TOTAL 2,405,671.42
We Zeleke Tadesse and Animut Yalew certify that the above figures are correct and that the total value of work executed and/or
materials supplied to date is birr 2,405,671.42(Two Million Four Hundred Five Thousand Six Hundred Seventy One Birr and 42 Cents
Only)
__________________________
__________________________ Supervisor
Contractor Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Asfe Jejaw
Project:- Cancer Treatment Center
Client:- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering Page 187
Summary of Statement of Variation order 1
Sub total (Birr) Total Sum (Birr)
Item No. Description
Contract Executed Contract Executed
12
Concrete work 447,862.86 220,027.40
13 Masonry work 45,364.00 36,289.00
14 Plastering & Pointing 11,232.00 8,985.60
15 Curb stone 46,558.80 37,246.50
Sub Total (B) 628,326.16 327,414.30
Total (A+B) 2,963,683.74 2,405,671.42
We Zeleke Tadesse and Animut Yalew certify that the above figures are correct and that the total value of work executed and/or materials supplied to date is birr 2,405,671.42(Two Million Four
Hundred Five Thousand Six Hundred Seventy One Birr and 42 Cents Only)
__________________________ __________________________
Contractor Supervisor
Asfe Jejaw Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
12.SANITARY INSTALLATION
Pipe Laying
Filter Material
Supply and fill filter materials in layers in
accordance with the detail drawing given.The
materials shall be washed ,clear and freeof any
dust ,mud,suspended materials ,etc.not to reduce
the void area of the filter materials .
Geosynthetic:
.Supply andwrap a uv
stabilized ,polypropylene,needle
punched ,woven ,geotextile geosunthetic
intended use for filtration +separation +Drainage
in accordance with the given drawing .The
materia shall achieved EN13252 Test method
and have hydraulic property of :
6 Weight :280g/m2 Geotextile Water
Flow Capacity :(5-10)%<characteristic water
flow rate Soil retention
Capacity:(AOS)<D
________________________ ___________________________
Contractor Supervisor/Inspector
Asfe Jejaw Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
________________________ ___________________________
Contractor Supervisor/Inspector
Asfe Jejaw Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar Page 190
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
QUANTITY AMOUNT
Item
DESCRIPTION UNIT EXCUTED
No. CONTRACT UNIT PRICE CONTRACT EXCUTED
QUANTITY
QUANTITY AMOUNT AMOUNT
A. SUB-STRUCTURE
2. CONCRETE WORK
b For 10cm thick bottom slab for ditch m3 3.2 2.56 2,500.00 8,000.00 6,400.00
c For 10cm thick concrete walk way m3 48.08 10.78 2,500.00 120,200.00 26,950.00
a) shear wall
m2 210.45 13.13 150.00 31,567.50 1,969.50
________________________ ___________________________
Contractor Supervisor/Inspector
Asfe Jejaw Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar Page 191
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
QUANTITY AMOUNT
Item
DESCRIPTION UNIT CONTRACT EXCUTED CONTRACT EXCUTED
No. UNIT PRICE
QUANTITY QUANTITY AMOUNT AMOUNT
Mild Steel reinforcement according to Structural
Drawings and Technical Specifications. Price
2.4 includes cutting, bending, placing in position and
tying wires.
3. MASONRY WORKS
a) Below Natural Ground Level (BNGL) m3 41.24 32.99 1,100.00 45,364.00 36,289.00
5. Curb stone
________________________ ___________________________
Contractor Supervisor/Inspector
Asfe Jejaw Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
VARIATION ORDER ONE
page 192
NO Size Qty Description NO Size Qty
12. SANITARY INSTALLATION Bunker
Sub-surface Drainage System 1 28.97 On axis H (1-5)
Pipe Laying 1.31
0.86 32.64 m3
1. Supply,lay and connect semi-slotted/ perforated
UPVC pipe , PN-16, dia. 160mm, min wall thickness
11.9mm,2slots shall staggered on top half perimeter On axis H b/n 9-12
1 18.50
of UPVC pipe complete with all the necessary 1.26
accessories ,bends and fittings ,method of welding
shall comply with the requirements of BS-5911 or 0.97 22.54 m3
DIN8062 or equivalent institution .
