Tender Nec Contract
Tender Nec Contract
and
(Reg No. ___________ )
Contents: No of
pages
Part C1 Agreements & Contract Data 25
Part C2 Pricing Data 5
Part C3 Scope of Work 20
Part C4 Site Information 4
CONTRACT No.
ESKOM HOLDINGS SOC Ltd
Contents: No of
pages
C1.1 Form of Offer and Acceptance 3
By the representative of the tenderer, deemed to be duly authorised, signing this part of this Form of Offer
and Acceptance the tenderer offers to perform all of the obligations and liabilities of the Contractor under the
contract including compliance with all its terms and conditions according to their true intent and meaning for
an amount to be determined in accordance with the conditions of contract identified in the Contract Data.
This Offer may be accepted by the Employer by signing the Acceptance part of this Form of Offer and
Acceptance and returning one copy of this document including the Schedule of Deviations (if any) to the
tenderer before the end of the period of validity stated in the Tender Data, or other period as agreed,
whereupon the tenderer becomes the party named as the Contractor in the conditions of contract identified
in the Contract Data.
Signature(s)
Name(s)
Capacity
For the
tenderer:
1 This total is required by the Employer for budgeting purposes only. Actual amounts due will be assessed in
terms of the conditions of contract.
PART C1: AGREEMENT & CONTRACT DATA PAGE 1 C1.1 ECC3 FORM OF OFFER AND ACCEPTANCE
ESKOM HOLDINGS SOC Ltd. CONTRACT NUMBER ______________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
Acceptance
By signing this part of this Form of Offer and Acceptance, the Employer identified below accepts the
tenderer’s Offer. In consideration thereof, the Employer shall pay the Contractor the amount due in
accordance with the conditions of contract identified in the Contract Data. Acceptance of the tenderer’s Offer
shall form an agreement between the Employer and the tenderer upon the terms and conditions contained in
this agreement and in the contract that is the subject of this agreement.
Part C1 Agreements and Contract Data, (which includes this Form of Offer and Acceptance)
and drawings and documents (or parts thereof), which may be incorporated by reference into the above
listed Parts.
Deviations from and amendments to the documents listed in the Tender Data and any addenda thereto listed
in the Returnable Schedules as well as any changes to the terms of the Offer agreed by the tenderer and the
Employer during this process of offer and acceptance, are contained in the Schedule of Deviations attached
to and forming part of this Form of Offer and Acceptance. No amendments to or deviations from said
documents are valid unless contained in this Schedule.
The tenderer shall within two weeks of receiving a completed copy of this agreement, including the Schedule
of Deviations (if any), contact the Employer’s agent (whose details are given in the Contract Data) to arrange
the delivery of any securities, bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the Contract Data at, or just after, the date this
agreement comes into effect. Failure to fulfil any of these obligations in accordance with those terms shall
constitute a repudiation of this agreement.
Notwithstanding anything contained herein, this agreement comes into effect on the date when the tenderer
receives one fully completed original copy signed between them of this document, including the Schedule of
Deviations (if any).
Unless the tenderer (now Contractor) within five working days of the date of such receipt notifies the
Employer in writing of any reason why he cannot accept the contents of this agreement, this agreement shall
constitute a binding contract between the Parties.
Signature(s)
Name(s)
Capacity
for the
Employer
Note: If a tenderer wishes to submit alternative tenders, use another copy of this Form of Offer and
Acceptance.
PART C1: AGREEMENT & CONTRACT DATA PAGE 2 C1.1 ECC3 FORM OF OFFER AND ACCEPTANCE
ESKOM HOLDINGS SOC Ltd. CONTRACT NUMBER ______________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
1 [●] [●]
2 [●] [●]
3 [●] [●]
4 [●] [●]
5 [●] [●]
6 [●] [●]
7 [●] [●]
By the duly authorised representatives signing this Schedule of Deviations below, the Employer and the
tenderer agree to and accept this Schedule of Deviations as the only deviations from and amendments to the
documents listed in the Tender Data and any addenda thereto listed in the Tender Schedules, as well as any
confirmation, clarification or changes to the terms of the Offer agreed by the tenderer and the Employer
during this process of Offer and Acceptance.
It is expressly agreed that no other matter whether in writing, oral communication or implied during the period
between the issue of the tender documents and the receipt by the tenderer of a completed signed copy of
this Form shall have any meaning or effect in the contract between the parties arising from this Agreement.
