From: To:
Assistant Engineer The AssistantEngineer-III
Maintenance /220/132KVSS Civil/ Construction
NAGARKURNOOL MAHABOOBNAGAR
Lr.No.AE /M /220KV SS /Nagarkurnool / F. No. /D.No. /Dt.15.06.2021
Sir,
Sub: - Maint/ 220/132/KV, Nagarkurnool SS – Certain Remarks and Action Suggested
by Quality Assurance TSTRANSCO to be taken up at 220/132/33KV
Nagarkurnool SS– Information –Submitted- Regarding.
To the reference 1st cited above the Quality Assurance TSTRANSCO Inspected the following
remarks at 220/132KV Nagarkurnool SS. Further to the reference 2 nd cited The Chief Engineer Transmission
Vidyuth Soudha has requested compliance report on the below said remarks.
Sl No Location Remarks Action Suggested by QA.
1 220KV Control Inside the control room,cracks noticed in the The same shall be Attended
Room masonary work and also around the UPVC
Windows
2 Compound Wall a)A portion of compound wall on all four sides a)Thedamaged compound wall
(VIz,Nortth,East,West&South)of the entire shall be constructed ad barbed wire
substation found damaged. & Y angles shall be provided
b)Compound wall color is faded b)White washing to the compound
wall shall be taken up.
This is here with Submitted for the favour of information and further necessary action please.
Copy Submitted to
Assistant Divisional Engineer /Maint/SD/Kalwakurthy. for Further Necessary Action please
Assistant Engineer
Maint/220/132 KV SS
Nagarkurnool.