You are on page 1of 20

QUOTATION OF MOBILE

ASPHALT MIXING PLANT (80t/h)

LUTON GROUP CO.,LTD

Quality is our culture, service is our mission!


MOBILE ASPHALT MIXING PLANT (80t/h)
(Over 30 Years,Suppliers for Government projects)

Ref No.: Date: Dec.5th.2022 Quotation Valid: 15 days


From: LUTON GROUP To:Kibish construction or al ajaweed general trading
Contact: Contact: Abrham
Email:sales@lutongroups.com Email:
Mobile/Whatsapp: +86 17320166678 Mobile:

PART I.ADVANTAGE OF LUTON GROUP


 Over 30 years product experience make sure quality.
 Exported to over 100 countries in the world.
 Have 10 oversea branches in the world, can supply you 7 days*24 hours service
 More than 20 engineers and 1000 workers ensure delivery time.
 CE/ISO/BV/SGS, also are Lafarge Group supplier.
 Goods and spare parts are in stock, can delivery at any time
PART II.MAIN CONFIGURATION
Model LBQY-1000 Mobile Asphalt Mixing Plant

Type Continuous drum mix

Machine Power 215.5KW

Capacity 80~90tph (Standard Working Condition)

Drying & Mixing Drum Φ1500X6500mm


Weighing Precision hot aggregate ±0.5%; bitumen ±0.3%
Hot asphalt Temperature 130℃-165℃ (adjustable)

Electrical Design 380V-50HZ/60HZ(adjustable)

Documents Lay-Out/ Electric Circuit Diagram; Chinese-English Operation Manual

PART III. QUOTATION


ITEM# DESCRIPTION QTY CIF PRICE (USD)
LBQY-1000 Mobile Asphalt Mixing Plant(Batch
1 1set $291,197
Type)
2 Spare parts 0
CIF DJIBOUTI PRICE $291,197

Payment Term 30% is paid by T/T as deposit, 70% is paid by T/T before deliver,y

Delivery Time Ready for delivery

Packing Before delivery, the equipment is treated for anti-corrosion. Small parts and electric motor will be put into
wooden cases; while the large parts are in nude packing.

Warranty 12 months from the date of delivery

Remarks:

Installation and commissioning: After receiving advance payment, the seller will provide operation manual and
foundation drawing to the buyer. If the buyer requires, the seller shall send one or two technician to direct installation,
commissioning, trial-run, and training local workers. The buyer is responsible for board and lodging, return tickets,
safety of technician.

PART IV.SPARE PARTS LIST

Free Spare Parts List and tool List for asphalt mixing plants
NO. Name Items Quantity Remarks
1 Roller T/TG76×305-00 3Sets LUTON

2 Roller T/TG76×650-00 2Sets LUTON


NO. Name Items Quantity Remarks
3 Mounted spherical bearing UCT308 2PCS LUTON

4 Mounted spherical bearing UCP208 2PCS LUTON

5 Mixing Blades LBQ1000C-11-04-04 3PCS LUTON

6 screw M20×90 LBQ1000C-11-04-18 3PCS LUTON

7 screw M20×110 LBQ1000C-11-04-19 3PCS LUTON

8 screw M20×120 LBQ1000C-11-04-20 3PCS LUTON

9 nut M20 GB/T6170-2000 10PCS LUTON

10 spring washer 20 GB/T93-1987 10PCS LUTON

11 pressure gauge Y-60 4Mp(M14×1.5) 1 LUTON

12 The electromagnetic valve CPE24-M1H-5L-3/8 DC24V 1 LUTON

13 sensor SMT-8M-NS-24V-K-2.5-OE 1 LUTON

14 Push-in threaded fittings QS-3/8-12 5PCS LUTON

15 Push-in threaded fittings QS-1/2-12 5PCS LUTON

16 air hoseφ10 5M LUTON

17 air hoseφ12 10M LUTON

18 Graphite Metal Pad DN20 1PCS LUTON

19 Graphite Metal Pad DN25 2PCS LUTON

20 Graphite Metal Pad DN40 1PCS LUTON

21 Graphite Metal Pad DN50 2PCS LUTON

22 Oil soaked asbestos packing 10×10 YS350F 3M LUTON


23 raw materials belt 10Box LUTON
24 polymer sealant 5Box LUTON
25 Modified Acrylic Adhesive(302) 2Box LUTON