Name
Capacity
On behalf (Insert name and address of organisation) (Insert name and address of organisation)
of
Name &
signature
of witness
Date
PART C1: AGREEMENT & CONTRACT DATA PAGE 3 C1.1 ECC3 FORM OF OFFER AND ACCEPTANCE
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
X16: Retention
10.1 The Employer is (Name): Eskom Holdings SOC Ltd (reg no:
2002/015527/30), a state owned company
incorporated in terms of the company laws of
the Republic of South Africa
Fax [●]
e-mail Bindam@eskom.co.za
Address [●]
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 1 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
e-mail [●]
11.2(14) The following matters will be included in 1. Weather. Inclement weather i.e extreme
the Risk Register rain, snow and strong winds. The
contractor needs to take precautions when
planning the sequence and resources for
the works. Reliable wind speed meters
should be acquired and recordings to be
kept during periods where work could not
be done due to high winds in the area.
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 2 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
11.2(15) The boundaries of the site are Refer to Appendix A for Gauteng and North
West Sites and Appendix B for Mpumalanga &
Limpopo Sites
11.2(19) The Works Information is in Part 3: Scope of Work and all documents and
drawings to which it makes reference.
12.2 The law of the contract is the law of the Republic of South Africa
3 Time
11.2(3) The completion date for the whole of the
works is TBA
11.2(9) The key dates and the conditions to be Condition to be met key date
met are:
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 3 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
1 [●] TBA
2 [●] TBA
3 [●] TBA
5 Payment
50.1 The assessment interval is between the 25th day of each successive
month.
51.4 The interest rate is the publicly quoted prime rate of interest
(calculated on a 365 day year) charged from
time to time by the Standard Bank of South
Africa Limited (as certified, in the event of any
dispute, by any manager of such bank, whose
appointment it shall not be necessary to prove)
for amounts due in Rands and
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 4 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
6 Compensation events
60.1(13) The place where weather is to be
recorded is: Refer to Appendix A for Gauteng and North
West sites and Appendix B for Mpumalanga
The weather measurements are supplied The South African Weather Bureau
by
and which are available from: the South African Weather Bureau and
included in Annexure A to this Contract Data
provided by the Employer
60.1(13) Assumed values for the ten year return As stated in Annexure A to this Contract Data
weather data for each weather provided by the Employer.
measurement for each calendar month
are: Note: If this arrangement is used, delete the rows above
for 60.1(13) and delete this note.
2. [●]
3. [●]
84.1 The Employer provides these insurances as stated for “Format A” / “Format B” / “Format
from the Insurance Table Dx” {choose the applicable format then delete the others
and delete this note} available on
http://www.eskom.co.za/Tenders/InsurancePolicie
sProcedures/Pages/EIMS_Policies_
From_1_April_2014_To_31_March_2015.aspx
(See Annexure B for basic guidance)
84.2 The minimum limit of indemnity for As prescribed by the Compensation for
insurance in respect of death of or bodily Occupational Injuries and Diseases Act No. 130
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 5 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
injury to employees of the Contractor of 1993 and the Contractor’s common law
arising out of and in the course of their liability for people falling outside the scope of
employment in connection with this the Act with a limit of Indemnity of not less
contract for any one event is than R500 000 (Five hundred thousand Rands).
Address [●]
e-mail [●]
W1.2(3) The Adjudicator nominating body is: the Chairman of ICE-SA a joint Division of the
South African Institution of Civil Engineering
and the London Institution of Civil Engineers.
(See www.ice-sa.org.za ) or its successor body.
W1.4(5) The arbitration procedure is the latest edition of Rules for the Conduct of
Arbitrations published by The Association of
Arbitrators (Southern Africa) or its successor
body.
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 6 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
0.15 non-adjustable
Total 1.00
X7.1 Delay damages for Completion of the 0.1% per day up to a limit of 15% of total
whole of the works are contract value
X18.2 For any one event, the Contractor’s the amount of the deductibles relevant to the
liability to the Employer for loss of or event described in the insurance policy format
damage to the Employer’s property is selected in the data for clause 84.1 above,
limited to: which policy is available on
http://www.eskom.co.za/Tenders/InsurancePolicie
sProcedures/Pages/EIMS_Policies_
From_1_April_2014_To_31_March_2015.aspx
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 7 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
X18.4 The Contractor’s total liability to the the total of the Prices other than for the
Employer for all matters arising under or in additional excluded matters.
connection with this contract, other than
excluded matters, is limited to: The Contractor’s total liability for the additional
excluded matters is not limited.
X18.5 The end of liability date is (i) [●] years after the defects date for latent
Defects and
Z1.1 The Contractor does not cede, delegate or assign any of its rights or obligations to any person
without the written consent of the Employer.
