Client :- Gondar University

Consultant :- Yohannes Abay Consulting Architects & Engineers


Contactor:-Unity Engineering
Project:-Cancer Treatment Center page 186

SUMMARY OF VARIATION WORK ORDER NO.03

ITEM NO DESCRIPTION AMOUNT REMARK

1 Sub-surface Drainage system,Magnesium Board


2,078,257.12

2 ACCESS ROAD 327,414.30

TOTAL 2,405,671.42

15% VAT 360,850.71

GRAND TOTAL 2,766,522.13

We Zeleke Tadesse and Animut Yalew certify that the above figures are correct and that the total value of work executed and/or
materials supplied to date is birr 2,405,671.42(Two Million Four Hundred Five Thousand Six Hundred Seventy One Birr and 42 Cents
Only)

__________________________
__________________________ Supervisor
Contractor Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Asfe Jejaw
Project:- Cancer Treatment Center
Client:- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering Page 187
Summary of Statement of Variation order 1
Sub total (Birr) Total Sum (Birr)
Item No. Description
Contract Executed Contract Executed

Sub-surface Drainage system,Magnesium Board


& Expansion Joint filler

1 Pipe Laying 40,732.50 32,051.85

Provide 5cm thick and 50-80cm wide lean concrete under


2 dia160mm semi slotted/ perforated UPVC pipe 12,971.20 15,353.80
3 Borrowed Fill Materials,D=0.25H 187,243.50 136,462.24

4 Coarse Aggregate, Size 40-70mm,D=0.45H 194,204.00 225,295.44

5 Coars Aggregate, Size 20-30mm, D=0.3H 144,483.46 177,843.18

6 Geosynthetic: 191,746.05 163,291.97


7 Dump Proofing Material 314,964.72 321,720.57
8 Single Layer Brick or Protection Board: 299,195.95 291,505.97
9 Magnisum Board 225,968.24 234,254.60
10 Expansion Joint Filler 127,943.27 15,731.17
11 Double Brick wall 25 cm thick(1:3) 595,904.70 464,746.34
Sub Total (A) 2,335,357.58 2,078,257.12
ACCESS ROAD
A. SUB-STRUCTURE

11 Excavation and Earth work 77,308.50 24,865.80

12
Concrete work 447,862.86 220,027.40
13 Masonry work 45,364.00 36,289.00
14 Plastering & Pointing 11,232.00 8,985.60
15 Curb stone 46,558.80 37,246.50
Sub Total (B) 628,326.16 327,414.30
Total (A+B) 2,963,683.74 2,405,671.42

Grand total 2,963,683.74 2,405,671.42

We Zeleke Tadesse and Animut Yalew certify that the above figures are correct and that the total value of work executed and/or materials supplied to date is birr 2,405,671.42(Two Million Four
Hundred Five Thousand Six Hundred Seventy One Birr and 42 Cents Only)

__________________________ __________________________
Contractor Supervisor
Asfe Jejaw Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center

Client :- University of Gondar Page 188


Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
Variation work order -One
QUANTITY AMOUNT
Item
DESCRIPTION UNIT CONTRACT EXCUTED CONTRACT EXCUTED
No. UNIT PRICE
QUANTITY QUANTITY AMOUNT AMOUNT

12.SANITARY INSTALLATION

Sub-surface Drainage system

Pipe Laying

Supply.lay and connect semi-slotted/perforated


UPVC Pipe,PN-16,dia .a60mm, min wall
thickness 11.9mm,2slots shall staggered on top
half perimeter of UPVC pipe complete with all
the necessary accessories ,bends and fittings,
method of welding shall comply with the
requirements of BS-5011 or DIN8062 or
1
equivalent institution.
Maximum Slot Length: 65mm
Maximum Slot width:4mm
Minimum no of slots per m(row) :13
Pitch (spacing b/n slots in arow) no of slots per
m(row) :75mm
Minimum Slot Area : 4914mm2/m
ml 147.48 116.05 276.19 40,732.50 32,051.85
Provide 5cm thick and 50-80cm wide lean
2 concrete under dia160mm semi slotted/
perforated UPVC pipe m2 117.92 139.58 110.00 12,971.20 15,353.80

Filter Material
Supply and fill filter materials in layers in
accordance with the detail drawing given.The
materials shall be washed ,clear and freeof any
dust ,mud,suspended materials ,etc.not to reduce
the void area of the filter materials .

