MARJAN INCREMENT PROGRAM PKG 6

PERMIT TO WORK ATTACHMENTS


HOT WORK PERMIT ATTACHMENTS

 Hazard Analysis
 PMT HRA Safety Review
Checklist
1 2
 Pre-Job Craft Safety  Job Safety Analysis
Meeting Form
3 4
 Method Statement  WPI Certificate copy
5 6
 Work Permit System
 WPR Certificate copy Checklist for Safety
7 8 Personnel

 Fire Watch Certificate


copy 9
COLD WORK PERMIT ATTACHMENTS

 Hazard Analysis
 PMT HRA Safety Review
Checklist
1 2
 Pre-Job Craft Safety  Job Safety Analysis
Meeting Form
3 4
 Method Statement  WPI Certificate copy
5 6
 Work Permit System
 WPR Certificate copy Checklist for Safety
7 8 Personnel

 Atmospheric Monitoring
Log Sheet
9
CONFINED SPACE ENTRY PERMIT ATTACHMENTS

 Confined Space  Confined Space Entry


ENTRY and EXIT
Log Sheet 1 2 Checklist Form

 Gas Test Certificate  Confined Space Entry


Form
3 4 Plan (CSEP)

 Authorized Gas Tester  Trained Stand-By Man


Certificate copy 5 6 Certificate copy
ADDITIONAL ATTACHMENTS

Flagman Certificate copy


Activity involved Heavy Equipment
Equipment Management Card

Daily Excavation Inspection Checklist Activity involved Excavation


Activity involved to any elevated area
Fall Protection Plan
more than 1.8 meters
Rigger Certificate Activity involved lifting by Crane or
Boom Truck and load is < 40T and
Non-Critical Lift Plan < 85% Crane Capacity
Activity involved Critical Lift as per
Critical Lift Plan
requirements of G.I. 7.028
Steel Erection Plan Activity involved Steel Structure
Material Safety Data Sheet (MSDS)
Activity involved with the use of
Chemical Hazard Bulletin (CHB)
any chemicals
Safety Data Sheets (SDS)