Z1.2 Notwithstanding the above, the Employer may on written notice to the Contractor cede and
delegate its rights and obligations under this contract to any of its subsidiaries or any of its
present divisions or operations which may be converted into separate legal entities as a result
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 8 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
Z2 Joint ventures
Z2.1 If the Contractor constitutes a joint venture, consortium or other unincorporated grouping of two
or more persons or organisations then these persons or organisations are deemed to be jointly
and severally liable to the Employer for the performance of this contract.
Z2.2 Unless already notified to the Employer, the persons or organisations notify the Project
Manager within two weeks of the Contract Date of the key person who has the authority to bind
the Contractor on their behalf.
Z2.3 The Contractor does not alter the composition of the joint venture, consortium or other
unincorporated grouping of two or more persons without the consent of the Employer having
been given to the Contractor in writing.
Z3.1 Where a change in the Contractor’s legal status, ownership or any other change to his business
composition or business dealings results in a change to the Contractor’s B-BBEE status, the
Contractor notifies the Employer within seven days of the change.
Z3.2 The Contractor is required to submit an updated verification certificate and necessary
supporting documentation confirming the change in his B-BBEE status to the Project Manager
within thirty days of the notification or as otherwise instructed by the Project Manager.
Z3.3 Where, as a result, the Contractor’s B-BBEE status has decreased since the Contract Date the
Employer may either re-negotiate this contract or alternatively, terminate the Contractor’s
obligation to Provide the Works.
Z3.4 Failure by the Contractor to notify the Employer of a change in its B-BBEE status may
constitute a reason for termination. If the Employer terminates in terms of this clause, the
procedures on termination are P1, P2 and P3 as stated in clause 92, and the amount due is A1
and A3 as stated in clause 93.
Z4 Confidentiality
Z4.1 The Contractor does not disclose or make any information arising from or in connection with
this contract available to Others. This undertaking does not, however, apply to information
which at the time of disclosure or thereafter, without default on the part of the Contractor, enters
the public domain or to information which was already in the possession of the Contractor at the
time of disclosure (evidenced by written records in existence at that time). Should the
Contractor disclose information to Others in terms of clause 25.1, the Contractor ensures that
the provisions of this clause are complied with by the recipient.
Z4.2 If the Contractor is uncertain about whether any such information is confidential, it is to be
regarded as such until notified otherwise by the Project Manager.
Z4.3 In the event that the Contractor is, at any time, required by law to disclose any such information
which is required to be kept confidential, the Contractor, to the extent permitted by law prior to
disclosure, notifies the Employer so that an appropriate protection order and/or any other action
can be taken if possible, prior to any disclosure. In the event that such protective order is not,
or cannot, be obtained, then the Contractor may disclose that portion of the information which it
is required to be disclosed by law and uses reasonable efforts to obtain assurances that
confidential treatment will be afforded to the information so disclosed.
Z4.4 The taking of images (whether photographs, video footage or otherwise) of the works or any
portion thereof, in the course of Providing the Works and after Completion, requires the prior
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 9 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
written consent of the Project Manager. All rights in and to all such images vests exclusively in
the Employer.
Z4.5 The Contractor ensures that all his subcontractors abide by the undertakings in this clause.
Z5.1 Any extension, concession, waiver or relaxation of any action stated in this contract by the
Parties, the Project Manager, the Supervisor, or the Adjudicator does not constitute a waiver of
rights, and does not give rise to an estoppel unless the Parties agree otherwise and confirm
such agreement in writing.
Z6.1 The Contractor undertakes to take all reasonable precautions to maintain the health and safety
of persons in and about the execution of the works. Without limitation the Contractor:
accepts that the Employer may appoint him as the “Principal Contractor” (as defined and
provided for under the Construction Regulations 2014 (promulgated under the Occupational
Health & Safety Act 85 of 1993) (“the Construction Regulations”) for the Site;
warrants that the total of the Prices as at the Contract Date includes a sufficient amount for
proper compliance with the Construction Regulations, all applicable health & safety laws
and regulations and the health and safety rules, guidelines and procedures provided for in
this contract and generally for the proper maintenance of health & safety in and about the
execution of works; and
undertakes, in and about the execution of the works, to comply with the Construction
Regulations and with all applicable health & safety laws and regulations and rules,
guidelines and procedures otherwise provided for under this contract and ensures that his
Subcontractors, employees and others under the Contractor’s direction and control,
likewise observe and comply with the foregoing.
Z6.2 The Contractor, in and about the execution of the works, complies with all applicable
environmental laws and regulations and rules, guidelines and procedures otherwise provided
for under this contract and ensures that his Subcontractors, employees and others under the
Contractor’s direction and control, likewise observe and comply with the foregoing.
