You are on page 1of 24

Sr No.

Month RFI NO PO NO

1 Jul-21 P11570-RFI-P-BIFP-PP14-109C-0060 P-BIFP-PP14-109C

2 Jul-21 P11570-RFI-P-BIFP-PP14-109C-0059 P-BIFP-PP14-109C

3 Jul-21 P11570-RFI-P-BIFP-PP14-109C-0058 P-BIFP-PP14-109C

4 Jul-21 P11570-RFI-P-BIFP-PP14-109C-0057 P-BIFP-PP14-109C

5 Jul-21 P11570-RFI-P-BIFP-PP14-109C-0056 P-BIFP-PP14-109C

6 Jul-21 P11570-RFI-P-BIFP-PP14-109C-0055 P-BIFP-PP14-109C

7 Jul-21 P11570-RFI-P-BIFP-PP14-109C-0054 P-BIFP-PP14-109C


8 Jul-21 P11570-RFI-CP-PP21(04)-0017 P-BIFP-PP21-116-04

9 Jul-21 P11570-RFI-CP-PP20(B)-0079 P-BIFP-PP20-115B

10 Jul-21 P11570-RFI-CP-PP16-0024 P-BIFP-PP16-111B

11 Jul-21 P11570-RFI-CP-PP12-0059 P-BIFP-PP12-044

12 Jul-21 P11570-RFI-CP-PP01(A)-0027.Rev.A P-BIFP-PP01-008A

13 Jul-21 P11570-RFI-CP-PP01(A)-0027 P-BIFP-PP01-008A

14 Jul-21 P11570-RFI-CP-PL03(A)-0016 P-BIFP-PL03-003A

15 Jul-21 P11570-RFI-CP-PL03(A)-0015 P-BIFP-PL03-003A

16 Jul-21 P11570-RFI-CP-PL03(A)-0014 P-BIFP-PL03-003A

17 Jul-21 P11570-RFI-CP-PL03(A)-0013 P-BIFP-PL03-003A


18 Jul-21 P11570-RFI-CP-PL03(A)-0012 P-BIFP-PL03-003A

19 Jul-21 P11570-RFI-CP-IN01(B)-0057 P-BIFP-IN01-153B

20 Jul-21 P11570-RFI-CP-EL39-0054 P-BIFP-EL39-154

21 Jul-21 P11570-RFI-CP-EL36-0022 P-BIFP-EL36-149

22 Jul-21 P11570-RFI-CP-P131(02450)-033 P131(02450)

23 Jul-21 P11570-RFI-CP-P135(04486)-019 P135(04486)

24 Jul-21 P11570-RFI-CP-P135(04856)-019 P135(04856)


25 Jul-21 P11570-RFI-CP-P135(03494)-032 P135(03494)

26 Jul-21 P11570-RFI-CP-P135(03494)-031 P135(03494)

27 Jul-21 P11570-RFI-CP-P131(02450)-032 P131(02450)


28 Jul-21 P11570-RFI-CP-P135(03494)-030 P135(03494)

29 Jul-21 P11570-RFI-CP-P135(04856)-018 P135(04856)

30 Jul-21 P11570-RFI-CP-P135(04486)-018 P135(04486)

31 Jul-21 P11570-RFI-CP-P131(01440)-009 P131(01440)

32 Jul-21 P11570-RFI-CP-P135(08784)-001 P135(08784)

CPECC/ADB/BIFP/
33 Jul-21 P11570-RFI-PG-P1-0232
SBC/2019/084

CPECC/ADB/BIFP/
34 Jul-21 P11570-RFI-PG-P1-0231
SBC/2019/084
CPECC/ADB/BIFP/
35 Jul-21 P11570-RFI-PG-P1-0230
SBC/2019/084

