PLANNING

QUALITY METRICS

Project Name Project ID Project Manager

Business Process Owner Project Sponsor Project Executive Sponsor

Actual Metrics
ID Item/Description Planned Metric Measurement Method Comments
Metric Met?

WBS or Item to be Measurement (from Method of measuring Any notes during the project Metric Yes or No
other measured with a stakeholder input matrix, quality assessments at the and
identifie clear description project charter, time actions
r requirements traceability measur that need
matrix, etc.) e-ment to be
is taken taken to
meet
metric

PMPreps.com Revised: 11/11/2019


Quality Metrics 1 of 2
Quality Metrics provide detailed, specific measurements about a project, product, service, or result and how it should be measured. Metrics are
consulted in the quality assurance process to ensure that the processes used will meet the metric. The deliverables or processes are measured in
the quality control process and compared to the metric to determine if the result is acceptable or if corrective action or rework is required. The
needs of the project will determine the appropriate metrics.