Z7.1 Within one week of receiving a payment certificate from the Project Manager in terms of core
clause 51.1, the Contractor provides the Employer with a tax invoice in accordance with the
Employer's procedures stated in the Works Information, showing the amount due for payment
equal to that stated in the payment certificate.
Z7.2 If the Contractor does not provide a tax invoice in the form and by the time required by this
contract, the time by when the Employer is to make a payment is extended by a period equal in
time to the delayed submission of the correct tax invoice. Interest due by the Employer in terms
of core clause 51.2 is then calculated from the delayed date by when payment is to be made.
Z7.3 The Contractor (if registered in South Africa in terms of the companies Act) is required to
comply with the requirements of the Value Added Tax Act, no 89 of 1991 (as amended) and to
include the Employer’s VAT number 4740101508 on each invoice he submits for payment.
Z8.1 Delete from the last sentence in core clause 61.3, “unless the Project Manager should have
notified the event to the Contractor but did not”.
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 10 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
Z9.1 The Employer’s liability to the Contractor for the Contractor’s indirect or consequential loss is
limited to R0.00 (zero Rand)
Z9.2 The Contractor’s entitlement under the indemnity in 83.1 is provided for in 60.1(14) and the
Employer’s liability under the indemnity is limited.
Termination: Add to core clause 91.1, at the second main bullet point, fourth sub-bullet
Z10
point, after the words "against it":
Z11 Addition to secondary Option X7 Delay damages (if applicable in this contract)
Z11.1 If the amount due for the Contractor’s payment of delay damages reaches the limits stated in
this Contract Data for Option X7 or Options X5 and X7 used together, the Employer may
terminate the Contractor’s obligation to Provide the Works using the same procedures and
payment on termination as those applied for reasons R1 to R15 or R18 stated in the
Termination Table.
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 11 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
Z12 Ethics
Affected Party means, as the context requires, any party, irrespective of whether it is the Contractor
or a third party, such party’s employees, agents, or Subcontractors or
Subcontractor’s employees, or any one or more of all of these parties’ relatives or
friends,
Coercive Action means to harm or threaten to harm, directly or indirectly, an Affected Party or the
property of an Affected Party, or to otherwise influence or attempt to influence an
Affected Party to act unlawfully or illegally,
Collusive Action means where two or more parties co-operate to achieve an unlawful or illegal
purpose, including to influence an Affected Party to act unlawfully or illegally,
Committing Party means, as the context requires, the Contractor, or any member thereof in the case of
a joint venture, or its employees, agents, or Subcontractors or the Subcontractor’s
employees,
Corrupt Action means the offering, giving, taking, or soliciting, directly or indirectly, of a good or
service to unlawfully or illegally influence the actions of an Affected Party,
Fraudulent Action means any unlawfully or illegally intentional act or omission that misleads, or
attempts to mislead, an Affected Party, in order to obtain a financial or other benefit
or to avoid an obligation or incurring an obligation,
Obstructive Action means a Committing Party unlawfully or illegally destroying, falsifying, altering or
concealing information or making false statements to materially impede an
investigation into allegations of Prohibited Action and
Prohibited Action means any one or more of a Coercive Action, Collusive Action Corrupt Action,
Fraudulent Action or Obstructive Action.
Z 12.1 A Committing Party may not take any Prohibited Action during the course of the procurement of this
contract or in execution thereof.
Z 12.2 The Employer may terminate the Contractor’s obligation to Provide the Works if a Committing Party
has taken such Prohibited Action and the Contractor did not take timely and appropriate action to
prevent or remedy the situation, without limiting any other rights or remedies the Employer has. It is
not required that the Committing Party had to have been found guilty, in court or in any other similar
process, of such Prohibited Action before the Employer can terminate the Contractor’s obligation to
Provide the Works for this reason.
Z 12.3 If the Employer terminates the Contractor’s obligation to Provide the Works for this reason, the
procedures and amounts due on termination are respectively P1, P2 and P3, and A1 and A3.
Z 12.4 A Committing Party co-operates fully with any investigation pursuant to alleged Prohibited Action.
Where the Employer does not have a contractual bond with the Committing Party, the Contractor
ensures that the Committing Party co-operates fully with an investigation.
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 12 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
Weather measurement
Month Cumulative Number of days Number of days Number of days [Other
rainfall (mm) with rain more with min air with snow lying measurements
than 10mm temp < 0 deg.C at 08:00 CAT if applicable]
January [●] [●] [●] [●]
February [●] [●] [●] [●]
March [●] [●] [●] [●]
April [●] [●] [●] [●]
May [●] [●] [●] [●]
June [●] [●] [●] [●]
July [●] [●] [●] [●]
August [●] [●] [●] [●]
September [●] [●] [●] [●]
October [●] [●] [●] [●]
November [●] [●] [●] [●]
December [●] [●] [●] [●]
Only the difference between the more adverse recorded weather and the equivalent measurement given
above is taken into account in assessing a compensation event.
