We Zeleke Tadesse and Animut Yalew certify that the above figures are correct and that the total value of work executed to date
is birr 2,114,655.43(Two Million One Hundred Fourteen Thousand Six Hundred Fifty Five Birr and 43 Cents Only)
__________________________ __________________________
Project:- Loza Mariyam Maternity (Plasenta Pit)
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C page 171
Location:- Azezo - Gondar
Sub total (Birr) Total Sum (Birr)
Item No. Description
Contract Executed Contract Executed
BILL No. 1
A. SUB-STRUCTURE
A. SUB-STRUCTURE
127,823.50 130,166.80
1 EXCAVATION & EARTH WORK
74,345.10 59,486.90
2 CONCRETE WORK
293,997.00 235,202.00
3 MASONARY WORK
B. SUPER-STRUCTURE
__________________________ __________________________
Contractor Supervisor
We Zeleke Tadesse and Animut Yalew certify that the above figures are correct and that the total value of work executed and/or materials supplied to date is birr
505,396.5(Five Hundred Five Thousand Three Hundred Ninty Six Birr and 50 Cents Only)
__________________________ __________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (Plasenta Pit)
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C page 172
Location:- Azezo - Gondar
AMOUNT
QUANTITY
EXCUTED UNIT CONTRACT EXCUTED
ITEM DESCRIPTION UNIT CONTRACT
QUANTITY PRICE AMOUNT AMOUNT
QUANTITY
A. SUB-STRUCTURE
1.5 Cart way excavated material to a distance not exceeding 5Km from site. m3 680.96 646.27 65 44,262.40 42,007.55
Total carried to Sub-summary birr 127,823.50 130,166.80
2. CONCRETE WORK
50mm thick lean concrete in class C-5, minimum cement content of 150
kg/m3
2.1 Under Grade Beams. m2 131.36 105.09 110 14,449.60 11,559.90
Reinforced concrete in C-25, minimum cement content of 360 kg/m3 filled in
to form work and vibrated around steel reinforcement (formwork and
reinforcement measured separetly).
2.2 In grade beams. m3 23.27 18.62 2500 58,175.00 46,550
2.3 In 100mm thick ground floor slab. m2 0.00 -
Form work -
2.4 To grade Beams. m2 11.47 9.18 150 1,720.50 1,377
Reinforcement Bar -
2.5 -
Dia 8mm deformed bar. kg 0.00
Total carried to Sub-summary birr 74,345.10 59,486.90
3. MASONARY WORK -
3.1 Basaltic or equivalent stone masonary Retaining wall beded in cement sand m 3
3.2 25cm thick basaltic or equivalent stone hard core well rolled, consolidated m 2
-
and blinded with crushed stone. 0.00
3. Reinforcement Bar
3.1 Dia 14mm deformed bar. kg -
3.2 Dia 12mm deformed bar. kg 1753.37 1402.7 36 63,121.32 50,497.20
3.3 Dia 10mm deformed bar. kg -
3.4 11,889.60
Dia 8mm deformed bar. kg 464.43 371.55 32 14,861.76
Total carried to Sub-summary birr 100,613.08 80,540.80
________________________________________ ____________________________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (Ash Needle)
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C page 173
Location:- Azezo - Gondar
Sub total (Birr) Total Sum (Birr)
Item No. Description
Contract Executed Contract Executed
A. SUB-STRUCTURE
B. SUPER-STRUCTURE
1 CONCRETE WORK 59,945.04 47,972.14
We Zeleke Tadesse and Animut Yalew certify that the above figures are correct and that the total value of work executed and/or materials supplied to date is birr
383,326,74(Three Hundred Eighty Three Thousand Three Hundred Twenty Six Birr and 74 Cents Only)
__________________________ __________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (Ash & Needle)
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C
Location:- Azezo - Gondar page 174
QUANTITY AMOUNT
A. SUB-STRUCTURE
1.2 Bulk excavation in ordinary clay soil to a depth not less than 5m.
m3 570.23 549.07 60.00 34,213.80 32,944.02
1.3 Fill and Compaction work on the Excavated Area. m2
-
Back fill around the Retaing wall with selected material, well
1.4 rammed in layers of 200mm thick and compacted at dry density
and optimum moisture content. m3 337.5 363.20 150 50,625.00 54,480
3.2 25cm thick basaltic or equivalent stone hard core well rolled, m2 -
consolidated and blinded with crushed stone.
