33 KV Substation_Supply Page 1
Finalization of vendor for procurement of Substation Equipment and subsequently submission of Drawing 5B
Type test Type Test
Order GTP/Drawing Submission
Sl Item Description Name of Vendor GTP/Drg Status done / submission TT Status Remarks
Status Date
extended date
33 KV Sub Station Work
11 kV, 630 Amp C&R Cum VCB Panel for
29 Pascal 3/18/2022 SUBMITTED
11KV Bus-Coupler
30 24 V, 80AH, Ni-Cd sealed Battery under Finalization 4/15/2022
31 Battery Charger alongwith DCDB under Finalization 4/15/2022
32 415V AC Distribution board under Finalization 4/15/2022
33 Bay marshelling Kiosk under Finalization 4/15/2022
34 11 kV, XLPE, 3Cx400 sq mm under Finalization 4/15/2022
35 11 kV, XLPE, 3Cx120 sq mm under Finalization 4/15/2022
11kV, Indoor End termination kit for
36 under Finalization 4/15/2022
3Cx400 mm2
11kV, Indoor End termination kit for
37 under Finalization 4/15/2022
3Cx120 mm2
11kV, Outdoor End termination kit for
38 under Finalization 4/15/2022
3Cx120 mm2
1.1kV, 3.5Cx50 Sq.mm PVC Insulated
39 under Finalization 4/15/2022
Armored cable
1.1KV, 4Cx10 Sq.mm PVC Insulated
40 under Finalization 4/15/2022
Armored Cable
1.1KV, 2Cx10 Sq.mm PVC Insulated
41 under Finalization 4/15/2022
Armored Cable
1.1KV, 2Cx2.5 Sq.mm PVC Insulated
42 under Finalization 4/15/2022
Armored Cable
1.1KV, 5Cx2.5 Sq.mm PVC Insulated
43 under Finalization 4/15/2022
Armored Cable
1.1KV, 10Cx2.5 Sq.mm PVC Insulated
44 under Finalization 4/15/2022
Armored Cable
1.1KV, 12Cx2.5 Sq.mm PVC Insulated
45 under Finalization 4/15/2022
Armored Cable
46 Lighting System-Switchyard under Finalization 4/15/2022
47 Lighting System-Control Room under Finalization 4/15/2022
Clamp & Connector for 02 Trf 01 33 kV
48 under Finalization 4/15/2022
line Bay
Clamp & Connector for 02 Trf 03 33 kV
49 under Finalization 4/15/2022
line Bay
Clamp & Connector for 01 line bay in
50 under Finalization 4/15/2022
existing S/s
51 33KV, AB Switch for Station Transformer Ultima 4/15/2022 APPROVED APPROVED
52 33KV, HG Fuse for Station Transformer Ultima Done 1/25/2022 APPROVED APPROVED
53 11KV, AB Switch for Outgoing DP Hightension Done 1/25/2022 APPROVED APPROVED
54 ACSR Wolf Conductor Laser Done 1/25/2022 APPROVED APPROVED
55 Digital IR Tester (2kV-5kV) under Finalization 4/15/2022
56 Digital multimeter under Finalization 4/15/2022
57 Earth resistance tester under Finalization 4/15/2022
33 KV Substation_Supply Page 2
Finalization of vendor for procurement of Substation Equipment and subsequently submission of Drawing 5B
Type test Type Test
Order GTP/Drawing Submission
Sl Item Description Name of Vendor GTP/Drg Status done / submission TT Status Remarks
Status Date
extended date
33 KV Sub Station Work
Stainless Steel Oil sampling bottle (One
58 under Finalization 4/15/2022
Litre Capacity)
59 11 kV Discharge Rod(1 set of 3 rods) under Finalization 4/15/2022
60 Battery Voltage Tester under Finalization 4/15/2022
61 33 kV Discharge Rod (1 set of 3 rods) under Finalization 4/15/2022
Supply of Oil Filtration machine with
62 under Finalization 4/15/2022
filtration capacity of 4K litre per hour
Dry Chemical Powder type extinguisher (6
63 under Finalization 4/15/2022
Kg)
64 CO2 Type of 4.5Kg extinguisher under Finalization 4/15/2022
65 CO2 Trolly Mounted of 22.5 Kg under Finalization 4/15/2022
33 KV Substation_Supply Page 3
Finalization of vendor for procurement of 33KV Line Material and subsequently submission of Drawing 5B
Type test done / Type Test
Sl Item Description Name of Vendor Order Status GTP/Drawing Submission Date Status TT Status Remarks
extended submission date
33 kV Line
2 STP (E410C) 12 mts (Single Part) SKIPPER Done 11/30/2021 Approved in CAT-I extended
STP (E410C) 12 mts (Double Part) SKIPPER Done Drawing Approved in CAT-1; GTP submitted extended
3 STP (E410C) 12 mts (Single Part) Utkarsh Done 11/30/2021 Approved in CAT-I extended
STP (E410C) 12 mts (Double Part) Utkarsh Done Approved in CAT-I extended
4 STP (E410C) 14.5 mts. SKIPPER Done 11/30/2021 GTP Approved in CAT-I, Drawing under revision extended
5 STP (E410C) 14.5 mts. Utkarsh Done 11/30/2021 Approved in CAT-I extended
7 33 kV, 10 KN Pin, nut and washers KSE Done 12/30/2021 Approved in CAT-I extended APPROVED
8 70 KN B&S disc insulator (3 nos disc insulator) Bikaner Ceramics Done 1/30/2022 Approved in CAT-I APPROVED
10 70 KN B&S disc insulator (4 nos disc insulator) Bikaner Ceramics Done 1/30/2022 Approved in CAT-I APPROVED
13 Guy Strain Insulators designation 'C' Bikaner Ceramics Done 1/30/2022 Approved in CAT-I extended APPROVED
14 Stay wire (7/8 SWG) UIC Done 1/30/2022 sent for revision
15 8 SWG GI for guarding, lacing & earthing UIC Done 1/30/2022 sent for revision
17 Hardware fittings for 33KV stay Set KSE Done 12/30/2021 Approved in CAT-I extended
33 kV Line_Supply Page 1
Finalization of vendor for procurement of 66KV Line Material and subsequently submission of Drawing 5B
Type test done / Type Test submission
Sl Item Description Name of Vendor GTP/Drawing Submission date TTR Status Remarks
extended date
66 kV Line
11 FODP-48F 4/15/2022
12 FODP-96F 4/15/2022
15 BOM