CPECC/ADB/BIFP/
36 Jul-21 P11570-RFI-PG-P1-0229
SBC/2019/084

CPECC/ADB/BIFP/
37 Jul-21 P11570-RFI-PG-P1-0228
SBC/2019/084

CPECC/ADB/BIFP/
38 Jul-21 P11570-RFI-PG-P1-0227
SBC/2019/084

CPECC/ADB/BIFP/
39 Jul-21 P11570-RFI-PG-P1-0226
SBC/2019/084
Scope of Supply Date of Inspection Vendor's Name

Supply of Cladded Pipe, Fittings & Flanges July 17-18, 2021 STS Clad LLC

Supply of Cladded Pipe, Fittings & Flanges July 17 - 18, 2021 STS Clad LLC

Supply of Cladded Pipe, Fittings & Flanges July 11, 2021 STS Clad LLC

Supply of Cladded Pipe, Fittings & Flanges July 10, 2021 STS Clad LLC

Supply of Cladded Pipe, Fittings & Flanges July 8, 2021 STS Clad LLC

Supply of Cladded Pipe, Fittings & Flanges July 5 - 6, 2021 STS Clad LLC

June 29, 2021 to July 1,


Supply of Cladded Pipe, Fittings & Flanges STS Clad LLC
2021
JIANGYIN TIANNING METAL
CS,SS, DSS AND SOLID CRA FLANGES Jul.7th and 12th ,2021 PIPE FITTING
CO.,LTD

JIANGYIN TIANNING METAL


CS,SS, DSS AND SOLID CRA FITTINGS Jul.7th and 12th ,2021 PIPE FITTING
CO.,LTD

Design, Manufacturing and Supply of Insulation GOODRICH GASKET


28.07.2021
Gasket Kit & Gaskets PRIVATE LIMITED

Supply of GRE Piping Bulk Items 24th of July Future Pipe Industries, LLC

Zhangjiagang Guangda Special


Piping Ball Valves 2021-7-29
Material CO.,LTD

Zhangjiagang Guangda Special


Piping Ball Valves 2021-7-26
Material CO.,LTD

Cladding - Batch # 2:
● From: 27/07, 29/07,
6" WELD OVERLAY CLADDED LINE PIPE FTV PROCLAD LLC/Jindal
01/08, 03/08, 05/08, 10/08,
PACKAGES India
12/08, 15/08, 16/08 &
17/08/2021
Cladding - Batch # 2:
● From: 27/07/2021
6" WELD OVERLAY CLADDED LINE PIPE FTV PROCLAD LLC/Jindal
● Until: 10/08/2021
PACKAGES India
● Exclusions: Fridays is
excluded
Cladding - Batch # 2:
● From: 25/07/2021
6" WELD OVERLAY CLADDED LINE PIPE FTV PROCLAD LLC/Jindal
● Until: 23/08/2021
PACKAGES India
● Exclusions: Fridays is
excluded
Batch # 2: Signing of final
MTC, HIC Test Report, 3.2
6" WELD OVERLAY CLADDED LINE PIPE TUV Nord IRN & Final FTV PROCLAD LLC/Jindal
PACKAGES Documentation as per ITP India
●Inspection Dates:
05/07/2021 (1 day visit)
Signing of final MTC, HIC
Test Report, 3.2 TUV Nord
6" WELD OVERLAY CLADDED LINE PIPE IRN & Final Documentation FTV PROCLAD LLC/Jindal
PACKAGES as per ITP India
●Inspection Dates:
02/07/2021 (1 day visit)

Instrumentation Bulk Material July 01, 2021 Extol International FZC

Electrical Bulk Materials 17-July-2021 Isma Flag & Base Trad: FZC

Earthing Material July 01, 2021 MTO for Earthing material

Weld overlay of Flanges and Transition spool &


July 28, 2021 M/S STS CLAD LLC
Girth welding

M/S NEWAY VALVE


Ball, Gate, Globe, Check and Needle Valves 2021/7/19-22, 4days (SUZHOU) CO., LTD.
Industrial Products GmbH