Total carried to Sub-summary birr 255,563.00 204,457.00
B. SUPER-STRUCTURE
1. CONCRETE WORK
2.1
To RC Cover Slab m2 20 16.00 150 3,000.00 2,400
2.2
To beams on the top of the Retaing Wall m2 4.98 3.99 150 747.00 598.50
3. Reinforcement Bar
3.1
Dia 8mm deformed bar. kg 382.51 306.01 32 12,240.32 9,792.32
3.2 Dia 12mm deformed BIRR kg 805.77 644.62 36 29,007.72 23,206.32
3.3 Dia 14mm deformed bar. kg -
3.4 -
Dia 10mm deformed bar. kg
3.5 50*50*0.5cm thick Metal Plate Manhole Cover with handle Pcs -
_________________________________________ ________________________________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (Septic tank)
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C page 175
Location:- Azezo - Gondar
Sub total (Birr) Total Sum (Birr)
Item No. Description
Contract Executed Contract Executed
BILL No. 1
A. SUB-STRUCTURE
SUB-STRUCTURE
108,719.67 96,004.76
1 Excavation and Earth work
217,612.72 174,119.72
3 Concrete Work
76,079.30 60,863.44
4 Sanitary instalation
4,200.00 3,360.00
5 Plastering
TOTAL AMOUNT WITH OUT VAT 727,503.69 591,065.92
__________________________ __________________________
Contractor Supervisor
We Zeleke Tadesse and Animut Yalew certify that the above figures are correct and that the total value of work executed and/or materials supplied to date is birr
591,065.85(Five Hundred Ninty One Thousand sixty five Birr and 85 Cents Only)
__________________________ __________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (Septic tank)
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C
Location:- Azezo - Gondar page 176
AMOUNT
QUANTITY
A. SUB-STRUCTURE
-
1.4 Fill around retaing wall (Selected borrowed fill)
m3 292.58 273.20 150 43,887.00 40,980
3. CONCRETE WORK
a) To floor beam m3 -
m2
-
c) To top floor beam
________________________________________ _____________________________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (Septic tank)
Client:- University of Gondar
Consultant:- Yohannis Abay page 177
Contractor:-Unity Enginneering P.l.C
Location:- Azezo - Gondar
AMOUNT
QUANTITY
4. SANITRY INSTALLATION
4.01
Supply & install PVC waste pipe
9,000.00
a) Dia 110 lm 45 36.00 250 11,250.00
-
b) Dia 250 lm 12.5 10.00
5. PLASTERING
m2
a) Sofit of slab
________________________________________ _____________________________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (INCINARATOR )
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C page 178
Location:- Azezo - Gondar
Sub total (Birr) Total Sum (Birr)
Item No. Description
Contract Executed Contract Executed
A. SUB-STRUCTURE
809.50 662.90
2. CONCRETE WORK
3,597.00 2,882.00
3. MASONARY WORK
SUB-TOTAL A 5,084.30 4,087.80
B. SUPER-STRUCTURE
1. CONCRETE WORK 20,484.47 1,575.00
__________________________ __________________________
Contractor Supervisor
We Zeleke Tadesse and Animut Yalew certify that the above figures are correct and that the total value of work executed and/or materials supplied to date is birr 92,558.28
(Ninty Two Thousand Five Hundred Fifty Eight Birr and 28 Cents Only)
__________________________ __________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (Incinarator))
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C
Location:- Azezo - Gondar page 179
AMOUNT
QUANTITY
EXCUTED UNIT CONTRACT EXCUTED
ITEM DESCRIPTION UNIT CONTRACT QUANTITY PRICE AMOUNT AMOUNT
QUANTITY
A. SUB-STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Removing top soil m2 5.3 4.24 5.00 26.50 21.20