3 Borrowed Fill Materials,D=0.25H m3 1248.29 909.75 150.00 187,243.50 136,462.24


4 Coarse Aggregate, Size 40-70mm,D=0.45H m3
255.72 296.66 759.44 194,204.00 225,295.44

5 Coars Aggregate, Size 20-30mm, D=0.3H m 3

190.25 234.18 759.44 144,483.46 177,843.18

Geosynthetic:

.Supply andwrap a uv
stabilized ,polypropylene,needle
punched ,woven ,geotextile geosunthetic
intended use for filtration +separation +Drainage
in accordance with the given drawing .The
materia shall achieved EN13252 Test method
and have hydraulic property of :
6 Weight :280g/m2 Geotextile Water
Flow Capacity :(5-10)%<characteristic water
flow rate Soil retention
Capacity:(AOS)<D

m2 1506.49 1,282.94 127.28 191,746.05 163,291.97


Dump Proofing Material
Supply and fix 4mm thick APP
7 modified ,polysterand Slates water proofing
memebrane to concrete retaining wall
m2 821.29 838.91 383.50 314,964.72 321,720.57

Single Layer Brick or Protection Board:

Supply and fix 5mm thick double reinforced


Bitu board memebrane protection to protect
8 damp proof memebrane
m2 821.29 800.18 364.30 299,195.95 291,505.97

________________________ ___________________________
Contractor Supervisor/Inspector
Asfe Jejaw Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center

Client :- University of Gondar Page 189


Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
Variation work order -One
QUANTITY AMOUNT
Item
DESCRIPTION UNIT EXCUTED
No. UNIT PRICE
CONTRACT QUANTITY CONTRACT EXCUTED
QUANTITY AMOUNT AMOUNT

Magnisum Board /m2

10mm thick section Double or single Top plate


(wood) ;wooden stud and wooden Bottom plate
and also its cross section is 40*50mm ,all as
detailed shows. And horizontal applied gypsum
9 board shows paper bound edges at right angle to
framing members.

m2 448.59 465.04 503.73 225,968.24 234,254.60

Expansion Joint filler

Supply and Application of Polyurethane water


10 Ml 476.6 58.60 268.45 127,943.27 15,731.17
proof expansion joint sealant

Construct 25cm thick double brick wall bedded


in 1:3 cement mortar both sides left for furthr
finish. The Brick shall be tested by arecognized
11
laboratory for the specified quality . All testing
expensive shall be covered by the contractor.
Price shall include all incidental workd.
m2 309.36 241.27 1,926.25 595,904.70 464,746.34

TOTAL CARRIED TO SUMMARY 2,335,357.58 2,078,257.12

GRAND TOTAL 2,335,357.58 2,078,257.12

________________________ ___________________________
Contractor Supervisor/Inspector
Asfe Jejaw Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar Page 190
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
QUANTITY AMOUNT
Item
DESCRIPTION UNIT EXCUTED
No. CONTRACT UNIT PRICE CONTRACT EXCUTED
QUANTITY
QUANTITY AMOUNT AMOUNT

A. SUB-STRUCTURE

1. EXCAVATION & EARTH WORK

Bulk excavation in ordinary soil to a depth not


1.1 exceeding 1500mm from reduced level. m3 150.18 120.14 60.00 9,010.80 7,208.40

Pit Excavation in ordinary soil to depth not


1.2 m3 24.09 13.39 60.00 1,445.40 803.40
exceeding 1500mm starting from reduced level.