M/s ASTEC Valves & Fittings


DBB 16th & 17th July 2021
Pvt. Ltd.
13.07.2021 to 15-07-2021 &
CHEMICAL INJECTION PACKAGE M/s Technofutura
18-07-2021

12.07.2021
CHEMICAL INJECTION PACKAGE & 14.07.2021 M/s Technofutura

Weld overlay of Flanges and Transition spool &


July 11 & 14, 18 2021 M/S STS CLAD LLC
Girth welding
CHEMICAL INJECTION PACKAGE 08.07.2021 M/s Technofutura

M/s ASTEC Valves & Fittings


DBB 10.07.2021
Pvt. Ltd.

M/S NEWAY VALVE


2021/7/7-9,2021/7/12-
Ball, Gate, Globe, Check and Needle Valves (SUZHOU) CO., LTD.
16,8days
Industrial Products GmbH

M/S NATIONAL PETROLEUM


14th Jul 2021 to 02nd Aug
External 3LPP Coating CONSTRUCTION COMPANY
2021
(NPCC)

Telecom Package 7th July 2021 M/s Elcome International LLC

PENTA GLOBAL
CLADDED PIPING SPOOL FABRICATION &
26 & 28-July-2021 ENGINEERING COMPANY
FIELD WELDING SERVICES
LLC

PENTA GLOBAL
CLADDED PIPING SPOOL FABRICATION &
26 & 28-July-2021 ENGINEERING COMPANY
FIELD WELDING SERVICES
LLC
PENTA GLOBAL
CLADDED PIPING SPOOL FABRICATION &
17, 18 & 19-July-2021 ENGINEERING COMPANY
FIELD WELDING SERVICES
LLC

