The document outlines a work breakdown schedule for a construction project including 15 items with descriptions, contract amounts, activity codes, and estimated days to complete each item. The total contract amount for all 15 items is $2,911,372.26.
The document outlines a work breakdown schedule for a construction project including 15 items with descriptions, contract amounts, activity codes, and estimated days to complete each item. The total contract amount for all 15 items is $2,911,372.26.
The document outlines a work breakdown schedule for a construction project including 15 items with descriptions, contract amounts, activity codes, and estimated days to complete each item. The total contract amount for all 15 items is $2,911,372.26.
NO. AMOUNT 1.0 SITE PREPARATION AND EARTHWORKS 55,489.86 A 10 2.0 CONCRETE WORKS 310,554.15 B 20 3.0 FORMWOKS AND SCAFFOLDINGS 191,202.67 C 5 4.0 MASONRY WORKS 255,673.23 D 15 5.0 STEEL WORKS 204,910.28 E 10 6.0 TILING WORKS 111,530.74 F 7 7.0 CARPENTRY WORKS 85,452.16 G 7 8.0 ELECTRICAL WORKS 148,145.99 H 5 9.0 PLUMBING AND SANITARY WORKS 111,786.70 I 7 10.0 INSTALLATION OF DOORS AND WINDOWS 139,976.88 J 4 11.0 PAINTING WORKS 137,019.22 K 5 12.0 STONE WORKS 29,467.10 L 3 13.0 ROOFING WORKS 414,946.70 M 15 14.0 FENCING 569,818.51 N 15 15.0 LANDSCAPING 145,398.07 O 7