Excavation for continuous trench to a depth not


exceeding 1500mm.starting from reduced level.
1.3 m3 56.68 45.34 40.00 2,267.20 1,813.60

Fill around foundation and building in non


expansive selected material from site well
rolled and compacted in layers not exceeding
1.4 m3 67.23 2.45 150.00 10,084.50 367.50
200 mm thick.

25cm thick basaltic or equivalent stone hardcore


well rolled, consolidated and blinded with
1.5 crushed stone. m2 495.46 133.39 110.00 54,500.60 14,672.90

TOTAL CARRIED TO SUMMARY 77,308.50 24,865.80

2. CONCRETE WORK

50mm thick lean concrete quality C-5, with


minimum cement content of 150kg of cement
2.1 /m3 concrete.

a) Under Footing pads m3 44.81 24.30 110.00 4,929.10 2,673.00

Reinforced concrete quality C-30,400kg of


cement/ m3 filled into form work and vibrated
around rod reinforcement.(Reinforcement bar
2.2 and formwork measured separately) Use OPC
42.5N Or Above (Ordinary Portland Cement)

b For 10cm thick bottom slab for ditch m3 3.2 2.56 2,500.00 8,000.00 6,400.00

c For 10cm thick concrete walk way m3 48.08 10.78 2,500.00 120,200.00 26,950.00

e In Shear Wall m3 35.35 19.35 3,050.00 107,817.50 59,017.50

Provide, cut and fix in position sawn structural


2.3 wood or steel formwork whichever is
appropriate;

a) shear wall
m2 210.45 13.13 150.00 31,567.50 1,969.50

________________________ ___________________________
Contractor Supervisor/Inspector
Asfe Jejaw Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar Page 191
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering

QUANTITY AMOUNT
Item
DESCRIPTION UNIT CONTRACT EXCUTED CONTRACT EXCUTED
No. UNIT PRICE
QUANTITY QUANTITY AMOUNT AMOUNT
Mild Steel reinforcement according to Structural
Drawings and Technical Specifications. Price
2.4 includes cutting, bending, placing in position and
tying wires.

a) Dia 8mm deformed bar


kg 1890.46 1,441.08 32.00 60,494.72 46,114.56

b) Dia 12mm deformed bar


kg 2393.94 1,499.03 36.00 86,181.84 53,965.08

c) Dia 14mm deformed bar


kg 796.45 637.16 36.00 28,672.20 22,937.76

TOTAL CARRIED TO SUMMARY 447,862.86 220,027.40

3. MASONRY WORKS

Construct 50cm thick trachytic or equivalent


3.1 stone masonry foundation wall bedded in
cement sand mortar ratio 1:3

a) Below Natural Ground Level (BNGL) m3 41.24 32.99 1,100.00 45,364.00 36,289.00

TOTAL CARRIED TO SUMMARY 45,364.00 36,289.00

4. PLASTERING & POINTING

Apply two coats of plastering in cement sand


mortar (1:3) to walls surfaces as per the
drawings and. Price shall include pre-cleaning
and preparation of the surface.

a) To external wall surface.


