WORK BREAKDOWN SCHEDULE

ITEM DESCRIPTION CONTRACT NODES DAYS


NO. AMOUNT
1.0 SITE PREPARATION AND EARTHWORKS 55,489.86 A 10
2.0 CONCRETE WORKS 310,554.15 B 20
3.0 FORMWOKS AND SCAFFOLDINGS 191,202.67 C 5
4.0 MASONRY WORKS 255,673.23 D 15
5.0 STEEL WORKS 204,910.28 E 10
6.0 TILING WORKS 111,530.74 F 7
7.0 CARPENTRY WORKS 85,452.16 G 7
8.0 ELECTRICAL WORKS 148,145.99 H 5
9.0 PLUMBING AND SANITARY WORKS 111,786.70 I 7
10.0 INSTALLATION OF DOORS AND WINDOWS 139,976.88 J 4
11.0 PAINTING WORKS 137,019.22 K 5
12.0 STONE WORKS 29,467.10 L 3
13.0 ROOFING WORKS 414,946.70 M 15
14.0 FENCING 569,818.51 N 15
15.0 LANDSCAPING 145,398.07 O 7

TOTAL 2,911,372.26