Note = Green Block are job list that can be done this week
NO.
EQUIPMENT NO EQUIPMENT NAME
Urut
1. RETNAWAN W.
2. ALI AMAR
TECHNICAL ASPECTS
QUARRY
1 29A_BC ST05/07 OLBC
2 291_ST1 stacker premix
3 29A_BC ST03 OLBC
4 29A_BC OLBC
2 CMS gearbox
RAW MILL 2
1 321_RE1 reclaimer
2 231_ST1 stacker
3 CMS gearbox
4 332_WF2 WF silica
KILN
3 CMS gearbox
4 L61_BH1 _T1 Inlet bag house temp
5 L61_BH1 _T2 outlet bag house temp
FINISH MILL 1
1 561_2k1 dust monitor
3 CMS gearbox
FINISH MILL 2
1 CMS gearbox
2 512_GB1_T7 temp gearbox
PACKING & PORT
1 671_PZ1 Palletizer
3 Palletizer port
4 612_LM1 cement Bulk loading
5 613_LM1 cement Bulk loading
7 612_DGB gate
8 611_EV2 ev silo 1
PROBLEM REASON
- need maintenance
ropeactive but not indication on HMI -
roller drift switch menyentuh frame original from prohject
- -
pembacaan lebih rendah dari actual wisdom rusak
pembacaan stuck spring/sensor kotor
pembacaan stuck spring/sensor kotor
muncul flowrate saat stop wisdom rusak
blocking di chute inlet mill -
installasi di luar ruangan -
kabel getas/bad resistance lifetime
- schedule kalibrasi
- -
installasi di luar ruangan -
kabel getas/bad resistance lifetime
- new project
signal from profibus sometime error induction from high voltage cable
blank Indication
move to preheater -
- improvement
drift switch not intalled the sensor holder hit when the SL
moves
improvement
PC error dusty place
PC error dusty place
cant close -
record BoM
high temperature not show indication original project
4. DISCUSSION OF IMPROVEMENT
ALDO
rewiring and make new program RIZKI & FARIZ
Year : 2020
support damper
OPEN broken, need check
by mech
30-Jul-20 OPEN Waiting spare part
Undang vendor
OPEN untuk
pebgerjaannya
OPEN STOP PMR
1-Sep-20 30-Sep-20 OPEN wating spare part
17-Oct-20 23-Oct-20 OPEN tunggu stop
17-Oct-20 23-Oct-20 OPEN tunggu stop
OPEN wating spare part
11/125/2020 30-Sep-20 OPEN tunggu stop
26-Nov-20 30-Dec-20 OPEN buat ISR ke yusup
30-Dec-20 OPEN Waiting spare part
22-Jun-20 OPEN
29-Jun-20 OPEN
30-Jul-20 OPEN Waiting spare part
material tidak bisa
28-Sep-20 28-Nov-20 OPEN di stop dengan pin
gate
19-Nov-20 30-Sep-20 OPEN
26-Nov-20 30-Dec-20 OPEN buat ISR ke yusup
30-Dec-20 OPEN Waiting spare part
Waiting sensor
OPEN
Ready
waiting kiln
16-Jun-20 OPEN production to
stabilize
on progress check
OPEN
by vendor
16-Jun-20 OPEN
OPEN
22-Jun-20 16-Aug-20 OPEN
22-Jun-20 23-Aug-20 OPEN
proses check sens
22-Jun-20 16-Aug-20 OPEN receive program
PLC-DCS
22-Aug-20 30-Aug-20 OPEN
OPEN
OPEN
list of work progress
OPEN on another excel
page
OPEN
OPEN
OPEN
OPEN
PLANT : BAYAH
DEPARMENT : ELECTRICAL & INSTRUMENT
INSTRUMENT SECTION
NO.