m2 86.4 69.12 130.00 11,232.00 8,985.60

TOTAL CARRIED TO SUMMARY 11,232.00 8,985.60

5. Curb stone

a) for walk way m 172.44 137.95 270.00 46,558.80 37,246.50

TOTAL CARRIED TO SUMMARY 46,558.80 37,246.50

GRAND TOTAL 628,326.16 327,414.30

________________________ ___________________________
Contractor Supervisor/Inspector
Asfe Jejaw Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
VARIATION ORDER ONE
page 192
NO Size Qty Description NO Size Qty
12. SANITARY INSTALLATION Bunker
Sub-surface Drainage System 1 28.97 On axis H (1-5)
Pipe Laying 1.31
0.86 32.64 m3
1. Supply,lay and connect semi-slotted/ perforated
UPVC pipe , PN-16, dia. 160mm, min wall thickness
11.9mm,2slots shall staggered on top half perimeter On axis H b/n 9-12
1 18.50
of UPVC pipe complete with all the necessary 1.26
accessories ,bends and fittings ,method of welding
shall comply with the requirements of BS-5911 or 0.97 22.54 m3
DIN8062 or equivalent institution .
1 18.50
Maximum Slot Length:65mm 5.03
Maximum Slot Width:4mm 1.26 116.78 m3
Minimum no of slots per m(row):13
pitch (Spacing b/n slots in arow ) no of slots 1 27.80 On axis 12 b/n H-L
per m(row) :75mm 1.61
Minimum Slot Area :4914mm2/m 0.97 43.29 m3
On axis F(1-8)
1 30.15 30.15 ml 1 27.80
6.43
On axis F(8-3') 2.27 404.88 m3
1 55.80 55.80 ml
1 8.02 b/n axis K-L & 12-13
Bunker 1.60
On axis H (1-5) 0.97 12.43 m3
1 30.10 30.10 ml
1 8.02
116.05 ml Grand Total 6.40
1.13 57.74 m3
2. Provide 5cm thick and 50-80cm wide lean
concrete under dia160mm semi slotted/ perforated 1 8.00 On axis 13 b/n L-M
UPVC pipe 1.22
1 30.15 On axis F(1-8) 0.97 9.46 m3
24.12 m
2
0.80
1 8.00
1 55.80 On axis F(8-3') 6.10
0.80 44.64 m2 2.37 115.41 m3

Bunker 909.75 m Grand Total


3

1 30.10 On axis H (1-5)


24.08 m
2
0.80 4. Coarse Aggregate, Size 40-70mm,D=0.45H
On axis F(1-8)
D=0.45X3.43m
1 29.15
1 62.32 0.93 D=1.54m
46.74 m
2
0.75 1.54 41.75 m3

54.80 On axis F(8-3')


139.58 ml Grand Total 1
Filter Material 0.93
Supply and fill filter materials in layers in 1.54 78.48 m3
accordance with the detail drawing given.
The materials shall be washed ,clear and free 1 28.97 Bunker
of any dust ,mud,suspended materials ,etc. 0.93 On axis H (1-5)
not to reduce the void area of the filter materials . 1.54 41.49 m3
On axis F(1-8) D=0.25X3.43m
3. Borrowed Fill Materials,D=0.25H
1 29.15 1 18.50 On axis H b/n 9-12
1.31 D=0.86m 2.26
0.86 32.84 m3 0.81 33.75 m3

1 54.80 On axis F(8-3') 1 27.80 On axis 12 b/n H-L


1.31 2.89
0.86 61.74 m3 0.81 64.85 m3

_____________________________ ______________________________
Contractor Supervisor
Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
VARIATION ORDER ONE
page 193
NO Size Qty Description NO Size Qty
1 8.02 b/n axis K-L & 12-13 Bunker
2.88 On axis H (1-5)
0.81 18.62 m3 1 32.97
6.39 210.68 m2
1 8.00 On axis 13 b/n L-M
2.75 1 18.50 On axis H b/n 9-12
0.81 17.71 m3 6.84 126.54 m2

296.66 m Grand Total


3
1 27.80 On axis 12 b/n H-L

On axis F(1-8) D=0.3X3.43m 8.24 229.07 m2


5.Coars Aggregate, Size 20-30mm, D=0.3H
1 29.15 1 8.02 b/n axis K-L & 12-13
1.15 D=1.03m 8.21 65.84 m2
1.03 34.53 m3
1 8.00 On axis 13 b/n L-M
1 54.80 On axis F(8-3') 7.91 63.24 m2
1.15
1.03 64.91 m3 1,282.94 m Grand Total
2

