SHRI SAMARTH FABRICATION LLP

Pneumatic Test Procedure

Pneumatic Test Procedure


DOC. NO.: SSFLLP/CECO/AFPL/DCMS/Pneumatic/01

Rev. NO.: REV.00 (Dated – 08th April 2023).

--: OWNER :--


DCM SHRIRAM LIMITED

--: CONTRACTOR :--


ALLIED FURNACE PRIVATE LIMITED

--: SUPPLIER :--


CECO Emtrol Buell India Private Limited

A Approved No Comments
For CECO - Quality Reviewed with Document needs to be
B
comment resubmitted
For Allied Furnace For DCM Shriram
Approved / Reviewed
DATE
DATE

SIGN

SIGN Name - Name -


NOTE: Review by client whether or not resulting in comments shall not relieve
Contractor of any obligations or requirements under the contract and it shall
not be construed as an authorization of or consent to any deviation from
contract.

Page 1 of 5
SHRI SAMARTH FABRICATION LLP
Pneumatic Test Procedure

Index

Section Contents

1 Scope

2 Reference standard

3 Responsibilities

4 Test Preparation

5 Test Medium

6 Test Temperature

7 Test Pressure

8 Procedure

9 Inspection

10 Post Pneumatic Test Activity

11 Inspection Report

Page 2 of 5
SHRI SAMARTH FABRICATION LLP
Pneumatic Test Procedure

Pneumatic Test Procedure

1. Scope

This procedure is applicable for leak testing of pneumatically pressurizing Equipment’s .

2. Reference documents

Approved drawing.
Approved ITP

3. Responsibilities

Responsibilities related to leak testing in accordance to this procedure:

a. Production Engineer (PE)


i. Preparation and Performance of leak test

ii. Ensuring Safety requirements are met

b. Quality Control Engineer (QCE)


i. Monitoring of leak test

ii. Inspection during and after attainment of test pressure

iii. Recording of results and preparation of leak test report

In absence of PE, the Production Manager (PM) and in absence of QCE, the Quality
Control Manager will carry out the above respective functions.

4. Test Preparation

a. Pneumatic testing shall be taken up after completion of weld joint.

The QCM shall review the ITP and accompanying documents for verification of
completeness of welding, and NDT prior to taking the Job for pneumatic testing.

b. Prior to pneumatic test PE shall ensure the following:

i. PT testing of welding joints.


ii. Soap solution shall be prepared for testing using Detergent and water

iii. External surface of equipment, including weld faces, shall be cleaned of any oil,
grease, or other contaminants.

5. Test Medium

Compressed air shall be used as test medium.

6. Test Temperature

Ambient.

7. Test Pressure

Test pressure shall be maintained at as per approved drawing.

Page 3 of 5
SHRI SAMARTH FABRICATION LLP
Pneumatic Test Procedure

8. Procedure

i. Duct shall be pressurized to pressure gradually. Test pressure shall be maintained


for 30 minutes before applying the soap solution.

ii. Apply soap solution on all butt weld joints.

iii. Check the leakage at the weld joint. If there is leakage at the weld joint, then

bubbles will be formed.

9. Inspection

Pressure shall be maintained for a time period sufficient to permit inspection of al


the duct weld joints. Visual inspection shall be carried out for all butt weld joints.
Leaking weld joints shall be clearly marked.

In case of leaks being found, the equipment shall be depressurized.


The re-welding of leaking weld joint, weld joint shall be carried out.The

test shall be repeated to check the leakage of those weld joints.

10. Post Pneumatic Test Activity

After completion of pneumatic testing, the test pressure shall be gradually


released and vents opened.

11. Inspection report

After satisfactory completion of pneumatic/leak test, the results shall be recorded


in the Pneumatic Pressure Test Report.

Page 4 of 5
SHRI SAMARTH FABRICATION LLP
Pneumatic Test Procedure

Pneumatic Pressure Test Report

Report No. : Date :

Job No. : P.O. No. & Date :

Client : Equipment :

Project : Item Code :


Drawing No. & Rev. Procedure No. & Rev.
: :
(Client Document No.) (Client Document No.)
ITP No./MPS No.
: Qty. :
(Client Document No.)
Tag No./ Identification
:
No.
System Test Detail
Design :
Pressure
Test Pressure :

Temperature :

Test Position : Horizontal / Vertical

Medium : Air
Pressure Test Record
Duration : minutes

Pressure Gauge Details


Serial Number :

Make :

Range : kg/cm2
Calibration Report No.
& Date of calibration

Remarks if any :

Test Result :

Accepted Y Not Accepted X

Witnessed by TPI

Page 5 of 5