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 13 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
1. For the purpose of works contracts, insurance provided by Eskom (the Employer) has been arranged on
the basis of “project” or “contract” value, where the value is the total of the Prices at Completion of the
whole of the works including VAT.
2. For ECC3 there are three main “formats” of cover and deductible structure; Format A, Format B and
Format Dx.
Format A is for a project or contract value less than or equal to R350M (three hundred and fifty million Rand)
inclusive of VAT.
Format B is for a project or contract value greater than R350M .(three hundred and fifty million Rand) inclusive
of VAT.
For a contract / package of R50M which is part of a R400M project, Format B will apply
For a contract / package of R250M which is part of a R6 billion project, Format B will apply;
For a contract / package of R120M which is part of a R350M project Format A will apply;
For a contract which is not part of a project the same limits apply:
Format Dx applies only to Distribution Division projects and contracts. If a Distribution Division project or
contract exceeds the Format A limit, the Eskom Insurance Management Services [EIMS] need to be
contacted for advice on how to formulate the insurance cover. Cover and deductibles for Distribution
Division are per the relevant policy available on the internet web link given below.
3. Tendering contractors should note that cover provided by the Employer is only per the policies available
on the internet web link listed below and may not be the cover required by the tendering contractor or as
intended by each of the listed insurances in the left hand column of the Insurance Table in clause 84.2.
In terms of clause 84.1 “the Contractor provides the insurances stated in the Insurance Table except any
insurance which the Employer is to provide”. Hence the Contractor provides insurance which the
Employer does not provide and in cases where the Employer does provide insurance the Contractor
insures for the difference between what the Insurance Table requires and what the Employer provides.
4. When the Marine Insurance is required the Contractor needs to obtain a copy of the latest edition of
Eskom’s Marine Policies Procedures found at internet website given below.
5. Further information and full details of all Eskom provided policies and procedures may be
obtained from:
http://www.eskom.co.za/live/content.php?Item_ID=9248
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 14 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 15 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
Appendix B –Mpumalanga
Aircons
Nelspruit
Co-ordinates
Site ddd mm ss.s format
Three sisters RS S25 37 51.0 E31 23 14.0
Kaapsehop RS S25 31 02.5 E30 46 37.9
Kaapsehoop Sentec RS S25 30 57.4 E30 46 34.9
Lebombo RS S25 27 53.0 E31 58 44.0
Lochiel RS S26 06 54.2 E30 46 01.1
Lydenburg valley RS S24 57 55.0 E30 22 42.0
Nelshoogte RS S25 51 50.0 E30 48 40.0
PMC Koppie RS S23 59 13.0 E31 09 17.0
Spekboom RS S24 37 54.4 E30 20 20.5
Steelport RS S24 41 12.0 E30 11 34.0
Crossing RS S24 45 17.6 E30 08 58.6
Limpopo
Co-ordinates
Site ddd mm ss.s format
Nedbank buidling & 2 x
FM S23 54 34.5 E29 27 11.4
New Thabazimbi Rs S24 32 27.0 E27 24 10.3
Old Thabazimbi RS S24 28 04.5 E27 36 43.3
Louis Trichard RS S23 00 12.3 E29 45 16.5
Shakadza(Thoyando) S22 39 19.0 E30 31 41.0
Ofcolaco Rs & TAD S24 06 26.0 E30 25 30.0
Ravens hill Rs S23 37 11.7 E30 15 19.7
Steilloop RS S23 36 40.3 E28 49 27.2
Rooirandt RS S23 04 57.0 E28 27 33.0
Stylkop S24 12 01.0 E29 38 09.0
Zandspruit Rs S24 12 08.6 E28 55 16.0
S23 17 44,3 E 30 44
Mangombe 51,3
Witbank
Co-ordinates
Site ddd mm ss.s format
Carolina RS S26 01 43.0 E30 11 25.0
Carolina TSC S26 04 31.6 E30 07 30.4
De BrookRS S26 10 27.4 E30 38 05.4
Dewagendrift RS S25 18 49.6 E29 26 24.1
Elandsdoorn RS S25 15 51.9 E29 12 33.1
Golfsig RS S25 45 53.6 E29 26 22.3
Greenside 2 S25 58 13.8 E29 10 42.1
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 16 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NO. ________________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 17 C1.2A ECC3 CONTRACT DATA PART 1
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
1. Please read both the NEC3 Engineering and Construction Contract (April 2013) and the relevant
parts of its Guidance Notes (ECC3-GN)1 in order to understand the implications of this Data which
the tenderer is required to complete. An example of the completed Data is provided on pages 156 to
158 of the ECC3 (April 2013) Guidance Notes.