PENTA GLOBAL
CLADDED PIPING SPOOL FABRICATION &
17, 18 & 19-July-2021 ENGINEERING COMPANY
FIELD WELDING SERVICES
LLC

PENTA GLOBAL
CLADDED PIPING SPOOL FABRICATION &
10, 12 & 14-July-2021 ENGINEERING COMPANY
FIELD WELDING SERVICES
LLC

PENTA GLOBAL
CLADDED PIPING SPOOL FABRICATION &
10, 12 & 14-July-2021 ENGINEERING COMPANY
FIELD WELDING SERVICES
LLC

PENTA GLOBAL
CLADDED PIPING SPOOL FABRICATION &
8-July-2021 ENGINEERING COMPANY
FIELD WELDING SERVICES
LLC
ADNOC
Location of Inspection Country Interventi Items / Description
on
STS Clad LLC Facility Request to appoint TPI with 3.1 & 3.2 certification for
PO Box 85785, the activity as per the approved Inspection Test Plan
PLS328, Zone S, Al Ghail no. 11-99-97-6771 for Cladding of Pipes
UAE W
Industrial Zone (ITP Activity 2.1 to 5.10)
Ras Al Khaimah, United Arab
Emirates
STS Clad LLC Facility Request to appoint TPI with 3.1 & 3.2 certification for
PO Box 85785, the activity as per the approved Inspection Test Plan
PLS328, Zone S, Al Ghail no. 11-99-97-6771 for Cladding of Pipes
UAE W
Industrial Zone (ITP Activity 2.1 to 5.10)
Ras Al Khaimah, United Arab
Emirates
STS Clad LLC Facility Request to appoint TPI with 3.1 & 3.2 certification for
PO Box 85785, the activity as per the approved Inspection Test Plan
PLS328, Zone S, Al Ghail no. 11-99-97-6771 for Cladding of Pipes
UAE W
Industrial Zone (ITP Activity 2.1 to 5.10)
Ras Al Khaimah, United Arab
Emirates
STS Clad LLC Facility Request to appoint TPI with 3.1 & 3.2 certification for
PO Box 85785, the activity as per the approved Inspection Test Plan
PLS328, Zone S, Al Ghail no. 11-99-97-6771 for Cladding of Pipes
UAE W
Industrial Zone (ITP Activity 2.1 to 5.10)
Ras Al Khaimah, United Arab
Emirates
STS Clad LLC Facility Request to appoint TPI with 3.1 & 3.2 certification for
PO Box 85785, the activity as per the approved Inspection Test Plan
PLS328, Zone S, Al Ghail no. 11-99-97-6771 for Cladding of Pipes
UAE W
Industrial Zone (ITP Activity 2.1 to 5.10)
Ras Al Khaimah, United Arab
Emirates
STS Clad LLC Facility Request to appoint TPI with 3.1 & 3.2 certification for
PO Box 85785, the activity as per the approved Inspection Test Plan
PLS328, Zone S, Al Ghail no. 11-99-97-6771 for Cladding of Pipes
UAE W
Industrial Zone (ITP Activity 2.1 to 5.10)
Ras Al Khaimah, United Arab
Emirates
STS Clad LLC Facility Request to appoint TPI with 3.1 & 3.2 certification for
PO Box 85785, the activity as per the approved Inspection Test Plan
PLS328, Zone S, Al Ghail no. 11-99-97-6771 for Cladding of Pipes
UAE W
Industrial Zone (ITP Activity 2.1 to 5.10)
Ras Al Khaimah, United Arab
Emirates
Witness 11.TENSILE
TEST/12.Hardness/13.Corrosion test/14.PRODUCT
ANALYSIS/
NO.281chuangxin Witness 16.ULTRASONIC EXAMINATION
18.PICKLING AND PASSIVATION/19.DYE
avenue,jiangyin China W PENETRANT EXAMINATION/20.PMI
city,jiangsu province,china EXAMINATION/
21.MARKING AND COLOUR
CODE/22 .Visual,Dimension Inspection/22-24.
Document review&signed

NO.281chuangxin Witness Mechanical test/Hardness/Corrosion test/


avenue,jiangyin 11.PT /UT12.Visual,Dimension Inspection
China W
13.Pickling & Passivation14.Marking and color
city,jiangsu province,china
coading 15.PMI and Document review&signed/
#40, Velichai Village,
Vandalur - Kelambakkam Final Inspection (TPI) for Insulation Gasket Kits
India R
Road, Chennai - 600048. EN 10204-3.1 Certification package
Tamilnadu, India.
ICAD 1. Future Pipe
Industries (L.L.C.) 
UAE W Inspection GRE lamination materail.
P.O. Box 29205
Abu Dhabi
No. 58. Jin Lan
Road,Fenghuang
WITNESS ACTIVITIES AS PER ITP WITNESS
Town,Zhangjiagang China W
POINTS 2.3/2.4/2.5 for material F316L
City,jiangsu
Province,215614,P.R.China
No. 58. Jin Lan
Road,Fenghuang
WITNESS ACTIVITIES AS PER ITP WITNESS
Town,Zhangjiagang China W
POINTS 2.3/2.4/2.5 for material F316L
City,jiangsu
Province,215614,P.R.China
Inspection of Claded Line Pipe as per approved ITP
Items Description:
P.O. Box: 127847, Abu
UAE W ● 6" x 9.53mm WT API 5L Gr. X60 PSL-2 QS (with
Dhabi, UAE
3mm CRA 825 internally clad) - 2 lengths of 3LPP
Coated Pipes (POS SL#2)
Inspection of Claded Line Pipe as per approved ITP
Items Description:
P.O. Box: 127847, Abu
UAE W ● 6" x 9.53mm WT API 5L Gr. X60 PSL-2 QS (with
Dhabi, UAE
3mm CRA 825 internally clad) - 2 lengths of 3LPP
Coated Pipes (POS SL#2)
Inspection of Claded Line Pipe as per approved ITP
Items Description:
P.O. Box: 127847, Abu
India W ● 6" x 9.53mm WT API 5L Gr. X60 PSL-2 QS (with
Dhabi, UAE
3mm CRA 825 internally clad) - 2 lengths of 3LPP
Coated Pipes (POS SL#2)