26 Thermal resistance WZPK-328 Pt100 L=400mm 1 LUTON

27 Fuse core RT18-32(6A) 10PCS LUTON

28 Combination button with light LA39-11RD/r.g31 1PCS LUTON


29 Time relay ST3PA-A,AC220V 1PCS LUTON

30 Small Intermediate Relay HH53P,AC220V 1PCS LUTON

31 Three-position illuminated knob LA39-20XSD/g31 1PCS LUTON


NO. Name Items Quantity Remarks
32 Small Intermediate Relay HH53P,DC24V 1PCS LUTON

33 Button without light LA39-20r 1PCS LUTON

34 Tool Box 400×200×200 1PCS LUTON

35 5.5~32mmDouble head wrench GB/T4388-1984 1Set LUTON

36 5.5~32mm Double head wrench GB/T4388-1984 1Set LUTON

37 36mm Single head wrench GB/T4388-1984 1PCS LUTON

38 55mm Single head wrench T/DBS36×55-00 2PCS LUTON

39 Ordinary pipe wrench 450 QB/T3858-1999 1PCS LUTON

PART V.CONFIGURATION
Item Name Specifications Qty Origin

No.1: MOBILE BATCHING SYSTEM (22KW)

Volume: 6.5m3
Bin Qty: 4
Feeding height: 3.2m
1.1 Aggregate Bin Feeding width: 3.0m 4pcs LUTON
Bin vibrator: 0.25kw x 2
Electronic sensor x1
Grille included in the aggregate bin to avoid excess size
aggregate
Motor power: 2.2KW x 4(frequency conversion speed
regulation)
1.2 Feeding Belt Conveyor 4pcs LUTON
Vector inverter to control metering, equipped with material
cut-off alarm device, reducer
Motor power: 4KW x 1(frequency conversion speed regulation)
1.3 Collecting belt conveyor Vector inverter to control metering, equipped with material 1pcs LUTON
cut-off alarm device, reducer
Cold aggregate l filter slip Carry out a coarse filtering of cold material, and match it with
1.4 1pcs LUTON
screen the flat inclined belt machine
Motor power: 4KW×1
Output capacity: 120t/h
1.5 Input belt conveyor 1pcs LUTON
The head and tail of the belt conveyor are equipped with
cleaners and reducers, with receiving tray.
Lift material using plate chain; use with inverter motor, reducer Luoyang
1.6 Hot material elevator (triple), motor power: 7.5KW x1; 1set brand
Luoyang bearing; conveying capacity of 120t / h bearing;
traction pin; Mast; Rear car double bridge eight tires, air circuit,
1.7 Mobile Chassis 1set LUTON
circuit and lamps, double axles with 4 tyres.
No.2: MOBILE DRUM DRYER SYSTEM (53KW) Qty Origin
Model:Φ1500x6650mm
Motor: 7.5kw x4
Drive: Four wheel friction drive
2.1 Heat Drying Drum 1set LUTON
Material: Steel boiler plate
Note: The material of guide plate, inlet and outlet materials are
wear-resistant, high-temperature resistant materials

Light oil burner (EFIC Brand) 1set UK


Fuel capacity: 550kg/h
2.2 Burner Fan power 1×15kw
Oil pump power: 1×4kw 1 set LUTON
Adjustment ratio 1:5
Air compressor medium atomization
Air compressor integrated in the air path
2.3 Air circuit system concentrated for compressed air 1set CHINA
Valve bag: 0.6 m3
2.4 Light oil rail tanker Not included 1set CHINA

2.5 Light oil pipeline Tank to burner pipelines, valves, flanges, graphite gaskets, bolts 1set CHINA
Powder material Motor: 4kw
2.6 1set LUTON
elevator Recycled powder lifted to mixing
traction pin; Mast; Rear car double bridge eight tires, air circuit, circuit
2.7 Mobile Chassis 1set LUTON
and lamps, double axles with 8 tyres.