2. The number of the clause which requires the data is shown in the left hand column for each
statement however other clauses may also use the same data
3. Where a form field like this [ ] appears, data is required to be inserted relevant to the option
selected. Click on the form field once and type in the data. Otherwise complete by hand and in ink.
Completion of the data in full, according to Options chosen, is essential to create a complete contract.
Address
Tel No.
Fax No.
1 Name:
Job:
Responsibilities:
Qualifications:
Experience:
2 Name:
Job
Responsibilities:
Qualifications:
Experience:
1 Available from Engineering Contract Strategies Tel 011 803 3008, Fax 011 803 3009 or see www.ecs.co.za
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 1 C1.2B ECC3 CONTRACT DATA PART 2
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
F Management contract
A Priced contract with activity schedule Data for the Shorter Schedule of Cost
Components
B Priced contract with bill of quantities Data for the Shorter Schedule of Cost
Components
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 2 C1.2B ECC3 CONTRACT DATA PART 2
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 3 C1.2B ECC3 CONTRACT DATA PART 2
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 4 C1.2B ECC3 CONTRACT DATA PART 2
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER ____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
PART C1: AGREEMENTS AND CONTRACT DATA PAGE 5 C1.2B ECC3 CONTRACT DATA PART 2
ESKOM HOLDINGS SOC Ltd CONTRACT NO. _________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL .
Document Title No of
reference pages
C2.1 Pricing assumptions: Option B 3
Identified and 11
defined terms 11.2 (21) The Bill of Quantities is the bill of quantities as changed in accordance
with this contract to accommodate implemented compensation events and for
accepted quotations for acceleration.
the quantity of the work which the Contractor has completed for each item
in the Bill of Quantities multiplied by the rate and
a proportion of each lump sum which is the proportion of the work covered
by the item which the Contractor has completed.
(31) The Prices are the lump sums and the amounts obtained by multiplying
the rates by the quantities for the items in the Bill of Quantities.
This confirms that Option B is a re-measurement contract and the bill comprises only items measured using
quantities and rates or stated as lump sums. Value related items are not used. Time related items are items
measured using rates where the rate is a unit of time.
There is no general provision in Option B for payment for materials on Site before incorporation into the
works. If secondary Option X14 Advanced payment has not been used then the tendering contractor may
obtain the same effect by inserting appropriate items in the method related charges where the method of
measurement allows, or alternatively making allowance in the rates of the bill of quantities for the financing
of Plant and Materials until they are incorporated in the works.
When compensation events arise, the default position is that the Bill of Quantities is not used to calculate
the cost effect of the event. Defined Cost and the resulting Fee is used and Defined Cost includes all
components of cost which the Contractor is likely to incur, including so called P & G items. Rates and
lump sums from the Bill of Quantities, or from any other source, may be used instead of Defined Cost and
the Fee only if the Contractor and Project Manager agree. If they are unable to agree, then Defined Cost
Abbreviation Unit
% percent
h hour
ha hectare
kg kilogram
kl kilolitre
km kilometre
km-pass kilometre-pass
kPa kilopascal
kW kilowatt
l litre
m metre
mm millimetre
m2 square metre
m2-pass square metre pass
m3 cubic metre
m3-km cubic metre-kilometre
MN meganewton
MN.m meganewton-metre
MPa megapascal
No. number
sum Lump sum
t tonne (1000kg)
4.3.1.
Use this page as a summary page or as a cover page to the bill of quantities.
Document Title No of
reference pages
This cover page 1
Contents
PART C3: SCOPE OF WORK PAGE 2 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
PART C3: SCOPE OF WORK PAGE 3 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
PART C3: SCOPE OF WORK PAGE 4 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
The aim of this project is to supply, deliver, install and commission Air-conditioner units in order to provide
the right cooling temperature for Telecommunication Equipment at various Eskom Radio Sites within
Gauteng, North West, Mpumalanga and Limpopo.
PART C3: SCOPE OF WORK PAGE 5 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
Regular meetings of a general nature may be convened and chaired by the Project Manager as follows:
Title and purpose Approximate time & interval Location Attendance by:
Risk register and Weekly on ________ at
compensation events ___
Overall contract progress Monthly on _____ at ___ Employer, Contractor,
and feedback Supervisor, and ___
Meetings of a specialist nature may be convened as specified elsewhere in this Works Information or if not
so specified by persons and at times and locations to suit the Parties, the nature and the progress of the
works. Records of these meetings shall be submitted to the Project Manager by the person convening the
meeting within five days of the meeting.