Inspection of Claded Line Pipe as per approved ITP


Items Description:
P.O. Box: 127847, Abu
India W ● 6" x 9.53mm WT API 5L Gr. X60 PSL-2 QS (with
Dhabi, UAE
3mm CRA 825 internally clad) - 2 lengths of 3LPP
Coated Pipes (POS SL#2)
Inspection of Claded Line Pipe as per approved ITP
Items Description:
P.O. Box: 127847, Abu
India W ● 6" x 9.53mm WT API 5L Gr. X60 PSL-2 QS (with
Dhabi, UAE
3mm CRA 825 internally clad) - 2 lengths of 3LPP
Coated Pipes (POS SL#2)

Extol International Fzc


Ajman Free Zone UAE R Final Visual and Dimensional checks
Warehouse E1-14
As per ITP no. 11-99-97-3977, activity no. 4 Final
Abudhabi UAE R inspection: Document Review.
Item no. 11.1, 11.2, 13.1
Extol International Fzc
Ajman Free Zone UAE R Final Visual and Dimensional checks
Warehouse E1-14
1. Activity 5.1 - Weld Overlay Thickness
Measurement
STS Clad LLC Facility
2. Activity 5.2 - Liquid Penetrant Testing
PO Box 85785,
3. Activity 5.3 - UT Disbonding
PLS328, Zone S, Al Ghail
UAE W, R 4. Activity 5.4 - Positive Material Identification (PMI)
Industrial Zone
5. Activity 5.5 - Hardness Test
Ras Al Khaimah, United Arab
6. Activity 5.6 - Weld Repair (If Any)
Emirates
7. Activity 5.7 - Final Visual Inspection and
Dimensional Inspection
No.666 Taishan Road, New
District, Suzhou, P. R. China China W Activity No. 11,16~19 of Inspection Test Plan
215129

FAT ON FOLLOWING ITEMS : INCONEL 825


FORGING, PO SR. NO. : 1 - PO QTY. 17 NOS.
OFFER QTY. : 10 Nos. PO SR. NO. : 4 - PO QTY.
Unit 2-ASTEC Valves &
56 NOS. OFFER QTY. : 39 Nos. ITP ACTIVITY
Fittings Pvt. LtdPlot No. 40,
NO. : M4, M5, Review of documents as applicable as
Survey No. 66, Waliv heavy
per approved ITP PAINTING INSPECTION ON :
industrial area, Waliv, Vasai –
India W ANNEXURE 1 - PO SR. NO. : 2 - PO QTY. 09 NOS.
East - 401208,
OFFER QTY. : 05 Nos. ANNEXURE 3 - PO SR.
MAHARASHTRA, INDIA
NO. : 1 - PO QTY. 13 NOS. OFFER QTY. : 13 Nos.
ASTEC Valves & Fittings Pvt.
ANNEXURE 1 - PO SR. NO. : 5 - PO QTY. 06 NOS.
Ltd. Unit No.10/11, Geeta
OFFER QTY. : 06 Nos. ANNEXURE 3 - PO SR.
NO. : 3 - PO QTY. 13 NOS. OFFER QTY. : 06 Nos.
ITP CL. NO. : M6 to M9, as applicable
CI Skid (Tag: Well Bb-0583 & 0554) (Tag: Well Bb-
0585 & 0557)
1) Final visual and dimensional inspection of skid 2)
Leak test of skid 3)Factory acceptance test (FAT)
for
chemical injection skid
Techno Futura Pressure
Skid Tubing (Well BB-0557 & 1181)
Vessels MFG. LLC Al Ain
1) Hydrostatic pressure test
Industrial City UAE W, R
Skid Piping (Well BB-1181)
P.O. Box: 68199, Al Ain,
1)Visual & Dimensional Inspection 2) Hydrostatic
UAE.
pressure test
CI Skid Shelter (Well BB-0554 & 0557)
1) Final painting inspection 2) Inspection Release
Note
Skid Piping (Well BB-1181)
1) Final Painting Inspection

