Professional Documents
Culture Documents
Assignment No. 3
Rate
Date Submitted:
December 1, 2022
Answer the following questions. Answers must have at least five (5) sentences.
1. How are you going to maximize the standard method of measurement for the quantification of
construction works?
To maximize the SMM for the quantification of construction works, one must need to learn
first how to properly use the tabulated rules. This is located in Chapter 2 of the Philippine Standard
Method of Measurement (PSMM), 7th edition 2014. But since there are several SMM available in
the industry, the use of tabulated rules may be in a different section. Nevertheless, understanding
this is essential as this will prevent most likely occurring errors such as overlooked rules and
underestimate measurement, and allow Quantity Surveyor to effectively employ the SMM for the
quantification of works.
2. Being a civil engineering student, what is the importance of having background knowledge
about the standard method of measurement?
Having background knowledge about SMM prepares us for the real world of the construction
industry where complexity and ambiguity are not inevitable. As we take a step in our future
profession as Quantity Surveyors, this can ensure that we can provide quality work, save every
cost of the construction, and execute the good performance that the industry requires. This will
also serve as our universal communication with partner companies we are going to deal with. Thus,
leading to a successful quantity take-off and cost-effective projects.
3. Do you think there is still a need for improvement in the standard method of measurement we
are using in civil engineering? Why?
HONOR PLEDGE:
“I affirm that I have not given or received any unauthorized help in this assignment and that all
work shall be my own.”