- The document appears to be a bill or invoice listing materials, work, and costs associated with a construction project at Jomaira-villa36 between July 1-28.
- A wide range of materials and construction tasks are listed including cement, steel, tiles, plumbing, electrical work, plastering and more.
- The total amount due for the project over the 28 day period is 39524.95.
- The document appears to be a bill or invoice listing materials, work, and costs associated with a construction project at Jomaira-villa36 between July 1-28.
- A wide range of materials and construction tasks are listed including cement, steel, tiles, plumbing, electrical work, plastering and more.
- The total amount due for the project over the 28 day period is 39524.95.
- The document appears to be a bill or invoice listing materials, work, and costs associated with a construction project at Jomaira-villa36 between July 1-28.
- A wide range of materials and construction tasks are listed including cement, steel, tiles, plumbing, electrical work, plastering and more.
- The total amount due for the project over the 28 day period is 39524.95.
1-Jul-22 Gl binding wire,hand gloves,terraco maxi/ jomaira-villa36 115.5 1-Jul-22 cement/jomaira-villa36 160 1-Jul-22 fixing support bars on the swimming pool/jomaira-villa36 840 2-Jul-22 cement/jomaira-villa36 3300 2-Jul-22 material building / jomaira-villa36 100 2-Jul-22 masking tape/jomaira-villa36 12.6 2-Jul-22 steel cutting disc/jomaira-villa36 31.5 2-Jul-22 plastic roll/jomaira-villa36 63 2-Jul-22 steel cutting disc/jomaira-villa36 22 2-Jul-22 repairing steel bars,making steel fundation /jomaira-villa36 720 3-Jul-22 material building / jomaira-villa36 100 3-Jul-22 material building / jomaira-villa36 100 3-Jul-22 balance wall bath and kitchen/jomaira-villa36 610 4-Jul-22 flat panel /jomaira-villa36 3680 4-Jul-22 tube/jomaira-villa36/jomaira-villa36 402 4-Jul-22 material building / jomaira-villa36 100 4-Jul-22 making swimming pool/jomaira-villa36 710 5-Jul-22 material building / jomaira-villa36 100 5-Jul-22 making fundation bar/jomaira-villa36 770 6-Jul-22 material building / jomaira-villa36 100 6-Jul-22 material building / jomaira-villa36 100 6-Jul-22 fixing fundation bars steel clock room/jomaira-villa36 690 7-Jul-22 material building / jomaira-villa36 100 7-Jul-22 electric pipe,pulling spring/jomaira-villa36 334 7-Jul-22 making electric work on kitchen/jomaira-villa36 690 8-Jul-22 material building / jomaira-villa36 100 8-Jul-22 fillering wall villa near pool/jomaira-villa36 470 8-Jul-22 material building / jomaira-villa36 100 8-Jul-22 repairing inlet pipe pool/jomaira-villa36 960 10-Jul-22 material building / jomaira-villa36 100 11-Jul-22 fixing fundation and beam clock house bar steel/jomaira-villa 550 12-Jul-22 steel nail black/ jomaira-villa36 17 12-Jul-22 black sand /jomaira-villa36 240 12-Jul-22 material building / jomaira-villa36 100 12-Jul-22 fillering wall villa near pool/jomaira-villa36 550 13-Jul-22 material building / jomaira-villa36 100 13-Jul-22 steel nail black/ jomaira-villa36 15.75 13-Jul-22 plastering on the med room/jomaira-villa36 370 14-Jul-22 material building / jomaira-villa36 100 14-Jul-22 fixing support in the pool steel/jomaira-villa36 280 15-Jul-22 material building / jomaira-villa36 100 15-Jul-22 fillering med room/jomaira-villa36 200 15-Jul-22 material building / jomaira-villa36 50 15-Jul-22 making mdf for the fundation/jomaira-villa36 370 16-Jul-22 material building / jomaira-villa36 283 16-Jul-22 gloves mixes/jomaira-villa36 52 16-Jul-22 material building / jomaira-villa36 300 16-Jul-22 fixing tile on the bath and kitchen/jomaira-villa36 190 17-Jul-22 fan cooling/jomaira-villa36 160.45 17-Jul-22 salina tile glue white/jomaira-villa36 72 18-Jul-22 fixing tile on the med room and kitchen/jomaira-villa36 300 18-Jul-22 man iiole cover/jomaira-villa36 719.25 18-Jul-22 material building / jomaira-villa36 100 18-Jul-22 steel 08 MM/jomaira-villa36 398 19-Jul-22 material building / jomaira-villa36 90 19-Jul-22 exention concrit/jomaira-villa36 2000 19-Jul-22 fixing over follow steel/jomaira-villa36 300 20-Jul-22 polycoat 16 LT /jomaira-villa36 70 20-Jul-22 compactor/jomaira-villa36 45 20-Jul-22 material building / jomaira-villa36 100 20-Jul-22 fixing lever for pool/jomaira-villa36 370 21-Jul-22 hollow block,solid block,mosaic tile/jomaira-villa36 421 21-Jul-22 black cement/jomaira-villa36 136.5 21-Jul-22 makimg epoxi on the fundation/jomaira-villa36 590 22-Jul-22 material building / jomaira-villa36 100 23-Jul-22 making conerite on the swimming pool/jomaira-villa36 690 23-Jul-22 material building / jomaira-villa36 100 23-Jul-22 swimming pool conerite/jomaira-villa36 2125 23-Jul-22 material building / jomaira-villa36 2600 24-Jul-22 making block to extention wall/jomaira-villa36 490 25-Jul-22 material building / jomaira-villa36 88 25-Jul-22 white sand,black sand/jomaira-villa36 3010 25-Jul-22 pvc/jomaira-villa36 20 25-Jul-22 material building / jomaira-villa36 100 25-Jul-22 making plaster on the water tank/jomaira-villa36 810 26-Jul-22 compactor/jomaira-villa36 45 26-Jul-22 upvc elbow,pipe/jomaira-villa36 61.95 26-Jul-22 hollow block,solid block,mosaic tile/jomaira-villa36 290 26-Jul-22 making platform on the pool/jomaira-villa36 450 26-Jul-22 charge pick up for cement block/jomaira-villa36 160 27-Jul-22 material building / jomaira-villa36 50 27-Jul-22 charge bus/jomaira-villa36 2870 28-Jul-22 material building / jomaira-villa36 19