All meetings shall be recorded using minutes or a register prepared and circulated by the person who
convened the meeting. Such minutes or register shall not be used for the purpose of confirming actions or
instructions under the contract as these shall be done separately by the person identified in the conditions of
contract to carry out such actions or instructions.
The documentation supplied by the Contractor shall include be in both hard copy and electronic form. A
minimum of three hard copies will be provided. Each document shall include, at a minimum, the following
information:
• Title
• Status
• Revision
• References
• Purpose
• Description
It is the Contractor’s responsibility to also ensure that the safety file has been audited by the Eskom Health
and Safety Representatives before establishing site.
PART C3: SCOPE OF WORK PAGE 6 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
The Contractor must be in possession of current first aid certificate. All tools must have valid and current test
certificates, which must be produced two weeks before site establishment.
The Contractor will only leave site once a written site instruction has been issued by an Eskom site
representative. Working hours will be from 08h00 to 16h00 during week days (as per outages) ,weekend
work to be carried out only on request by Eskom.
A site specific activity, safety and risk assessment must be done BEFORE the contractor starts works on
site. The site supervisor will be monitoring the works continuously to ensure strict adherence to Safety rules.
If needed, the contractor is to visit the site at the Contractor’s own cost before work commences to familiarize
with the scope of works and to assess any safety issues.
The Contractor shall allow safe access for other contractors and Eskom personnel when required.
The Contractor shall establish a refuse control system. All waste is to be collected and disposed of as
required by Eskom and the local authority.
The Contractor shall make his own arrangements for the provision of accommodation for his employees.
The Contractor is required to ensure that all goods, services or works supplied in terms of the
tender/contract/order conform to
• all applicable environment legislation,
• 32-727: Eskom SHEQ Policy,
• 32-726: SHE Requirements for the Eskom Commercial Process.
• Eskom Environmental, Occupational Health and Safety Incident Management procedure 32-95
• Eskom Waste Management Standard 32-245
The Eskom Transmission Environmental Management Programme provides the aspects and impacts that
will require management and must be followed strictly. For tendering purposes, contractor shall prepare the
following method statements for all environmental concerns raised through the Eskom Transmission
Environmental Management Plan and in any other relevant forum such clarification meetings
• Water supply
• Waste management
• Storage of hazardous material
• Noise management
• Dust management
• Vehicle maintenance and refuelling (in case of an emergency)
• Accessibility of the site (access road)
• Equipment and construction material storage
Any changes to the approved method statements / mitigation plan shall be reported and approved by Eskom
Transmission Environmental representative and Project Manager prior to the commencement of work and
during construction. The main supplier must ensure that all sub-contractors’ environmental mitigation plan
comply with legal and other requirements and also includes all the environmental risks associated with the
scope of work. The main (principal) contract shall define the specific system elements (risk) applicable to the
subcontractor’s scope of work or supply.
PART C3: SCOPE OF WORK PAGE 7 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
No environmental records shall be destroyed or discarded by the supplier. Eskom and the supplier shall
agree that the supplier retains certain environmental records.
The Contractor is to send a flash report for any environmental incidents that have occurred on site as soon
as possible or within 24 hours to the Grid Environmental Advisor Contact person: Luckyboy Isaac, Contact
No. 078 337 0241and PM, clearly stating any impact to the environment.
Waste generated during watershed strengthening project must be disposed at a registered site and
contractor shall retain records of disposal. This include waste generated during demolish of the existing type
oil holding dam and existing septic tank
Should the contractor be required to recycle waste during project, Contractor will be required to submit the
name, registration certificate and /or waste management licence for a company which will be doing the
recycling. Contractor should provide letter of agreement between the facility and them (recycling only).
Deviations from these requirements will be regarded as a non-conformance. Should there be concerns
regarding environmental performance and non-conformance to environmental requirements, management
engagements and interventions will be introduced to determine a means to addressing the shortfalls.
Once these interventions have been explored and exhausted, then the Eskom supplier disciplinary process
must be followed.
NB: The Contractor is to compile a complete environmental file. The file needs to be audited and approved
by the Transmission Environmental Department (Contact person: Luckyboy Isaac, Contact No. 078 337
0241 prior to commencement of work.
2.5 Quality assurance requirements
The following standards contain provisions that, through reference in this text, constitute provisions of this
specification. At the time of publication the revisions indicated were valid. All standards are subject to review,
and parties entering into service agreements based on this specification are encouraged to investigate the
possibility of applying the most recent revisions of the standards listed below. Information on currently valid
national and international standards may be obtained from the Information Centre at Megawatt Park and
Technology Standardisation Department.