No.3: DUST REMOVAL SYSTEM (65.87KW) QTY Origin


 The integrated design of gravity and bag dust removal;
 Gravity dust removal and coarse particle recovery into stone
elevator for aggregate use, motor power 4KW (SCUTTI); powder
First-stage volute dust recovery screw The conveyor 2×4kW feeds into the powder 1 set LUTON
3.1 collector + cyclone elevator;
dust collector  the 1×3kW excess recovered powder is discharged out of the
screw conveyor.

415 m2 DuPont Metas filter bag, 5.5KW dust removal screw conveyor 1 set USA

Air volume of induced fan> 28000m³ / h, air distribution regulator


3.2 Induced draft fan 1 set LUTON
(0.37KW) and vibration damping pad, motor power: 37KW

3.3 Dust pipe A set of flue and chimney 1 set LUTON

3.4 Gas tank 0.6m3 1 set LUTON

3.5 Air compressor 2.2kw 1 set LUTON


traction pin; Mast; Rear car double bridge eight tires, air circuit, circuit
3.6 Mobile Chassis 1 set LUTON
and lamps, double axles with 4 tyres.

No.4: MOBILE MIXING SYSTEM (45.5KW) QTY Origin


Taiwan
 Taiwan AirTAC cylinder, 1 set
4.1 Hot material silo AirTAC
 solenoid valve, muffler; 1 set LUTON
 1# silo is equipped with a temperature sensor. Placed on the rear
frame when moving
 silo-type distributing silo, each silo is equipped with a 1 set LUTON
rotary-resistant material level gauge, and the silo partition has
wear resistance;
 Contains three weighing sensors (Toledo, USA), aggregate hopper
1 set Toledo, USA
Aggregate weighing volume: 1200 ㎏;
4.2
device  Taiwan AirTAC cylinder, Taiwan
AirTAC
 solenoid valve, muffler
 Contains three weighing sensors (Toledo, USA), powder hopper
1 set Toledo, USA
volume: 120 ㎏;
Powder weighing
4.3  the powder hopper outlet is equipped with a butterfly valve; the
device
recovery powder metering screw is 3kw, and the outlet accelerates LUTON
the butterfly valve to limit the metering impulse

Asphalt weighing With three weighing sensors (Toledo, USA), asphalt hopper volume: 90kg,
4.4 1 set Toledo, USA
device upstairs insulation pipe

Asphalt spraying  Asphalt spray pump Motor power: 5.5KW × 1;


4.5 1 set LUTON
device  after weighing, the asphalt "shower" is sprayed into the mixing tank
 Cylinder crank arm tension connection can be adjusted, agitator
is double horizontal shaft, mixing pot capacity is 1.1 tons;
 revolving door type discharging door, automatic adjustment of
gravity center; equipped with negative pressure device for 1 set LUTON
4.6 Mixer assembly cleaning pot; discharge height: 3.5m; Triple), motor power:
18.5KW×2;
 solenoid valve, muffler
AirTAC
 AirTAC cylinder 1 set
cylinder
Recycled powder
4.7 1.8m3; gas distribution arch breaking system 1 set LUTON
temporary storage
bin
4.8 Driving floor Outriggers and Braces 1 set LUTON
Racks, platforms,
4.9 escalators, ladders, Placed on the front frame when moving 1 set LUTON
railings
Mixing building gas Before leaving the factory, the upstairs air supply pipeline is
4.10 1 set LUTON
path connected, and the quick-plug connector
Mixing building Before leaving the factory, the electrical control junction boxes,
4.11 1 set LUTON
electricity path internal bridges and control lines of each layer are connected
Asphalt pipe for Partially segmented prefabricated connections before leaving the
4.12 1 set LUTON
mixing building factory
traction pin; Mast; Rear car double bridge eight tires, air circuit, circuit
4.13 Mobile Chassis 1 set LUTON
and lamps, double axles with 8 tyres.
No.5: VIBRATING SCREEN (4KW) Qty Origin

