This document contains a list of expenses from June 1-30 related to building and repair work. It includes expenses for materials from various shops as well as expenses for labour costs for tasks like fixing tiles, plastering walls, repairing steel bars, and more. The total expense for the period was 21862.76.
This document contains a list of expenses from June 1-30 related to building and repair work. It includes expenses for materials from various shops as well as expenses for labour costs for tasks like fixing tiles, plastering walls, repairing steel bars, and more. The total expense for the period was 21862.76.
This document contains a list of expenses from June 1-30 related to building and repair work. It includes expenses for materials from various shops as well as expenses for labour costs for tasks like fixing tiles, plastering walls, repairing steel bars, and more. The total expense for the period was 21862.76.
1-Jun-22 labour oil change and filter 31.5 1-Jun-22 fixing tile on the kitchen wall,fillering on the villa wall 400 1-Jun-22 material building/rta 100 2-Jun-22 material buildibg/ahmed marrah shop 149.1 2-Jun-22 fixing tile on the med room kitchen,making fillering on the villa wall 520 2-Jun-22 material building/rta 150 3-Jun-22 fixing floor tile kitchen,fillering villa wall outside 520 3-Jun-22 al fayez tile glue,ppr n elbow,ppr elbow,cotton rope/RGBMT 203.7 4-Jun-22 material building/rta 100 4-Jun-22 material building/rta 100 4-Jun-22 material building/rta 40 5-Jun-22 material building/al hamamah shop 713 6-Jun-22 fixing tile bedroom medroom,water proofing,fillering back side villa 520 6-Jun-22 kabias glass block brown misty cloudy /planet eco 24 6-Jun-22 material building/rta 100 6-Jun-22 jotun pva primer,gypsum powder,terracete water proof/RGBMT shop 264.6 7-Jun-22 making bathroom tile,making fillering on the villa wll 400 7-Jun-22 material building/ abu murrah shop 75 7-Jun-22 material building/rta 100 7-Jun-22 material building/ahmed marrah shop 26.77 8-Jun-22 fillering on the villa wall 400 8-Jun-22 material building/memko shop 12.6 8-Jun-22 material building/ahmed marrah shop 111.3 8-Jun-22 material building/boti sultan shop 42 8-Jun-22 material building/rta 100 14-Jun-22 fixing exhost filterroom ,head up with cement,repairing med room wall 480 14-Jun-22 material building/nuture beaty sanitary shop 57.75 15-Jun-22 material building/adwaa al wadi shop 91.35 15-Jun-22 , removing playwood house pool 480 15-Jun-22 material building/rta 100 15-Jun-22 material building/rta 100 16-Jun-22 material building/rta 100 17-Jun-22 removing soil +fixing table,cocrite the base 90 18-Jun-22 makimg play wood for med room 400 18-Jun-22 material building/rta 100 18-Jun-22 pw film faced,cutting charges plywood/al rahmani shop 359.01 18-Jun-22 binding wire 21g/al rahmani shop 31 18-Jun-22 material building/nuture beaty sanitary shop 16.8 19-Jun-22 making play wood for med room,opening housrpool foundation 600 19-Jun-22 wire nail/RGBMT shop 21 19-Jun-22 material building/rta 100 19-Jun-22 material building/nuture beaty sanitary shop 4.2 20-Jun-22 material building/siddique sohail shop 430 20-Jun-22 making formatting beam med room,making second steel bars filler room 560 20-Jun-22 material building/rta 100 20-Jun-22 HP socket2/RGBMT shop 37 20-Jun-22 steel 12m /jb shop 840 20-Jun-22 material building/al waha aluminium shop 700 21-Jun-22 material building/adwaa al wadi shop 42 21-Jun-22 making concrite on the mwd room ibeam,making steel bars filter room 680 21-Jun-22 black sand,cement/siddique shop 380 21-Jun-22 material building/rta 100 21-Jun-22 paint bucket 21 21-Jun-22 material building/rta 100 22-Jun-22 HP pipe 2 loose/RGBMT shop 19 22-Jun-22 putting concrite on th med room ibeam,making steel bars on filter room 680 22-Jun-22 material building/nuture beaty sanitary shop 27 23-Jun-22 fixing bars steel on the filter room,repairing extention steel12mm to H 290 23-Jun-22 material building/rta 100 23-Jun-22 gl binding wire 10kg/RGBMT shop 73.5 24-Jun-22 material building/rta 100 24-Jun-22 kabias glass block brown misty cloudy /planet eco 100 24-Jun-22 repairing bars steel swimming and filter room and water tank 290 24-Jun-22 al khidmah grocery 12 25-Jun-22 material building/nuture beaty sanitary shop 7.35 26-Jun-22 repairing steel bars swimming,plastering med room 930 26-Jun-22 material building/rta 100 26-Jun-22 gl wall angle,jotun stucco putty,steel cutting disc/sabaco shop 151.73 27-Jun-22 material building/rta 100 27-Jun-22 repairing bars T beam extention villa,fillering villa outside 560 27-Jun-22 material building/rta 100 27-Jun-22 steel 12m,cement/jb shop 1295 27-Jun-22 rubbish 875 27-Jun-22 material building/taxi pick up 160 27-Jun-22 material building/nuture beaty sanitary shop 10.5 28-Jun-22 repairing bars steel swimming and filter room and water tank 560 28-Jun-22 pvc gurmala/art shop 8.4 28-Jun-22 material building/ayas shop 70 28-Jun-22 material building/noor al mufaddal shop 15.75 29-Jun-22 material building/rta 100 29-Jun-22 plastering med room,fillering bathroom first floor 740 29-Jun-22 gypsum ,jotun stucco,wire nail/RGBMT shop 149.1 30-Jun-22 material building/nuture beaty sanitary shop 22.5 30-Jun-22 material building/rta 100 30-Jun-22 material building/noor al mufaddal shop 21 30-Jun-22 fixing swimming pool.fillering vilaa wall, plastering med room 1660 TOTAL: 21862.76