EQUIPMENT NO EQUIPMENT NAME
Urut
1. RETNAWAN W.
2. ALI AMAR
TECHNICAL ASPECTS
2 CMS gearbox
1 321_RE1 reclaimer
2 231_ST1 stacker
3 CMS gearbox
4 332_WF2 WF silica
1 Camera Cooler
2 471_BQ1 Air blaster inlet cooler
3 471_EP1_P1 pressure inlet EP
4 471_FNF_VA1 Damper FNF
3 CMS gearbox
4 L61_BH1 _T1 Inlet bag house temp
5 L61_BH1 _T2 outlet bag house temp
1 CMS gearbox
2 512_GB1_T7 temp gearbox
2 Palletizer port
3 612_LM1 cement Bulk loading
4 613_LM1 cement Bulk loading
6 612_DGB gate
7 611_EV2 ev silo 1
PROBLEM REASON
QUARRY
- need maintenance
roller drift switch menyentuh frame original from prohject
Base or munting encoder OLBC broken -
safety rope switch tidak terinstal bawaan project
hanya muncul general alarm design project
- schedule kalibrasi
- new project
signal from profibus sometime error induction from high voltage cable
FINISH MILL 1
move to preheater -
can't showing measurement value -
hanya muncul general alarm design project
hanya muncul general alarm design project
FINISH MILL 2
can't showing measurement value -
spike wisdom rusak
PACKING & PORT
drift switch not intalled the sensor holder hit when the SL
moves
improvement
PC error dusty place
PC error dusty place
cant close -
record BoM
backup All parameter equipment not have backup file
SOP manual operation RF , selenoid belum ada SOP
List alarm penyebab fault belum ada list
1. REVIEW ACTION PLANT
2. UPDATE PART
3. PROBLEM LIST
4. DISCUSSION OF IMPROVEMENT
QUARRY
Maintenance all safety device and panel Ulum ARIF
reposisi, modifikasi roller drift ALFIAN RIFAL
replace done. Make isr to mekanik for fabrikasion -
install improvement RIFAL ASLAM
improve dengan menampilkan spesifik alarm RIFAL ASLAM
kalibrasi ADIT
FINISH MILL 1
repair old sensor ULUM
check actual sensor FAIZ HUDA
improve dengan menampilkan spesifik alarm RIFAL HUDA
improve dengan menampilkan spesifik alarm RIFAL HUDA
FINISH MILL 2
check actual sensor FAIZ HUDA
replace HUDAASLAM
PACKING & PORT
ALDO
list and take picture all HMI all paramter equipment alfian
buat SOP dan tempel di panel ER -
buat LIST alarm penyebab Fault Faiz
Week/Date : 02/04 January 2021
support damper
OPEN broken, need check
by mech
30-Jul-20 OPEN Waiting spare part
Undang vendor
OPEN untuk
pebgerjaannya
1-Sep-20 30-Sep-20 OPEN wating spare part
17-Oct-20 23-Oct-20 OPEN tunggu stop
17-Oct-20 23-Oct-20 OPEN tunggu stop
09.01.21 selesai
CLOSE
check
09.01.21 ubah
11/125/2020 30-Sep-20 CLOSE
delay 5 ke 4s
26-Nov-20 17-Jan-21 OPEN buat ISR ke yusup
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
30-Jan-21 OPEN
30-Jan-21 OPEN
30-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
OPEN
OPEN
30-Jul-20 OPEN Waiting spare part
material tidak bisa
28-Sep-20 OH 2021 OPEN di stop dengan pin
gate
3-Dec-20 OPEN Waiting spare part
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
30-Jan-21 OPEN
30-Jan-21 OPEN
30-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
waiting kiln
OH 2021 OPEN production to
stabilize
on progress check
OPEN
by vendor
OPEN
22-Jun-20 16-Aug-20 OPEN
22-Jun-20 23-Aug-20 OPEN
proses check sens
22-Jun-20 16-Aug-20 OPEN receive program
PLC-DCS
22-Aug-20 30-Aug-20 OPEN
5.01.2021 replace
OPEN
ke pneumatic
4-Oct-20 OPEN prepare peralatan
baru di instal
12-Jan-21 OPEN
bottom drift
10-Dec-20 12-Jan-21 OPEN
23-Jul-20 OPEN
22-Jun-20 OPEN
OPEN
OPEN
OPEN
OPEN
PLANT : BAYAH
DEPARMENT : ELECTRICAL & INSTRUMENT
INSTRUMENT SECTION
NO.
