LITE(tJ~ I

LITE -ON NE W FACTOR Y PHASE I PROJ ECT


Dl/ .A.N NHA M.A. Y MO'I LIT E-ON GIAI DO~N I
:~P. ~, C~Tf,cA 7-,. ..,V \ '3t,) E '. ,..:;1i °h 1\ 0
,C •, \ S P :J-.1~ , \ G)Yf,•. ~.A: PhCr~ 3
V
VILAI VIET
LITE-ON VIET ~M VU I VI E T

TENDON THEORY ELONGATION CALCULATION

TiNH TOAN E>Q GIAN DAI LY THUYET

Project: Lite - On New Factory Phase 1 RFI No./ s6 PYC : RFI/LOVN/PHASE 1/ .... . .... ../. ....
- -
Dv an : Nha may Lite - On giai do<1n 1 Received By/ Ngllcri nh~n:
- -

Address: VISIP HAI PHONG IZ Item : Post tensioning system


-- -- --
Dia chi: Khu c6ng nghi~p VSIP - Ha i Phong H<1ng m1,1c: Th i c6ng h<i dam san DUL
- - - - -- - --
Date:. ... I ...... / 2019 Inspection positi on/ Vi tri:
- -- --- --- -- -- -
Ngay: ... I ..... I 2019 Floor/tan g: 3; Zone/ Phan khu: A6/ Asix/Tr1,1c: X7-X11/Y3-YB

CALCULATION/ NQI DUNG TINH TOAN


Theory
Effective Length/ Number of Number of Stressing
Elongation/
No l Tendon No. Chieu dai hi~u strand in Stressing force/ Lvc Mark/ Ghi
fJij gian dai ly
STT I Ten dwng cap d!lng tendon/ s6 End/S5 keo chu
thuyet
tao cap dau keo
(m) (mm) (kN)
Floor/ tang : Mai 2
- -
Zone/ Phan khu: A4
X direction/ Hl!&ng theo trvc X
1 T1 23.815 5 1 167 1,042.80

r
2 T2 23.815 5 1 168 1,042.80
3 T3 23.815 5 1 168 1,042.80
---- - --- - --
4 T4 23.815 5 1 167 1,042.80
--- -- - - - - -- - ---
T direction/ Hl!&ng theo trvc Y
- -
-- - --- - -
1
-- -----
T5
-- - -
9.115 3
-
1
-
68 625.68 66 ' -
2 T6 9.115 5 1 69 1,042.80
- - - -- - -
3
-
Tl 9.115 5 1 69 1,042.80
-
4
- -
TB -
9.115 5 1 69 1,042.80
5 T9 9.115 5 1 69 1,042.80
-
6 T10 9.115 5 1 69 1,042.80
7
B
T11
T12
9.115
9.115
5
5
1
1
69
69
1,042.80
1,042.80
"
9 T13 9.115 5 1 69 1,042.80
10 T14 9.115 5 1 69 1,042.80
11 T15 9.11 5 5 1 69 1,042.80
12 T1 6 9.115 5 1 69 1,042.80
13 T1 7 9.11 5 5 1 69 1,04 2.80
14 T18 13.215 5 1 98 1,042.80
15 T1 9 13.215 5 1 98 1,042.80
16 T20 13.215 5 1 98 1,042.80 ~4- -

17 T21 13.215 5 1 98 1,042.80


18 T22 13.215 5 1 98 1,042.80

UVCO/ITP/ELONGATION
Theory
Effective Length/ Number of Number of Stressing
Elongation/
No/ Ten don No. Chieu dai hitu st rand in Stressing force/ Lvc Mark/ Ghi
D(> gian daily
STT I Ten dw ng cap d1,m g tendon/ So End/So keo chu
thuyet
tao cap dau keo
(m) (mm) (kN)

19 T23 13.215 5 1 98 1,042.80


20 T24 13.215 5 1 98 1,042.80
~

21 T25 13.215 5 1 98 1,042.80


22
23
T26
T27
13.215 5 1 98 1,042.80
1,042.80
~t
13.2 15 5 1 98
- - -
24 T28 13.215 5 1 98 1,042.80
- -
25 T29 13.215 5 1 98 1,042.80
- -- -- - -
26 T30 9.115 3 1 68 625.68

Other comment (If any)IY ki~n khac cua cac ben (N~u c6): - - -

-- --- - - - --- - --

RESULT/ KET LUAN


Final Inspection (Ket qua nghi~m thu cu6i cung)
Revi ew of all record s Includ ing required test resutts (Kiem tra l~i IAI ca cac bien ban baa gOm cac ket qua th/ nghi~m thea yeu clu)

Nonconformance Report rai sed during Inspection/ re-I nspection Yes No NCR No. (N CR Sd):
(Bao cao san phAm khOng phu h()'P phat sinh khi nghi~m th ul nghi~m thu l~i)
D D
□ Approval/ 06ng y chuyen c6ng tac ti~p thee
No inspection/ Khong d6ng y chuyen c6ng tac tiep theo

Signature of Site Engineer Contra ctor VILA! VIET:

(Chv ky cua nhll thAu)

Full n ame In block letters: NGUYEN DUC HUU Date (Ngay). Time (Thai gian):
---
(Ho ten <1t.y <1u. ch/Jo hoa)

Signature of QC Engineer Contractor VILA! VIET:

(Ch(! ky clia nha th Au)

Full name In block letters : 1'11-" M VAN LI/C Date (Ngay). Time (TM , gian) ·

/Ho ten <1t.y <1u. chli' haa)

Signature of Site Supervisor Cllent - LITON - ON VIET NAM:

/Ch(! ky cua chu <1t.u tu)

Full name In block letters : LA VAN QUANG Date /Ngay) Time (Thor g,an)
--