 Two vibration motors (Taihang), maintenance-free;


Asphalt direct
5.1  vibration motor power: 2KW×2; 1 set LUTON
heat tank
 screen meshes 5×5, 12×12, 25×25, 37×37. (Users can customize)

No.6: ASPHALT SUPPLYING SYSTEM(7.68KW)

Asphalt direct 40T hot oil coil heat exchanger indirect heating, rock wool insulation
6.1 1 set LUTON
heat tank insulation, outsourcing galvanized plate
Oil unloading
6.2 0.4m³ 1 set LUTON
tank
Asphalt unloading pump 5.5KW; Asphalt pump power: 3kW (frequency
6.3 Asphalt supplying 1 set LUTON
regulation)
6.4 Light oil burner Italian imports, 0.68KW 1 set LUTON
Heat transfer oil
6.5 1×1.5kW 1 set LUTON
pump
6.6 Asphalt pipeline Double layer insulation, asphalt tank to drying cylinder 1 set LUTON
Asphalt spraying
6.7 (Install on the drying cylinder) 1 set LUTON
pipe

No.7: CONTROL SYSTEM Qty Origin


Electrical control Container-type control cabinet; main components adopt German
7.1 1 set LUTON
system Siemens
Taiwan Wellun color touch screen (bilingual), Japan OMRON PLC
1 set Japan
control;
Weak current
7.2 Japan NIDEC inverter 1 set Japan
control system
program control automatic weighing, automatic impulse
1 set USA
compensation; Toledo sensor,

7.3 Wire and cable, bridge 1 set LUTON

7.4 Printer 1 set CHINA


Operating room
7.5 3.5m×2.2m×2.5m,with Media air conditioner 1 set LUTON
(single floor)
No.8: PNEUMATIC SYSTEM
Screw air compressor Motor power 30KW (Shanghai Kaisiwei);
8.1 Air compressor 1 set SHANGHAI
combustion, dust removal, central air supply in the main building
8.2 Gas tank 0.6m³*1 1 set LUTON
Taiwan
Pneumatic Taiwan AIRTAC cylinder 1 set
8.3 AIRTAC
Components solenoid valve (assembled before leaving the factory) 1 set LUTON
8.4 Pipes Quick plug, quick connect, anti-rust gas supply pipeline 1 set LUTON

No.9: OTHERS Qty Origin


9.1 quick-wear part Random used vulnerable parts 1 set LUTON
9.2 tool Common tools for installation and maintenance 1 set LUTON
9.3 documents Certificate, specification, foundation drawing, electrical schematic diagram 1 set LUTON
Belt machine, asphalt insulation pipe, lifting pipe (loading hopper)
9.4 Transport tooling 1 set LUTON
transport tooling; asphalt tank transport sliding boots (into the box)
9.5 protect Export standard 1 set LUTON
Filler Supply
NO.10 1 set LUTON
System
Filler Bin
Level indicator
Filler bin Level indicator
10.1 Filler System 1set LUTON
Temporary filler storage bin
Filler elevator
Screw conveyor (from filler bin to temporary filler storage bin)
Screw conveyor (from temporary storage bin to weighing bin),

