OWNER- CHERINET DUGASA MORKA

A. Substructure BIRR
1 Excavation and earth work 78,938.63
2 Masonry work 119,973.14
3 Concrete Work 113,051.38
4 Form Work 21,844.53
5 Steel Reinforcement 43,370.61
TOTAL A 377,178.30

B. Superstructure
1 Concrete Work 64,980.00
2 Form Work 44,108.95
3 Steel Reinforcement 60,869.38
4 Block Work 188,648.91
5 Roofing 134,641.49
6 Carpentry and joinery 7,777.31
7 Metal Work 107,032.50
8 Finishing 501,218.28
9 Glazing 14,015.18
10 Painting 104,275.41
11 Sanitary Installation 119,134.48
12 Electrical installation 30,726.12
TOTAL B 1,377,428.01
GRAND TOTAL A+B 1,754,606.31
VAT(15%) 263,190.95
GRAND TOTAL WITH VAT 2,017,797.25