Professional Documents
Culture Documents
URL: https://japan.global2d.daikin.com/ja_JP/login
■ After accessing the website, please switch to the nearest server through “Switch Region.”
■ Please use Chrome to access the website.
■ If new function seems to be unavailable, please click “Delete Database” button.
■ Improvements
1. The piping tab has been modified to set a default length of 0.1m
Usability
when using manual input mode. This is to facilitate the change of
improvement
piping connections without inputting the length for each pipe.
-1-
Usability
3. Added a "Delete Database" button in the screens after logging in
for better use. improvement
Error
4. Corrected the indoor unit manual selection logic. correction
Usability
5. Added a guidance in the unit tab to make operation more intuitive.
improvement
1. Project information shown on the screen (default) is set to three months prior to today.
Please change the date for older projects.
3. Available CAD file formats for uploading are as follows: DWG (2000/LT2000-), DXF, PDF, JPEG,
PNG and TIFF. File format cannot be mixed within one project.
For ZIP file, only one CAD file format in one zip file is allowed.
-3-