Project: Lite - On New Factory Phase 1 RFI No./ s6 PYC : RFI/LOVN/PHASE 1/ .... . .... ../. ....
- -
Dv an : Nha may Lite - On giai do<1n 1 Received By/ Ngllcri nh~n:
- -
r
2 T2 23.815 5 1 168 1,042.80
3 T3 23.815 5 1 168 1,042.80
---- - --- - --
4 T4 23.815 5 1 167 1,042.80
--- -- - - - - -- - ---
T direction/ Hl!&ng theo trvc Y
- -
-- - --- - -
1
-- -----
T5
-- - -
9.115 3
-
1
-
68 625.68 66 ' -
2 T6 9.115 5 1 69 1,042.80
- - - -- - -
3
-
Tl 9.115 5 1 69 1,042.80
-
4
- -
TB -
9.115 5 1 69 1,042.80
5 T9 9.115 5 1 69 1,042.80
-
6 T10 9.115 5 1 69 1,042.80
7
B
T11
T12
9.115
9.115
5
5
1
1
69
69
1,042.80
1,042.80
"
9 T13 9.115 5 1 69 1,042.80
10 T14 9.115 5 1 69 1,042.80
11 T15 9.11 5 5 1 69 1,042.80
12 T1 6 9.115 5 1 69 1,042.80
13 T1 7 9.11 5 5 1 69 1,04 2.80
14 T18 13.215 5 1 98 1,042.80
15 T1 9 13.215 5 1 98 1,042.80
16 T20 13.215 5 1 98 1,042.80 ~4- -
UVCO/ITP/ELONGATION
Theory
Effective Length/ Number of Number of Stressing
Elongation/
No/ Ten don No. Chieu dai hitu st rand in Stressing force/ Lvc Mark/ Ghi
D(> gian daily
STT I Ten dw ng cap d1,m g tendon/ So End/So keo chu
thuyet
tao cap dau keo
(m) (mm) (kN)
Other comment (If any)IY ki~n khac cua cac ben (N~u c6): - - -
-- --- - - - --- - --
Nonconformance Report rai sed during Inspection/ re-I nspection Yes No NCR No. (N CR Sd):
(Bao cao san phAm khOng phu h()'P phat sinh khi nghi~m th ul nghi~m thu l~i)
D D
□ Approval/ 06ng y chuyen c6ng tac ti~p thee
No inspection/ Khong d6ng y chuyen c6ng tac tiep theo
□
Signature of Site Engineer Contra ctor VILA! VIET:
Full n ame In block letters: NGUYEN DUC HUU Date (Ngay). Time (Thai gian):
---
(Ho ten <1t.y <1u. ch/Jo hoa)
Full name In block letters : 1'11-" M VAN LI/C Date (Ngay). Time (TM , gian) ·
Full name In block letters : LA VAN QUANG Date /Ngay) Time (Thor g,an)
--
/Ho ten <1t.y <1u. chO' haa)