0
20.0
18.0
16.0
14.0
12.0
10.0
8.0
6.0
4.0
2.0
0.0
0 1 2 3 4 5 6 7 8

Penetration (mm)

Load Vs Penetration TOP


40.0
38.0
36.0
34.0
32.0
30.0
28.0
26.0
24.0
Load (Kn)

22.0
20.0
18.0
16.0
14.0
12.0
10.0
8.0
6.0
4.0
2.0
0.0
0 1 2 3 4 5 6 7 8

Penetration (mm)

Remarks:

CONTRACTOR CONSULTANT

Material Engineer Material Engineer


0 0
5 21.670 21.670 230.7337
10 46.000 24.330 205.5076
15 68.000 22.000 227.2727
20 91.670 23.670 211.2379
25 113.330 21.660 230.8403
30 136.330 23.000 217.3913
35 158.000 21.670 230.7337
40 182.330 24.330 205.5076
45 203.330 21.000 238.0952
50 226.330 23.000 217.3913
221.4711

0.221471
0.015842

15.87606
Force gauge Force 0n
reading(div) plunger(KN)
Penetration 40.00
Of Plunger
(mm)
Top Bottom Top Bottom Top Bottom
35.00
0.00 0 0 0.00 0.00
0.25 4 1 0.88 0.22
30.00
0.50 7 4 1.55 0.88
0.75 12 8 2.65 1.77
1.00 15 12 3.32 2.65
25.00
1.25 20 16 4.42 3.54
1.50 23 22 5.08 4.86 20.00
1.75 26 28 5.75 6.19
2.00 32 33 7.07 7.29
15.00
2.25 36 38 7.96 8.40
2.50 40 44 8.84 9.72 68.00 74.80
2.75 44 50 9.72 11.05
10.00
3.00 49 55 10.83 12.16
3.25 53 62 11.71 13.70 5.00
3.50 57 68 12.60 15.03
3.75 61 73 13.48 16.13
0.00
4.00 65 81 14.37 17.90 0.00 1.00 2.00
4.25 68 86 15.03 19.01
4.50 72 91 15.91 20.11
4.75 76 97 16.80 21.44
5.00 81 103 17.90 22.76 89.51 113.82
5.25 84 110 18.56 24.31
5.50 87 115 19.23 25.42
5.75 90 121 19.89 26.74
6.00 94 127 20.77 28.07
6.25 98 132 21.66 29.17
6.50 101 139 22.32 30.72
6.75 104 145 22.98 32.05
7.00 108 149 23.87 32.93
7.25 110 155 24.31 34.26
7.50 114 160 25.19 35.36
0.00
Bottom
5.00

0.00

5.00

0.00 Column F
Column G

5.00

74.80
0.00

5.00

0.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

113.82