CI Skid (Tag: Well Bb-0583 & 0554) (Tag: Well Bb-


0585 & 0557)
1) Final visual and dimensional inspection of skid 2)
Leak test of skid 3)Factory acceptance test (FAT)
for
chemical injection skid
Techno Futura Pressure
Skid Tubing (Well BB-0557 & 1181)
Vessels MFG. LLC Al Ain
1) Hydrostatic pressure test
Industrial City UAE W, R
Skid Piping (Well BB-1181)
P.O. Box: 68199, Al Ain,
1)Visual & Dimensional Inspection 2) Hydrostatic
UAE.
pressure test
CI Skid Shelter (Well BB-0554 & 0557)
1) Final painting inspection 2) Inspection Release
Note
Skid Piping (Well BB-1181)
1) Final Painting Inspection

1. Activity 5.1 - Weld Overlay Thickness


Measurement
STS Clad LLC Facility
2. Activity 5.2 - Liquid Penetrant Testing
PO Box 85785,
3. Activity 5.3 - UT Disbonding
PLS328, Zone S, Al Ghail
UAE W, R 4. Activity 5.4 - Positive Material Identification (PMI)
Industrial Zone
5. Activity 5.5 - Hardness Test
Ras Al Khaimah, United Arab
6. Activity 5.6 - Weld Repair (If Any)
Emirates
7. Activity 5.7 - Final Visual Inspection and
Dimensional Inspection
CI Skid (Tag: Well Bb-0583 & 0554) (Tag: Well Bb-
0585 & 0557)
1) Final visual and dimensional inspection of skid 2)
Leak test of skid 3)Factory acceptance test (FAT)
for
chemical injection skid
Techno Futura Pressure
Skid Tubing (Well BB-0557 & 1181)
Vessels MFG. LLC Al Ain
1) Hydrostatic pressure test
Industrial City UAE W, R
Skid Piping (Well BB-1181)
P.O. Box: 68199, Al Ain,
1)Visual & Dimensional Inspection 2) Hydrostatic
UAE.
pressure test
CI Skid Shelter (Well BB-0554 & 0557)
1) Final painting inspection 2) Inspection Release
Note
Skid Piping (Well BB-1181)
1) Final Painting Inspection

FAT ON FOLLOWING ITEMS : INCONEL 825


FORGING, PO SR. NO. : 1 - PO QTY. 17 NOS.
OFFER QTY. : 10 Nos. PO SR. NO. : 4 - PO QTY.
Unit 2-ASTEC Valves &
56 NOS. OFFER QTY. : 39 Nos. ITP ACTIVITY
Fittings Pvt. LtdPlot No. 40,
NO. : M4, M5, Review of documents as applicable as
Survey No. 66, Waliv heavy
per approved ITP PAINTING INSPECTION ON :
industrial area, Waliv, Vasai –
India W ANNEXURE 1 - PO SR. NO. : 2 - PO QTY. 09 NOS.
East - 401208,
OFFER QTY. : 05 Nos. ANNEXURE 3 - PO SR.
MAHARASHTRA, INDIA
NO. : 1 - PO QTY. 13 NOS. OFFER QTY. : 13 Nos.
ASTEC Valves & Fittings Pvt.
ANNEXURE 1 - PO SR. NO. : 5 - PO QTY. 06 NOS.
Ltd. Unit No.10/11, Geeta
OFFER QTY. : 06 Nos. ANNEXURE 3 - PO SR.
NO. : 3 - PO QTY. 13 NOS. OFFER QTY. : 06 Nos.
ITP CL. NO. : M6 to M9, as applicable

