FORM TEST COMMISSIONING

PROYEK : PENGADAAN MODERNISASI ME DAN EKSPAN ME SUPPORT POP, OTN DAN SKKL
2021 (TELKOMINFRA)
KONTRAK : K.TEL.010805/HK.810/OPS-10000000/2021, TANGGAL 27 DESEMBER 2021
SUB SYSTEM : SS#6.1 PENGADAAN RESTIFIER DAN BATTERY OTN JABAR
PELAKSANA : PT. INFRASTRUKTUR TELEKOMUNIKASI INDONESIA
LOKASI :
TANGGAL :

I. VISUAL CHECK RECTIFIER

1.1 BASE SYSTEM

NO DESCRIPTION SPECIFICATION PN / SN / VALUE RESULT

I RECTIFIER

1. Subrack System Module Unit (RSMU)

 Subrack 6U P/N: …………………… 

S/N: …………………… 

 Adapter LSA 1U / 19” P/N: …………………… 

 Terminal LSA 10-pin P/N: …………………… 

 Grounding Bar P/N: …………………… 

Qty ………… Unit 

2. Supervisory Module 

 Supervisory Module P/N: …………………… 

S/N: …………………… 

AC, Battery & Rectifier Subrack Distribution


3.
Module Unit (ABDU)

 MCB AC Distribution 63A P/N: …………………… 

MCB Qty ………… Unit 

 Terminal UK35 P/N: 

Qty ………… Unit 

 Arrester P/N: …………………… 

 Busbar Battery Distribution Positif P/N: …………………… 

………… Unit 

 Busbar Battery Distribution Negatif P/N: …………………… 

MCB Qty ………… Unit 

Sub Rack System Module

 Subrack Module 3U / 19” P/N: ETP48400C3B1 

S/N: …………………… 

4. DC (L) Distribution Module Unit (DLDU)

 Sub rack Distribution 3U / 19” P/N: 


S/N: …………………… 

 Integrasi MCB Distribution LVD1 WIRING ………… Unit 

 Integrasi MCB Distribution LVD2 WIRING ………… Unit 

 Integrasi MCB Distribution UK16 WIRING ………… Unit 

 Integrasi MCB Distribution UK10 WIRING ………… Unit 

 Blank MCB Plastik P/N: 

 Qty ………… Unit 

1.2 Rectifier Module System

NO DESCRIPTION PN & SN RESULT

1. Rectifier Module P/N: R4850G2 


S/N:
Slot 1st ……………………………………………………… 

S/N:
Slot 2nd ……………………………………………………… 

S/N:
Slot 3rd ……………………………………………………… 

S/N: 
Slot 4th ………………………………………………………

S/N: 
Slot 5th ………………………………………………………

S/N: 
Slot 6th ………………………………………………………

P/N: 
2. Blank Panel Rectifier ………………………………………………………

Blank Module QTY …………………..Unit

II. FUNCTIONAL TEST SYSTEM

2.1 SUPERVISORY MODULE CONTROL

NO DESCRIPTION THRESHOLD PARAMETER RESULT

1. Software Version …………….. 


1. DC Voltage Display 54.0 / 55.2 Vdc (+/- 10%) 
2. Battery Capacity …………….. Ah 
3. Current Display 
4. Low Float Voltage Alarm 53.7 Vdc / 51.6 Vdc 
5. Low Load Voltage Alarm 47 Vdc / 46.8 Vdc 
6. High Float Voltage Alarm 56.2 Vdc / 55.2 Vdc 
7. High Load Voltage Alarm 58.2 Vdc / 58.0 Vdc 
8. Battery Fuse Fail State & Alarm Active State Open 
9. Phase Fail Alarm MCB AC OFF 
10. AC Fail Alarm MCB AC OFF 
11. Battery High Temperature Alarm 30° / 40° C 
12. Battery Current Limit Alarm 10 % 
13. Current Limit System Alarm 80 % 
14. LVD1 Disconnect 43.2 Vdc / 46.0 Vdc, LVD Disconnect 
15. LVD1 Reconnect 51.0 Vdc / 51.6 Vdc, LVD Reconnect 
14. LVD2 Disconnect 43.2 Vdc / 46.0 Vdc, LVD Disconnect 
16. LVD2 Reconnect 51.0 Vdc / 51.6 Vdc, LVD Reconnect 
17. Fast Charge

 Fast Charge enable 


 Charge Voltage 57.6 Vdc 
 Start Condition

Voltage Threshold 48.0 Vdc 


Discharge Threshold 30% / 60% 
 Stop Condition

Recharge 110% 
Maximum Duration 720 / 1440 minutes 
18. Manual Equalize

 Manual Equalize enable 


 Duration 720 / 1440 minutes 
 Charging Voltage 57.6 Vdc 
 Float Voltage 54 Vdc 
19. Periodic Equalize

 Periodic Equalize enable 


 Duration 720 / 1440 minutes 
 Charging Voltage 57.6 Vdc 
 Float Voltage 54 Vdc 
 Interval 90 days 

2.2 RECTIFIER MODULE

MODULE MODULE TEST RESULT


NO DESCRIPTION INDICATOR
TEST 1 2 3 4 5

1. Power On Indicator Rectifier On Green Led On     


Urgent Alarm
2. Urgent Alarm Indicator
Active
Red Led On     

Non-Urgent
3. Non-Urgent Alarm Indicator
Alarm Active
Yellow Led On     

MODULE MODULE TEST RESULT


NO DESCRIPTION INDICATOR
TEST 6 7 8 9

1. Power On Indicator Rectifier On Green Led On    


Urgent Alarm
2. Urgent Alarm Indicator
Active
Red Led On    

Non-Urgent
3. Non-Urgent Alarm Indicator
Alarm Active
Yellow Led On    

2.3 ALARM CONTROL

RELAY ALARM ACTIVE RELAY


NO DESCRIPTION RELAY TEST RESULT
MAPPING LEVEL STATE

1. Relay Output

Monitor OK De-Energize NC Monitor OK 


Relay 1st Partial AC Fail Energize NC Active Relay 1st 
Relay 2rd Rectifier fail Active Relay
Energize NC
2rd

Relay 3nd High Load or Low Load Active Relay


Energize NC
3nd

Relay 4th Battery High Temperature Energize NC Active Relay 4th 


Relay 5th Genset Run Energize NC Active Relay 5th 

III. RUNNING TEST SYSTEM


NO DESCRIPTION THRESHOLD TEST RESULT

1. Average Input AC Voltage System …………… Vac 


2. Output DC Voltage System …………… Vdc 
3. Load Current .…………… A 
4. Grounding to Positive Voltage .…………… Vdc 
5. Grounding to Negative Voltage .…………… Vdc 
6. Current Limit System .…………… % 
7. Battery Current Limit .…………… % 
8. Start Date .…………… 
9. Start Time .…………… 
10. Finish Date .…………… 
11. Finish Time .…………… 

DESCRIPTION SPECIFICATION RESULT NOTE

Power System System OK 

  PENDING PEKERJAAN            

No Tanggal
Pekerjaan PIC No Kontak
. Pelaksanaan
               
               
               
  ADDITIONAL NOTES            
               

…………,…………,.......,..............2022

MITRA PT. Telkom Indonesia


PT. Infrastruktur Telekomunikasi Indonesia WASPANG

Dwi Mulya S. Indra Kusuma


NIK. 980160