1.2 Bulk excavation with thickness of 75cm m3 5.3 4.24 60.00 318.00 254.40
2.1 50mm thick lean concrete in class C-5, minimum cement content
of 150 kg/m3: under masonary m2 3.2 2.56 90 288.00 230.40
4.1 Apply two coats of plastering m2 4.12 3.30 120 494.40 396.00
4.2 Pointing brick wall surface m2 32.57 26.06 80 2,605.60 2,084.80
________________________________________
________________________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (SOAK AWAY PIT )
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C page 180
Location:- Azezo - Gondar
Sub total (Birr) Total Sum (Birr)
Item No. Description
Contract Executed Contract Executed
__________________________ __________________________
Contractor Supervisor
We Zeleke Tadesse and Animut Yalew certify that the above figures are correct and that the total value of work executed and/or materials supplied to date is birr
230,253.46(Two Hundred Thirty Thousand Two Hundred Fifty Three Birr and 46 Cents Only)
__________________________ __________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (SOAK AWAY PIT)
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C
A. SUB-STRUCTURE
2. CONCRETE WORK
3. MASONARY WORK
__________________________________________
___________________________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (ELEVATED WATERTANK )
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C
Location:- Azezo - Gondar page 182
Sub total (Birr) Total Sum (Birr)
Item No. Description
Contract Executed Contract Executed
A. SUB-STRUCTURE
1. EXCAVATION & EARTH WORK 26,325.00 7788.00
2. CONCRETE WORK 6,375.00 4,800.00
3. MASONARY WORK 9,152.00 7,326.00
We Zeleke Tadesse and Animut Yalew certify that the above figures are correct and that the total value of work executed and/or materials supplied to date is birr
312,054.54(Three Hundred Twelve Thousand Fifty Four Birr and 54 Cents Only)
__________________________ __________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (E.WATER TANK)
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C
Location:- Azezo - Gondar page 183
QUANTITY AMOUNT
A. SUB-STRUCTURE
2. CONCRETE WORK
3. MASONARY WORK
3.1 Basaltic stone masonary wall bedded in cement sand mortar 1:4
m3 8.32 6.66 1,100.00 9,152.00 7,326
B. SUPER-STRUCTURE
1. CONCRETE WORK
1.3
For slab m3 3.45 2.74 2,500.00 8,625.00 6,850
2.3 Provide, cut & fix in position sawn wooden or steel formwork
which ever appropriete.
_________________________________________ _______________________________________________
Contractor Supervisor
Project:- Loza Mariyam Maternity (E.WATER TANK)
Client:- University of Gondar
Consultant:- Yohannis Abay
Contractor:-Unity Enginneering P.l.C page 184
Location:- Azezo - Gondar QUANTITY AMOUNT
2. METAL WORK
3.1.1
Dia 32mm GS steel ladder ml 76.25 76.25 1291.98 98,513.48 98,513.48
3. SANITARY INSTALLATION
3.1
Dia 110mm ml 45.75 36.60 250.00 11,437.50 9,150.00
3.2
Dia 250mm ml 10.00 -
Rectangular manhole
_________________________________________ _______________________________________________
Contractor Supervisor
Project:- Loza Mariam Maternity (Elevated waer tank)
Client:- University Of Gondar
Consultant:- Yohanis Abay consulting
Contructor :- Unity Engineering P.L.C Page No :- 185
Location :- Azezo, Gondar
T D S Description T D S Description
2. METAL WORK
3.1.1 Dia 32mm GS steel ladder
1 76.25
76.25 ml
__________________________ __________________________
Contractor Supervisor
Asfe Jejaw Zeleke Tadesse AE/1925 Anmut Yalew PE/5931