WORK METHODOLOGIES FOR

INTERIOR FITOUT WORKS


ACOUSTIC BAFFLE CEILING
INTRODUCTION
➢ WHAT IS ACOUSTIC BAFFLE
CEILING?
Baffle Ceilings offer a spatial
pattern with a linear
open ceiling. From a practical
point of view, they are simple
to install and offer easy access
to the ceiling plenum for
maintenance and the
installation of additional
services such as lighting, PA
system, sprinklers etc.

➢ BENEFITS OF ACOUSTIC BAFFLE CEILING


Services friendly – its easy to install all the services inside the
acoustic baffle ceiling.

Dry construction – The acoustic baffle ceiling does not require


water either for the installation or curing. Also, baffle ceiling is
humidity resistant.

Fire rating – Acoustic Baffle ceiling is also available with fire


rating.

Light weight – It is light in weight.

Thermal insulation – Acoustic Baffles are good in thermal


resistance.

Acoustical insulation – Acoustical Baffles are known for high


sound absorption properties.

Aesthetics – Acoustic Baffle ceiling is highly customizable and is


available in multiple colors and forms.
ACOUSTIC BAFFLE CEILING TOOLS
• Marking Tools
NAME TOOLS USAGE APPLICATION

Measuring Tape To measure the length


/ width.

Water level To check the alignment


of the baffle ceiling

Chalk line Marking of reference


Line on structure

Laser level To determine the


ceiling level

• Fixing/cutting Tools

NAME TOOLS USAGE APPLICATION

Hammer Drill To drill a hole in to


Machine the true slab

Gas Gun To Fix metal supports


on true slab

Metal Cutter To Cut metal section


ACOUSTIC BAFFLE CEILING MATERIALS
Fixing Plate
It is screwed to the true slab to support
adjustable hanger.
Hanger Clip
It is used to fix the height of the adjustable
hanger.

Adjustable Hanger
A adjustable hanger is used to adjust the
ceiling levels.

Main Runner
Main runners are hanged to the adjustable
hanger using the hooks.

Cross Tee
Cross tee introduced between the main
runners to maintain the distance between the
main runners.

Baffle Clip
Baffle clips slide into the main runner to hang
the solo baffle.

Solo Baffle/Hook
Solo Baffles introduces into the baffle clips
using hook at the top surface of solo baffle.

Guiding Pin
Guiding pins are used to join two solo baffle &
to maintain the alignment of the baffles.
WORK METHODOLOGY AND SEQUENCE

Baffle is an acoustic solutions, primarily when it is not


possible to install wall-to-wall ceilings.. It offers several
different installation possibilities using Baffle profile,
Adjustable wire hanger or grid system. The edges are
straight cut and painted. Baffle systems are available in
different sizes and in a wide range of colors.

Click icon to add picture


• BEFORE INSTALLATION

A Good practices Process

All material delivered to site should be checked for


1
damage, unopened and original packages

2 All materials to be kept dry and protected.

It is important at this stage to determine the direction the


3 Baffle being installed. The drawing supplied by the
designer will show the Baffle direction required.

• INSTALLATION

B Good practices Process

Mark the dimension lines for


1
fixing plate.

Screw the fixing plate to the


2 true slab using hammer drill
or gas gun.

Hang the adjustable hanger


3
into the fixing plate
B Good practices Process

Introduce the main runner


4
using adjustable hanger

Fix the cross tee in between


the main runner at a
5
distance of 1200mm c/c to
maintain the alignment.

Slide the baffle clip into the


6
surface of main runner

Insert the Solo baffle into


7 the baffle clip using hook at
the top of the baffle.

Use guiding pin to join two


8 baffles and to main the
alignment between them.
Tentative quantities based on a typical project of 20,000 Sq. Ft
Area Tentative quantities 7
7

Considering a
typical project of 3,000 Sq. Ft.
20,000 Sq. Ft 7

Remark: The above mentioned quantity is based on a specific project of 20,000 Sq. Ft. The quantities may
vary according to the Layout and design of Project.

Tentative Manpower & Manhours Requirement

Area Timeline/Manhours 7
7
Type of Labour Required

Considering an
area of 3000 sq.
4 Skilled Workers 3 Days
ft. For
2 Unskilled Labors (Including Framing Works, Services/Electrical
installation of
and Baffling)
baffle Ceiling .

Remark: The timelines is based on typical labor output on 8 hours working days and single shift a day. If
no. of working hours a day is lessor, it may take more days for completion of job. In case of projects with
short deadlines, the man power may be increased to reduce the time required for given task.