Bunker Dump Proofing Material


1 28.97 On axis H (1-5) 7.Supply and fix 4mm thick APP modified ,polyster
1.15 and Slates water proofing memebrane to concrete
1.03 34.31 m3 retaining wall
1 33.15 On axis F(1-8)
1 18.50 On axis H b/n 9-12 3.74 123.98 m2
1.51
0.90 25.12 m3 1 58.80 On axis F(8-3')
3.74 219.91 m2
1 27.80 On axis 12 b/n H-L
1.93 Bunker
0.90 48.26 m3 On axis H (1-5)
1 32.97
1 8.02 b/n axis K-L & 12-13 3.74 123.31 m2
1.92
0.90 13.86 m3 FOR BUNKER
1 18.50 On axis H b/n 9-12
1 8.00 On axis 13 b/n L-M 5.03 92.96 m2
1.83
0.90 13.18 m3 1 27.80 On axis 12 b/n H-L
6.43 178.62 m2
234.18 m3 Grand Total
1 8.02 b/n axis K-L & 12-13
Geosynthetic: 6.40 51.33 m2
6.Supply andwrap a uv stabilized ,polypropylene,
needle punched ,woven ,geotextile geosunthetic 1 8.00 On axis 13 b/n L-M
intended use for filtration +separation +Drainage 6.10 48.80 m2
in accordance with the given drawing .The
materia shall achieved EN13252 Test method and 838.91 m2 Grand Total
have hydraulic property of :
Weight :280g/m2 Geotextile Single Layer Brick or Protection Board:
Water Flow Capacity :(5-10)%<characteristic 8. Supply and fix 5mm thick double reinforced Bitu
water flow rate board memebrane protection to protect damp proof
memebrane
Soil retention Capacity:(AOS)<D
1 33.15 On axis F(1-8) 1 33.15 On axis F(1-8)
6.39 211.83 m2 3.43 113.70 m2

1 58.80 On axis F(8-3') 1 58.80 On axis F(8-3')


6.39 375.73 m2 3.43 201.68 m2

_____________________________ ______________________________
Contractor Supervisor
Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
VARIATION ORDER ONE
page 194
NO Size Qty Description NO Size Qty
Bunker 1 7.02 on axis L' b/n 12-13
On axis H (1-5) 3.90 27.38 m2
1 32.97
3.43 113.09 m2 1 4.02 on axis M b/n 12-13
3.90 15.68 m2
FOR BUNKER
1 18.50 On axis H b/n 9-12 1 1.00 axis b/n L-M & 12-13
5.03 92.96 m2 3.90 3.90 m2

1 27.80 On axis 12 b/n H-L 1 4.31 axis b/n 12-13 & L-M
6.43 178.62 m2 3.90 16.81 m2

1 8.02 b/n axis K-L & 12-13 1 6.00 on axis 13 b/n L'-M
6.40 51.33 m2 3.90 23.40 m2

1 8.00 On axis 13 b/n L-M 465.04 m2 Grand total


6.10 48.80 m2
Expansion Joint filler
800.18 m2 Grand total 10. Supply and Application of Polyurethane water
proof expansion joint sealant
Magnisum Board /m2 axis b/n 2-3 & A-H
9. 10mm thick section Double or single Top plate 1 38.80 38.80 m
(wood) ;wooden stud and wooden Bottom plate and
also its cross section is 40*50mm ,all as detailed
on axis F b/n 2-5
shows. And horizontal applied gypsum board shows
paper bound edges at right angle to framing members. 1 19.80 19.80 m

58.60 m2 Grand total


2 8.47 along axis H &12-10
3.60 60.98 m2 11. Construct 25cm thick double brick wall
bedded in 1:3 cement mortar both sides left
2 6.11 axis b/n I-J &12-10 for furthr finish.The Brick shall be tested by
3.60 43.99 m2 arecognized laboratory for the specified quality .
All testing expensive shall be covered by
2 1.20 axis b/n 11-12 & I-J the contractor. Price shall include all
3.60 8.64 m2 incidental workd.