No.666 Taishan Road, New


District, Suzhou, P. R. China China W Activity No. 11,16~19 of Inspection Test Plan
215129
Production coating
NPCC pipe coating Yard ,
lab test
ICAD -IV , Industrial Area, UAE W
documentation
Abu dhabi
ITP Activity No 1 to 6.8 & 8 to 13
Elcome International LLC
Functionality tests as per FAT Docs. Refer ITP for
Dubai Investment park-1 UAE W
Details.
Dubai (UAE) PO Box: 1788
1.Material Receipt - Paint & Abrasives
2.Surface Preparation, Coating application and Final
PENTA GLOBAL Plot No.
InspectionMaterial Inspection, Piping Fabrication
47NR27, ICAD III, PO BOX
UAE R,W activity, FD Check and Fit up inspection, Welding
8276, Mussafah, Abu Dhabi,
Operation, NDT, Film Review, SCR Review,
U.A.E
Inspection Release
Note review, RT film digitalization.

1.Material Receipt - Paint & Abrasives


2.Surface Preparation, Coating application and Final
PENTA GLOBAL Plot No.
InspectionMaterial Inspection, Piping Fabrication
47NR27, ICAD III, PO BOX
UAE R,W activity, FD Check and Fit up inspection, Welding
8276, Mussafah, Abu Dhabi,
Operation, NDT, Film Review, SCR Review,
U.A.E
Inspection Release
Note review, RT film digitalization.
1.Material Receipt - Paint & Abrasives
2.Surface Preparation, Coating application and Final
PENTA GLOBAL Plot No.
InspectionMaterial Inspection, Piping Fabrication
47NR27, ICAD III, PO BOX
UAE R,W activity, FD Check and Fit up inspection, Welding
8276, Mussafah, Abu Dhabi,
Operation, NDT, Film Review, SCR Review,
U.A.E
Inspection Release
Note review, RT film digitalization.

1.Material Receipt - Paint & Abrasives


2.Surface Preparation, Coating application and Final
PENTA GLOBAL Plot No.
InspectionMaterial Inspection, Piping Fabrication
47NR27, ICAD III, PO BOX
UAE R,W activity, FD Check and Fit up inspection, Welding
8276, Mussafah, Abu Dhabi,
Operation, NDT, Film Review, SCR Review,
U.A.E
Inspection Release
Note review, RT film digitalization.

1.Material Receipt - Paint & Abrasives


2.Surface Preparation, Coating application and Final
PENTA GLOBAL Plot No.
InspectionMaterial Inspection, Piping Fabrication
47NR27, ICAD III, PO BOX
UAE R,W activity, FD Check and Fit up inspection, Welding
8276, Mussafah, Abu Dhabi,
Operation, NDT, Film Review, SCR Review,
U.A.E
Inspection Release
Note review, RT film digitalization.

1.Material Receipt - Paint & Abrasives


2.Surface Preparation, Coating application and Final
PENTA GLOBAL Plot No.
InspectionMaterial Inspection, Piping Fabrication
47NR27, ICAD III, PO BOX
UAE R,W activity, FD Check and Fit up inspection, Welding
8276, Mussafah, Abu Dhabi,
Operation, NDT, Film Review, SCR Review,
U.A.E
Inspection Release
Note review, RT film digitalization.

1.Material Receipt - Paint & Abrasives


2.Surface Preparation, Coating application and Final
PENTA GLOBAL Plot No.
InspectionMaterial Inspection, Piping Fabrication
47NR27, ICAD III, PO BOX
UAE R,W activity, FD Check and Fit up inspection, Welding
8276, Mussafah, Abu Dhabi,
Operation, NDT, Film Review, SCR Review,
U.A.E
Inspection Release
Note review, RT film digitalization.
Status

Approved

Approved

Approved

Approved

Abolished

Approved

Approved
Approved

Approved

Approved

Approved

Approved

Approved

Approved

Approved

Approved

Approved
Approved

Approved

Approved

Approved

Approved

Approved

Approved
Approved

Approved

Approved
Approved

Approved

Approved

Approved

Approved

Approved

Approved
Approved

Approved

Approved

Approved

Approved