Client Bayer

Project Building 36 Renovation


Location West Haven, CT
Project# 97182.00
NJ Office, Belle Mead, NJ Proj.Area Penthouse
HVAC Engineering Dept. Form By: P. Bucklen, P.E. 17-Mar-98
Check By:M. Butler 17-Mar-98
Determine Expansion Tank Size: Calc.By: P. Bucklen, P.E. 17-Mar-98
Rev. By:
Application: Hot Water System 2
3
Known Piping Quantities

Location Pipe SizeLinear Feet Material Gallons of Equipment Quantity Gallons /Total Gallons of
(Inches) Water Unit Water
Penthouse and 1st Floor 0.75 502 Type L 13 HX-1 1 20 20
1 214 Type L 9 RHC's 25 2 50
1.25 195 Type L 13 P-1-1 1 2 2
1.5 523 Type L 48 P-1-2 1 2 2
2 76 Type L 12 UH-1-1 1 5 5
2.5 0 Schedule 40 0 UH-1-2 1 5 5
3 139 Schedule 40 53 UH-1-3 1 5 5
4 Schedule 40 0 UH-1-4 1 2 2
6 Schedule 40 0 AS-1-1 1 10 10
8 Schedule 40 0 CF-1-1 1 5 5
10 Schedule 40 0
12 SW (.375" Wall) 0
14 SW (.375" Wall) 0
16 SW (.375" Wall) 0
18 SW (.375" Wall) 0
20 SW (.375" Wall) 0
24 SW (.375" Wall) 0
TOTAL 148 TOTAL 106

Volume of Water in Syste 254 gallons


Lower Temperature, T1 50 Deg. F
Higher Temperature, T2 180 Deg. F
Atomspheric Pressure, Pa 14.70 psia
Abs. Pressure @ T1, P1 24.70 psia, Lower Pressure
Abs. Pressure @ T2, P2 59.38 psia, Higher Pressure
Specific Volume of Water 0.16020 Cu. Ft. / lb
Specific Volume of Water 0.16510 Cu. Ft. / lb
Linear Coefficient of Exp ### In / in Deg F for steel
Delta T (T2-T1) 130 Deg. F
Volume of Expansion Ta 20.53 gallons

EXPANSION TANK SCHEDULE

CLOSED EXPANSION TANK (FURNISHED AND INSTALLED BY CONTRACTOR)


EQUIP. LOCATIONMANUF./ TYPE CAPACITYSERVICEOPER. WT. REMARKS/NOTES
NUMBER MODEL No. (GAL) (LBS.)

ET-1 PENTHOUSEB&G/30NON-DIAPHRAGM 25 HOT WATER 75 Provide Airtrol Fitting, ATF-12