2 1.94 axis b/n 10-12 & H-I 1 6.70 on axis 8 b/n F-G
3.60 13.97 m2 4.00 26.80 m2

2 11.77 on axis 12 b/n H-J 1 6.55 on axis 6 b/n F-G


3.60 84.74 m2 4.00 26.20 m2

2 8.40 axis b/n 10-11 & H-J -1 1.25 Deduct window


3.60 60.48 m2 0.90 (1.13) m2

1 9.65 b/n axis K-L & 12-13 1 17.45 on axis F b/n 8-4
3.90 37.64 m2 4.35 75.91 m2

1 6.78 on axis M b/n 12-10 -1 1.40 Deduct Door


3.90 26.44 m2 2.20 (3.08) m2

1 1.00 axis b/n L-M & 11-12 -1 0.90


3.90 3.90 m2 2.20 (1.98) m2

1 3.51 axis b/n 11 -12& L-M 1 7.40 axis b/n 6-5 & F-G
3.90 13.69 m2 4.35 32.19 m2

1 6.00 axis b/n 10-11 & L-M -1 1.25 Deduct window


3.90 23.40 m2 0.90 (1.13) m2

_____________________________ ______________________________
Contractor Supervisor
Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
VARIATION ORDER ONE
page 195
NO Size Qty Description NO Size Qty
1 6.55 on axis 4 b/n F-G
4.35 28.49 m2

1 14.75 on axis G b/n 8-4


4.00 59.00 m2

241.27 m2 Grand total

_____________________________ ______________________________
Contractor Supervisor
Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
VARIATION ORDER ONE
page 196
NO Size Qty Description NO Size Qty
01 EXCAVATION & EARTH WORK 1 17.20
1.1 Bulk excavation in ordinary soil to a depth not 2.45 42.14 m2
exceeding 1500mm from reduced level.
1 4.20
3.35 1 12.80
0.35 4.92 m3 3.57 45.70 m2

1 17.20 1 32.00 for ditch


2.45 0.80 25.60 m2
0.35 14.75 m3
133.39 m2 Grand total
1 12.80
3.57 2. Concrete work
0.35 15.99 m3 2.1 50mm thick lean concrete quality C-5, with
minimum cement content of 150kg of cement /m3
concrete.
1 54.00
4.47 a. under Footing pad
0.35 84.48 m3 1 17.20 SW-1
1.10 18.92 m2
120.14 m3 Grand total 1 10.75 SW-2
0.50 5.38 m2
1.2 Pit Excavation in ordinary soil to depth not
exceeding 1500mm starting from reduced level.
24.30 m2 Grand total
for shear wall
1 17.20 (SW-1) 2.2 Reinforced concrete quality C-30,400kg of
1.60 cement/ m3 filled into form work and vibrated
around rod reinforcement.(Reinforcement bar and
0.35 9.63 m3
formwork measured separately) Use OPC 42.5N Or
Above (Ordinary Portland Cement)
1 10.75 (SW-2)
1.00 1 32.00 b. For 10cm thick bottom slab for ditch
0.35 3.76 m3 0.80
0.10 2.56 m3
13.39 m3 Grand total
2.56 m3 Grand total

1.3 Excavation for continuous trench to a depth not


1 4.20 c.For 10cm thick concrete walk way
exceeding 1500mm.starting from reduced level.
4.75
1 32.00 0.10 2.00 m3
1.30
1.09 45.34 m3 1 17.20
2.45
45.34 m3 Grand total 0.10 4.21 m3

1.4 Fill around foundation and building in non 1 12.80


expansive selected material from site well rolled and
3.57
compacted in layers not exceeding 200 mm thick.
0.10 4.57 m3

