Garut 3
Garut 3
TIDAK
NO KABUPATEN/KOTA SEDERHANA SEDERHANA BANG. KHUSUS TIPE A TIPE B TIPE C,D,E DEPAN BELAKANG SAMPING DEPAN BELAKANG SAMPING
WILAYAH I
1 Kota Bogor Rp7,710,000 Rp6,080,000 Rp7,680,000 Rp7,550,000 Rp6,030,000 Rp3,230,000 Rp3,110,000 Rp2,940,000 Rp2,940,000 Rp2,010,000 Rp1,850,000
2 Kabupaten Bogor Rp7,950,000 Rp6,260,000 Rp7,840,000 Rp7,710,000 Rp6,220,000 Rp3,440,000 Rp2,920,000 Rp2,750,000 Rp3,180,000 Rp1,850,000 Rp1,710,000
3 Kabupaten Cianjur Rp5,800,000 Rp4,460,000 Rp5,540,000 Rp5,320,000 Rp4,300,000 Rp2,420,000 Rp2,150,000 Rp2,050,000 Rp2,240,000 Rp1,410,000 Rp1,320,000
4 Kota Sukabumi Rp5,720,000 Rp4,820,000 Rp5,660,000 Rp5,480,000 Rp4,240,000 Rp2,560,000 Rp2,180,000 Rp2,070,000 Rp2,390,000 Rp1,520,000 Rp1,350,000
5 Kabupaten Sukabumi Rp5,970,000 Rp4,950,000 Rp5,830,000 Rp5,780,000 Rp4,370,000 Rp2,840,000 Rp2,350,000 Rp2,210,000 Rp2,680,000 Rp1,570,000 Rp1,470,000
6 Kota Depok Rp6,210,000 Rp5,080,000 Rp5,940,000 Rp5,700,000 Rp4,780,000 Rp2,820,000 Rp2,290,000 Rp2,180,000 Rp2,610,000 Rp1,480,000 Rp1,380,000
7 Kota Bekasi Rp5,800,000 Rp4,280,000 Rp5,730,000 Rp5,360,000 Rp4,290,000 Rp5,730,000 Rp5,360,000 Rp2,080,000 Rp2,270,000 Rp1,380,000 Rp1,300,000
8 Kabupaten Bekasi
9 Kabupaten Karawang Rp5,480,000 Rp4,470,000 Rp5,410,000 Rp5,370,000 Rp4,190,000 Rp2,450,000 Rp2,150,000 Rp2,050,000 Rp2,240,000 Rp1,360,000 Rp1,290,000
10 Kabupaten Purwakarta Rp5,990,000 Rp4,830,000 Rp5,810,000 Rp5,870,000 Rp4,730,000 Rp2,590,000 Rp2,340,000 Rp2,220,000 Rp2,360,000 Rp1,470,000 Rp1,370,000
11 Kabupaten Subang Rp7,450,000 Rp5,640,000 Rp7,310,000 Rp7,230,000 Rp5,500,000 Rp3,350,000 Rp2,710,000 Rp2,580,000 Rp3,100,000 Rp1,720,000 Rp1,610,000
WILAYAH II
1 Kabupaten Bandung
Barat
2 Kabupaten Bandung
3 Kota Bandung
4 Kota Cimahi
5 Kabupaten Garut Rp4,770,000 Rp3,690,000 Rp4,310,000 Rp4,300,000 Rp3,400,000 Rp2,040,000 Rp1,830,000 Rp1,740,000 Rp1,860,000 Rp1,170,000 Rp1,110,000
6 Kabupaten Tasikmalaya Rp5,390,000 Rp4,250,000 Rp5,380,000 Rp5,320,000 Rp3,760,000 Rp2,250,000 Rp1,970,000 Rp1,870,000 Rp2,070,000 Rp1,260,000 Rp1,190,000
7 Kota Tasikmalaya Rp5,620,000 Rp4,890,000 Rp5,710,000 Rp5,640,000 Rp4,860,000 Rp3,010,000 Rp2,160,000 Rp2,050,000 Rp2,340,000 Rp1,460,000 Rp1,290,000
8 Kota Banjar Rp5,580,000 Rp4,410,000 Rp5,210,000 Rp5,140,000 Rp4,130,000 Rp2,160,000 Rp1,740,000 Rp4,130,000 Rp2,020,000 Rp1,190,000 Rp1,060,000
9 Kabupaten Ciamis Rp5,970,000 Rp4,900,000 Rp5,780,000 Rp5,660,000 Rp4,480,000 Rp2,990,000 Rp2,200,000 Rp2,090,000 Rp2,820,000 Rp1,430,000 Rp1,330,000
10 Kabupaten Pangandaran Rp4,890,000 Rp4,180,000 Rp4,790,000 Rp4,690,000 Rp3,540,000 Rp2,290,000 Rp1,860,000 Rp1,790,000 Rp1,740,000 Rp1,290,000 Rp1,150,000
11 Kabupaten Kuningan
12 Kabupaten Indramayu Rp6,750,000 Rp4,980,000 Rp5,670,000 Rp5,440,000 Rp4,930,000 Rp2,420,000 Rp2,260,000 Rp2,190,000 Rp2,210,000 Rp1,460,000 Rp1,380,000
13 Kabupaten Majalengka Rp6,110,000 Rp4,470,000 Rp5,470,000 Rp5,340,000 Rp4,460,000 Rp2,660,000 Rp2,220,000 Rp2,140,000 Rp2,490,000 Rp1,420,000 Rp1,360,000
14 Kota Cirebon
15 Kabupaten Sumedang Rp5,000,000 Rp3,840,000 Rp4,890,000 Rp4,620,000 Rp3,460,000 Rp2,060,000 Rp1,780,000 Rp1,700,000 Rp1,900,000 Rp1,150,000 Rp1,100,000
16 Kabupaten Cirebon
Siteplan
Rencana
pelakasanaan
Tahap 2
Lingkup Pekerjaan Kontruksi Tribun Timur :
No Pekerjaan Persiapan Perkerjaan Struktur Pekerjaan Arsitektur Pekerjaan MEP
1 Pekerjaan Persiapan ( mobilisasi Pondasi Tiang Pancang Pekerjaan dinding ( Pas. Plumbing ( air Bersih,
alat, Pengukuran, Dokumentasi Bata, Plesteran, acian, Air Bekas, Air kotor,
dan administrasi) dan Hand railing) Sanitary dan Air
hujan)
2 Pekerjaan Tanah ( galian, urugan Pekerjaan Lantai lantai Tata Udara ( instalasi
pasir dan buangan) keramik Wc, Dinding dan Exhaust fan)
WC, dan lantai epoxy)
3 Under Struktur ( Pile cap, Tie Pengecatan (dinding Hydrant ( instalasi
beam, Pondasi Batu Belah dan Plat interior, exterior) Hydrant dan Instalasi
lantai) Sprinkler
5 Pekerjaan Tangga
Lingkup Pekerjaan Kontruksi Tribun Timur :