Professional Documents
Culture Documents
Total Project Cost Summary For GSAS Materials Criteria For GSAS CE.2 Criteria
Material Cost Estimation of items considered in GSAS Calculator
Division 3
Reinforcement Bar 54,501,607.49
Cast in place concrete 76,842,356.55
Precast Concrete 9,820,109.38
Division 4
Concrete Unit Masonry 49,714,303.02
Division 5
Metal Fabrication 28,232,814.72
Structural Steel Work 17,062,440.27
Metal Railing 32,038,107.13
Division 6
Architectural Wood Works 36,825,411.01
Division 7
Sheet Waterproofing 60,148,168.53
Thermal Insulation 12,275,136.22
Division 8
Metal Door 14,730,163.32
Louvers 4,910,054.44
Division 9
Concrete Flooring 14,361,909.66
Paver Flooring 8,592,595.79
Terazzo Flooring 2,455,027.18
Precast Concrete Floor 9,820,109.38
Epoxy Flooring 982,010.87
Vinyl Flooring 5,155,557.47
Ceramic Tile 5,603,599.90
Marle flooring 5,892,065.49
Sheet Carpeting 1,718,519.16
Painting
16,939,688.13
Gypsum Board Assemblies 15,129,105.55
Division 32
Concrete Paving - Precast 7,571,120.16
Concrete Paving - Insitu 12,618,533.61
Total 503,940,514.44