Standard working condition mentioned contains the following factors


A. Environmental temperature is 20 ℃ with standard atmospheric pressure; altitude ≤2000m;
B. Average moisture content of cold aggregate <5%;
C. Hot aggregate temperature <160 ℃;
D. Finished materials is medium-grained, the density of cold aggregate ≥1600kg/m3;
E. Sand content <35%;
F. The ratio of aggregate shall meet the national standard. Dust content of cold aggregate ≤3%;
G. Cold aggregate should be clean enough without too much dirt or other material. Cold aggregate gradation should be
continuous;
H. Cold aggregate shall not contain large amounts of oversized material, otherwise it will cause blocking, resulting in
reduced ability to supply aggregate;
I. Moisture content of powder must be less than 0.5%, and there should be no lumping or arching, otherwise it will
cause supplying interruption or lag, which can affect the productivity;

PART VI. TECHNICAL DESCRIPTION

1. Design conditions and Precautions


Production capacity refers to the production capacity of the equipment under standard conditions, that is, the following
conditions are met:
A. Ambient temperature 20℃, standard atmospheric pressure;
B. The average water content of cold aggregate is <5%;
C. hot aggregate temperature <160℃;
D. The finished material is medium-grain type, that is, the stone material weight is≥1600kg/m3;
E. The content of stone chips or sand in the cold material ratio is <35%;
F. The aggregate of the stockyard should meet the requirements of the relevant national technical specifications; the
cold aggregate dust content is not more than 3%;
G. The cold aggregate must be clean, free of excessive dirt and debris, and must not contain a large amount of
super-size material. The gradation of cold aggregates should be continuous;
H. The water content of the powder must be less than 0.5%, the amount of powder added is not more than 8%; and
there should be no agglomeration or arching;
I. Asphalt should have good wrap performance. In the standard mixing cycle, the aggregate should be completely evenly
coated with asphalt. The asphalt temperature should be controlled within 150℃ ± 5℃ (common asphalt).

2. Specific Requirements For Fuel


For heavy oils in oil burners, be sure to meet the technical specifications in the table below:
A. calorific value ≥ 9600kcal / kg; B. 50℃ when the kinematic viscosity ≤ 180cst;
C. mechanical impurity content ≤ 0.3%; D. moisture ≤ 3%;
The user must purchase according to the requirements of the burner oil requirements, and require the oil supplier to
provide relevant quality certification documents such as oil test report, and the fuel used must have good combustion
performance and atomization performance. It is strictly forbidden to use various corrosive fuels.
3. User Provided And Burdened Projects
A. The cable required for the transformer to the control room; the cable required for the transformer to the heat
transfer oil furnace control cabinet.
B. Users should increase the foundation concrete according to the local geological conditions according to the
basic plane construction drawings provided by our company, or redesign the installation foundation and ancillary
facilities that are suitable for the equipment.
C. Cranes, power supplies, electrical welding equipment and the necessary tools for assembly and installation
work; lubricants and greases required for equipment; materials, materials and other consumables used in
foundations.
D. Materials, sand and gravel, asphalt, fuel oil, dump trucks, loaders and operators required during commissioning
and production; all facilities that need to be tested and tested.
E. If the equipment contains a heat-conducting oil furnace, the heat-conducting oil is supplied by the user and the
temperature is 320℃.
F. The power system is powered by a single-loop three-phase four-wire system. If there are special requirements,
it should be indicated in the contract. G. Other required equipment, tools, and work that are not described in this
configuration and parameters.
H. According to the local conditions, the lightning protection grounding facilities are the responsibility of the user
unit.

PART VII. PREPERATION NEED TO BE MADE FOR INSTALLATION


Item # Description Qty Need to Prepare Note
Pls leave 40 days for installation,
8 persons include 1-2 welder, and
1 Workers commissioning and operator training in
1-2 electrician
Zimbabwe
2 Truck Crane Qty: 1 set Capacity: 50ton
3 Welding Machine 1
4 Gas Cutting Machine 1
5 Heat conduction oil 1ton
6 Gear Oil 300kg
7 Lubricating oil 5 barrels
Tools such as pliers, Provided by supplier and will be shipped
8 1 set
wrench, hammer etc together with the machine
PART VIII. FACTORY VIEW
PART IX. SUCCESSFUL CASES