KEEP IT SAFE WITH
eon)
+ Don't walk on blocks, Use footboards for
workmen.
install temporary supports before placing
ks om planks.
fuse clacked or damaged blocks on
os,
+ Prevent “bulking up” of wet concrete when
pouring topping.
+ Use recommenced method for removing \
In cases were cambers or aional
relforcements are required, e's recommended to
‘consuls ABEL/Bestcrete ofa structural engines.
To determine the Uniformly Distributed Imposed
Load (UDI), hekness of concrete required and
‘ich ile locks an plank types to use, Se the
{ables inside this brochure o tak to ABEL/Bestcrete
[ivexecnmuren!
‘OMNIA FLOORING SYSTEM &
‘COMPETING FLOORING SYSTEMS
tee peg
Fer Rete ntrmato, please contact ABEL Beste at
‘ype ering sem (642-4703/4725
‘rou Projects Deparert at
(624-8061 /625-937
‘ema abel projecteansaea.com
Note: This price comparson chart has been derived
from costs related o one (pial span fr domestic
Dalaings-
IGHTWEIGHT4
| CONCRETE FLOORING SYSTEMCeara) 20h libs
1. lo Table |, determine te Uniorly Disb
Imposed asa (UD) depending upon the pe ot
bling ana Hoorn
2. fom able cee peo ie Nats you
3. Fom the ight sie of Table 2, choose he type of
foo rsh dered, and eaing arose om the Mh
Soul area a ange of maim ss apa
“onespondng to varices concrete topping
4. .eoming the Span fe ian your pa
ng hoe sconce epg wich
nk pe: da cf ich ave gen nae 3
‘resng purposes
6 The recmended mesh eforcement in he
“anu loping ss shown inTole 2 Mere
“uta mes renorcamen for aus
(Rknesses oftopaing sea town ASS for
PAB Als? or and A193 or & 6 toppings
‘sume tat ou ae choosing the ABEL /Bestcrete
‘Sra oor ytem ra oneing on ws pn of
"eand you have Secied 0 ues ea fat hh
sd gone not ner oc
From Tale 1, the appiable UDI s 30
(GBF, en con eng 030°
Scone ir tos You sot at here
v
{esos creping wth dhe sosenwrazzo Sach,
‘ich om reresing diferent concrete oping You
whe,
‘Step 3-
‘Checlng te cel conesponding tothe 2 ck oping.
You wilex-Upto 12 rand" 13 whe mest
‘hath the ccs olds, i ad otk ype you
hive made. the yet woud pan fo 12 Re oe
Dank isused and upto V3 fe pel planks sea wih
fhesane 2 topeng.
Step 4-
Shee your actual span 11:6 22 topping wth 2p
Plank cpa sping 12 out be opt Fr is
‘epping hen, ne recommenced mech aoe
reorerent #6 Be
step 5-
{Coto Table 3 to get the plank deals or orden ae
‘hecing pcs Ys lps tat san ope as
“Trig which means tae plank contains 2 hgh trate
‘earings each 2m nomial are
TABLE 1 - Typical Live Loads Applicable to Various Usages
Notes:
UNIFORMIY DISTRIBUTED
Fire oF nupine | ust oF Loon | MPORMIY OSTRIUTED| se nme the
eee image bling yes an oe
owes, Hoss. | Bedrooms ~ ‘Bisibuedmpose Lost
sons Cae nts ‘er balan pes afoot
rs esas sain ~ Seiten
sais te wer to consult ABEL /Bestrete
scl engney fo reese denon,
pene tgs cng oe yes clng
PTT eee ken eed
Tae Type of Hollow Boos pect
= wont
nals toed Bia? To ea coon | Fay [ey |e coan] wae irom |e Ges] eae Ge cay [a Smal
|with Mesh Reinft. Y bad = | a z Pa he
‘asrem | totem Mtevm | owism | tswiem | tote
(1tayers eonacs | 325i, ee : Le ‘ee an ‘itozom | ootaao | iewinm | weabe
pa ae a ee cay ieee5 Asin | pre i2@ ope [eee —
eeeeee (Ean ree ewe pee evel Wee ta |ieia | Seramie
or ae Eee tro Soom HEHE] Symes
eam | RES a eee c8, eon | gees towe-oat
Tenn [meas | Grea pearae | azsnl| zeal cas nae
a | area eae
em tal or
(layer # 66.BRC) | 14201600 | Yom iem | upwiem | 1M | uw rey Uw i¢@ | Upw 120 BOM) eae
Bocaire | area, sua |soas | ous | __
roo - sei |
a aa Geog irs re oe Teme
3 GA 0 120 upwi20 | tpwiem | up ion
owe Ne SEER] coame
| (riper 89 soaat gets : ons
| sal ene Aaa Beostneseeppe | TEER | EWS |REUS REESS MRE TESER | rome -mom
E ore amd see eean Tena
2 pre 1h Up 10m eH
pe oa beggtk-+> (qa er tose Some
Peat Sr Fas [ESS er Sree
eee Bre aa meas Tower tow
So Sam ame
ou 7
Notes
irae er eee ea nee ee a oe ee
Tei ae eet eee es eae EO
ee ee a ri cea ed
ea eee en ee A Seat eee ea
Se octaeresal ines mr Seas an
Se ee a eae) eee
ESE ee ad
MAIN Notes:
ae REINFORCEMENT. 4 Concrete covert reforcement is 25mm generals 4. concrete plank mensions ate all 2 deep x "wise
1 72 1 Concrete abe cating sent 25 Ni eae salen varios lengths depending spon
o ane Ve srengh of renorcement 60 Nim Riemer ane
m m6. *fetdnowninane 3” Porempedde op bas ae[flooring system above all others - Om from
[ABEL /Bestrete. Easy to instal and igher than
‘gular concrete flooring, the Orla flooring System
{5 Ieal fr all sorts of building projets, including
rmull-storeystuctores.
The Oranla Rooring System has established an
‘excellent ack record throughout the word going
back to 1945, W's been wsed successflly In
everything from homes and schools fo offices and
hospital buildings.
‘The Omnia Roorng System fs a composite for
consisting of
= Mecast 2° X 6" enforced concrete Omnia planks
* Holiow core concrete oF day Ines Bocks
+ Mesh reinforcement
+ Concrete topping
The precast reinforced concrete Omnia planks are
postoned a certaln fixed spacings ae the nile
Biodks are plsced between them. The mesh
reinforcement and concrete are then aed to complete
the system which provides a structurally sound Noo
Installation te qucker as al components ae made
‘advance and zo takes but a faction of the time normally
required for other Roorng systems,
‘Cost savings are realize! because less materials and
les labour are required on ste and savings can be
achieve in terms of faring and foundation cos.
STEP 1 Erection of planks and blocks
4 Place Orla plans a ec cenfes (22 for clay
nd 24” fr concrete Blocks with a mininum 3
Feston both enc.
STEP 2 Pacing of concrete
Wet surfaces of blocks an planks thoroughly.
B. Pour concrete (Use footboard for workmen's
safety)
> Install temporary supports every to sunport
« Place ifiler locks betwen planks. (Remember
otto wall on block)
4. Pace fangs, services duct etc and mesh
teinforcement within the Span and over suppeets.
STEP 3 - Removal of props
"Props shoul emaln und concrete has
suilenty matured,
Note: Please consult ABEL/Besteret for moc®