EQUIPMENT NO EQUIPMENT NAME
Urut
1. RETNAWAN W.
2. ALI AMAR
TECHNICAL ASPECTS
2 CMS gearbox
1 321_RE1 reclaimer
2 231_ST1 stacker
3 CMS gearbox
4 332_WF2 WF silica
3 CMS gearbox
4 L61_BH1 _T1 Inlet bag house temp
5 L61_BH1 _T2 outlet bag house temp
1 CMS gearbox
2 512_GB1_T7 temp gearbox
2 Palletizer port
3 612_LM1 cement Bulk loading
4 613_LM1 cement Bulk loading
6 612_DGB gate
PROBLEM REASON
QUARRY
- need maintenance
roller drift switch menyentuh frame original from prohject
Base or munting encoder OLBC broken -
safety rope switch tidak terinstal bawaan project
hanya muncul general alarm design project
rope aktif limit di jumper LIMIT RUSAK
Panel korosi lifetime
- project
RAW MILL 1
- schedule kalibrasi
- new project
signal from profibus sometime error induction from high voltage cable
FINISH MILL 1
move to preheater -
can't showing measurement value -
hanya muncul general alarm design project
hanya muncul general alarm design project
FINISH MILL 2
can't showing measurement value -
spike wisdom rusak
PACKING & PORT
drift switch not intalled the sensor holder hit when the SL
moves
improvement
PC error dusty place
PC error dusty place
cant close -
indikasi runing sempat lepas kabel terdapat sambungan
- ISR
UTILITY
wrong controll power original project
antene not installed
wiring from sinoma, can't show
troubleshooting for safety device need to much time indication when sensor or cable
damage
record BoM
backup All parameter equipment not have backup file
List alarm penyebab fault belum ada list
1. REVIEW ACTION PLANT
2. UPDATE PART
3. PROBLEM LIST
4. DISCUSSION OF IMPROVEMENT
QUARRY
Maintenance all safety device and panel Ulum ARIF
reposisi, modifikasi roller drift ALFIAN RIFAL
replace done. Make isr to mekanik for fabrikasion -
install improvement RIFAL ASLAM
improve dengan menampilkan spesifik alarm RIFAL ASLAM
replace dan check fungsi rifal Aldo
replace panel DIDIK ULUM
RAW MILL 1
kalibrasi ADIT
FINISH MILL 1
repair old sensor ULUM
check actual sensor FAIZ HUDA
improve dengan menampilkan spesifik alarm RIFAL HUDA
improve dengan menampilkan spesifik alarm RIFAL HUDA
FINISH MILL 2
check actual sensor FAIZ HUDA
replace HUDAASLAM
PACKING & PORT
UTILITY
rewiring ALDO RIZKI
install antene HUDA/RIFAL
modification wiring when possible WILDAN
ALDO
list and take picture all HMI all paramter equipment alfian
buat LIST alarm penyebab Fault Faiz
Week/Date : 02/04 January 2021
support damper
OPEN broken, need check
by mech
30-Jul-20 OPEN Waiting spare part
Undang vendor
OPEN untuk
pebgerjaannya
1-Sep-20 30-Sep-20 OPEN wating spare part
17-Oct-20 23-Oct-20 OPEN tunggu stop
17-Oct-20 23-Oct-20 OPEN tunggu stop
26-Nov-20 17-Jan-21 OPEN buat ISR ke yusup
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
30-Jan-21 OPEN
30-Jan-21 OPEN
30-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
OPEN
OPEN
30-Jul-20 OPEN Waiting spare part
material tidak bisa
28-Sep-20 OH 2021 OPEN di stop dengan pin
gate
3-Dec-20 OPEN Waiting spare part
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
30-Jan-21 OPEN
30-Jan-21 OPEN
30-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
17-Jan-21 OPEN
waiting kiln
OH 2021 OPEN production to
stabilize
on progress check
OPEN
by vendor
OPEN
22-Jun-20 16-Aug-20 OPEN
22-Jun-20 23-Aug-20 OPEN
proses check sens
22-Jun-20 16-Aug-20 OPEN receive program
PLC-DCS
22-Aug-20 30-Aug-20 OPEN
4-Oct-20 OPEN prepare peralatan
baru di instal
12-Jan-21 OPEN
bottom drift
10-Dec-20 12-Jan-21 OPEN
stungguselesai
30-Jan-21 OPEN
mekanik install pipa
23-Jul-20 OPEN
22-Jun-20 OPEN
list of work progress
OPEN on another excel
page
OPEN
OPEN
OPEN