Around shear wall 10.78 m3 Grand total


1 17.20 (SW-1)
0.25 c. In shear wall
0.35 1.51 m3 1 17.20 Shear wall around wardD
1 10.75 (SW-2) 0.20
0.25 1.88 6.47 m3
0.35 0.94 m 3

1 10.75
2.45 m3 Grand total 0.20
1.5 25cm thick basaltic or equivalent stone hardcore 2.60 5.59 m3
well rolled, consolidated and blinded with crushed
stone.
1 17.20
1 4.20 1.10
4.75 19.95 m2 0.30 5.68 m3

_____________________________ ______________________________
Contractor Supervisor
Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
VARIATION ORDER ONE
page 197
NO Size Qty Description NO Size Qty
1 10.75
0.50
0.30 1.61 m3

19.35 m3 Grand total

2.3 Provide, cut and fix in position sawn structural


wood or steel formwork whichever is appropriate;

1 32.00 a. shear wall


0.40 12.80 m2

1 1.10
0.30 0.33 m2

13.13 m2 Grand total

2.4 Mild Steel reinforcement according to


Structural Drawings and Technical Specifications.
Price includes cutting bending, placing in position
and tying wires.

a) Dia 8mm deformed bar


1,441.08 Kg Current Total

b) Dia12mm deformed bar


1,499.03 Kg Current Total

c) Dia 14mm deformed bar


637.16 Kg Current Total

3. Masonry work
3.1 Construct 50cm thick trachytic or equivalent stone
masonry foundation wall bedded in cement sand
mortar ratio 1:3
a) Below Natural Ground Level (BNGL)
1 32.00 stone masonry work
0.40
1.08 13.82 m3

1 32.00
0.50
1.08 17.28 m3

1 1.00 stone masonry for joint of sw-1 & sw-2


0.70
2.70 1.89 m3

32.99 m3 Grand total

4. PLASTERING & POINTING


4.1 Apply two coats of plastering in cement sand
mortar (1:3) to walls surfaces as per the drawings and.
Price shall include pre-cleaning and preparation of the
surface.
a) To external wall surface.
2 32.00
1.08 69.12 m2
69.12 m2 Grand total

_____________________________ ______________________________
Contractor Supervisor
Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering page 198

Dia
Location Bar No Bar Dia (mm) Bar shape Bar Length No. of bars No of members Dia 10mm Dia 12mm Dia 14mm Dia 16mm Dia 20mm Dia 24mm
8mm
Shear wall around ward D
14 1.35 117 1 157.95
14 2.00 77 1 154.00
12 2.20 140 1 308.00
12 1.85 94 1 173.90
8 1.70 18 1 30.60
14 2.80 4 1 11.20
8 1.30 90 1 117.00
12 1.80 26 1 46.80
12 2.60 144 1 374.40
14 0.80 71 1 56.80
14 12.00 3 1 36.00
8 10.70 28 1 299.60
12 1.45 200 1 290.00
12 3.30 150 1 495.00
8 11.00 30 1 330.00
14 0.90 75 1 67.50
14 11.00 4 1 44.00
8 4.73 22 1 104.06
8 4.20 25 1 105.00
8 8.76 14 2 245.28
8 2.43 87 1 211.41
8 12.00 96 1 1,152.00
8 6.64 24 1 159.36
8 4.47 200 1 894.00

Total Length 3,648.31 0.00 1,688.10 527.45 0.00 0.00 0.00


Unit Wt./ml 0.395 0.617 0.888 1.208 1.578 2.466 3.555
Sub total Wt. 1,441.08 0.00 1,499.03 637.16 0.00 0.00 0.00
Grand Total Wt. 1,441.08 0.00 1,499.03 637.16 0.00 0.00 0.00

___________________________ _________________________
Contractor Supervisor
Asfe Jejaw Zeleke Tadesse AE/1925 Anmut Yalew PE/5931