1 18.50
Maximum Slot Length:65mm 5.03
Maximum Slot Width:4mm 1.26 116.78 m3
Minimum no of slots per m(row):13
pitch (Spacing b/n slots in arow ) no of slots 1 27.80 On axis 12 b/n H-L
per m(row) :75mm 1.61
Minimum Slot Area :4914mm2/m 0.97 43.29 m3
On axis F(1-8)
1 30.15 30.15 ml 1 27.80
6.43
On axis F(8-3') 2.27 404.88 m3
1 55.80 55.80 ml
1 8.02 b/n axis K-L & 12-13
Bunker 1.60
On axis H (1-5) 0.97 12.43 m3
1 30.10 30.10 ml
1 8.02
116.05 ml Grand Total 6.40
1.13 57.74 m3
2. Provide 5cm thick and 50-80cm wide lean
concrete under dia160mm semi slotted/ perforated 1 8.00 On axis 13 b/n L-M
UPVC pipe 1.22
1 30.15 On axis F(1-8) 0.97 9.46 m3
24.12 m
2
0.80
1 8.00
1 55.80 On axis F(8-3') 6.10
0.80 44.64 m2 2.37 115.41 m3
_____________________________ ______________________________
Contractor Supervisor
Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
VARIATION ORDER ONE
page 193
NO Size Qty Description NO Size Qty
1 8.02 b/n axis K-L & 12-13 Bunker
2.88 On axis H (1-5)
0.81 18.62 m3 1 32.97
6.39 210.68 m2
1 8.00 On axis 13 b/n L-M
2.75 1 18.50 On axis H b/n 9-12
0.81 17.71 m3 6.84 126.54 m2
_____________________________ ______________________________
Contractor Supervisor
Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
VARIATION ORDER ONE
page 194
NO Size Qty Description NO Size Qty
Bunker 1 7.02 on axis L' b/n 12-13
On axis H (1-5) 3.90 27.38 m2
1 32.97
3.43 113.09 m2 1 4.02 on axis M b/n 12-13
3.90 15.68 m2
FOR BUNKER
1 18.50 On axis H b/n 9-12 1 1.00 axis b/n L-M & 12-13
5.03 92.96 m2 3.90 3.90 m2
1 27.80 On axis 12 b/n H-L 1 4.31 axis b/n 12-13 & L-M
6.43 178.62 m2 3.90 16.81 m2
1 8.02 b/n axis K-L & 12-13 1 6.00 on axis 13 b/n L'-M
6.40 51.33 m2 3.90 23.40 m2
2 1.94 axis b/n 10-12 & H-I 1 6.70 on axis 8 b/n F-G
3.60 13.97 m2 4.00 26.80 m2
1 9.65 b/n axis K-L & 12-13 1 17.45 on axis F b/n 8-4
3.90 37.64 m2 4.35 75.91 m2
1 3.51 axis b/n 11 -12& L-M 1 7.40 axis b/n 6-5 & F-G
3.90 13.69 m2 4.35 32.19 m2
_____________________________ ______________________________
Contractor Supervisor
Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
VARIATION ORDER ONE
page 195
NO Size Qty Description NO Size Qty
1 6.55 on axis 4 b/n F-G
4.35 28.49 m2
_____________________________ ______________________________
Contractor Supervisor
Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
VARIATION ORDER ONE
page 196
NO Size Qty Description NO Size Qty
01 EXCAVATION & EARTH WORK 1 17.20
1.1 Bulk excavation in ordinary soil to a depth not 2.45 42.14 m2
exceeding 1500mm from reduced level.
1 4.20
3.35 1 12.80
0.35 4.92 m3 3.57 45.70 m2
1 10.75
2.45 m3 Grand total 0.20
1.5 25cm thick basaltic or equivalent stone hardcore 2.60 5.59 m3
well rolled, consolidated and blinded with crushed
stone.
1 17.20
1 4.20 1.10
4.75 19.95 m2 0.30 5.68 m3
_____________________________ ______________________________
Contractor Supervisor
Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering
VARIATION ORDER ONE
page 197
NO Size Qty Description NO Size Qty
1 10.75
0.50
0.30 1.61 m3
1 1.10
0.30 0.33 m2
3. Masonry work
3.1 Construct 50cm thick trachytic or equivalent stone
masonry foundation wall bedded in cement sand
mortar ratio 1:3
a) Below Natural Ground Level (BNGL)
1 32.00 stone masonry work
0.40
1.08 13.82 m3
1 32.00
0.50
1.08 17.28 m3
_____________________________ ______________________________
Contractor Supervisor
Zeleke Tadesse AE/1925 Anmut Yalew PE/5931
Project:- Cancer Treatment Center
Client :- University of Gondar
Consultant :- Yohannes Abay Consulting Architects & Engineers
Contractor:- Unity Engineering page 198
Dia
Location Bar No Bar Dia (mm) Bar shape Bar Length No. of bars No of members Dia 10mm Dia 12mm Dia 14mm Dia 16mm Dia 20mm Dia 24mm
8mm
Shear wall around ward D
14 1.35 117 1 157.95
14 2.00 77 1 154.00
12 2.20 140 1 308.00
12 1.85 94 1 173.90
8 1.70 18 1 30.60
14 2.80 4 1 11.20
8 1.30 90 1 117.00
12 1.80 26 1 46.80
12 2.60 144 1 374.40
14 0.80 71 1 56.80
14 12.00 3 1 36.00
8 10.70 28 1 299.60
12 1.45 200 1 290.00
12 3.30 150 1 495.00
8 11.00 30 1 330.00
14 0.90 75 1 67.50
14 11.00 4 1 44.00
8 4.73 22 1 104.06
8 4.20 25 1 105.00
8 8.76 14 2 245.28
8 2.43 87 1 211.41
8 12.00 96 1 1,152.00
8 6.64 24 1 159.36
8 4.47 200 1 894.00