In the event of conflict between documents invoked here and the contents of this specification, the
contents of this specification shall be considered to have preference. Such conflict shall be pointed out to the
Employer for confirmation.
• Eskom NWS 1674 - “Standard Specification for approval of drawings submitted by Contractors and
Contractors.”
• Project Quality plan
The Employer requires that the Contractor operate a quality management system as stated in the Scope.
The Employer requires that the Contractor provide a quality policy statement and quality plan which complies
with requirements stated in the Scope.
Applicable documentation:
32-727 –Eskom SHEQ Policy
Supplier Quality Management Spec-QM58 -240-105658000.
2.6 Programming constraints
A comprehensive and fully detailed programme is to be submitted within the seven (7) days after the
inaugural meeting and should be in MS Project format, indicating all milestones and critical dates. This
programme must first be approved by the Project Manager and must be updated monthly or as requested by
the Project Manager. Only MS Projects format will be allowed.
Updated programmes must be available at all site meetings reflecting progress to date.
PART C3: SCOPE OF WORK PAGE 8 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
The Contractor shall address the tax invoice to ESKOM HOLDINGS SOC LIMITED (Reg No.
2002/015527/06) and include on each invoice the following information
The Contractor attaches the detailed assessment of the amount due to each tax invoice showing the Price
for Work Done to Date for each item in the Price List for work which he has completed.
A tax invoice shall be submitted on completion of the works in the format required. A breakdown of all work
completed during the previous period shall be attached. Invoicing and relevant details will be discussed at
site hand-over meeting. Payments will be processed once all completion certificates and invoices are
submitted
All quantities claimed must be verified and signed by the site supervisor on the 20th of each month or within
1 week after each sectional completion and the signed BOQ must accompany the invoice which should be
submitted to the PM before the 25th of each month. Late invoices will be deferred to the following month and
no concessions will be made.
2.9 Insurance provided by the Employer
Refer to Core Clause 87.1
The Employer may withhold payment of amounts due to the Contractor until the bond or guarantee required
in terms of this contract has been received and accepted by the person notified to the Contractor by the
Project Manager to receive and accept such bond or guarantee. Such withholding of payment due to the
Contractor does not affect the Employer’s right to termination stated in this contract.
PART C3: SCOPE OF WORK PAGE 9 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
In an event of labour costs, the Contractor is required to provide pay slips of the employees used. The labour
mark-up indicated in this contract will be added to these actual costs to form the final value of the
compensation event.
In the event that the Contractor is required to supply anything other than people, the Contractor is required to
provide a copy of his Contractors invoice. The profit and overhead mark-up indicated in this contract will be
added to these actual costs to form the final value of the compensation event.
Copies of payslips and Contractors invoices are to accompany the requests for compensation events.
The Contractor shall under no circumstances refuse additional work on the basis of costs as defined above
2.13 Training workshops and technology transfer
Over the shoulder training to be conducted with Eskom Field technicians.
PART C3: SCOPE OF WORK PAGE 10 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
PART C3: SCOPE OF WORK PAGE 11 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
4 Procurement
There is a cross reference from the definition of Disallowed Cost in Options C D and E to the Works
Information regarding procurement procedures. This part of the Works Information MUST include any such
procedures to be able to administer this procedure. Options A & B may also require constraints on
procurement procedures.
4.1 People
4.1.1 Minimum requirements of people employed on the Site
Do not forsee any constrains. Contractor/supplier to adhere to Health and Safety regulations as stipulated
and also minimum skills requirements as stipulated. Where permits are necessary for access to site the
necessary arrangements will be made by Eskom.
The Contractor complies with and fulfils the Contractor’s obligations in respect of the Accelerated and
Shared Growth Initiative - South Africa in accordance with and as provided for in the Contractor’s ASGI-SA
Compliance Schedule stated below
.
[Insert the agreed ASGI-SA Compliance Schedule here]
The Contractor shall keep accurate records and provide the Project Manager with reports on the Contractor’s
actual delivery against the above stated ASGI-SA criteria. [Elaborate on access to and format of records
and frequency of submission etc.]
The Contractor’s failure to comply with his ASGI-SA obligations constitutes substantial failure on the part of
the Contractor to comply with his obligations under this contract.
4.2 Subcontracting
4.2.1 Preferred subcontractors
Not Applicable.
PART C3: SCOPE OF WORK PAGE 12 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
PART C3: SCOPE OF WORK PAGE 13 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
5 Construction
Not Applicable
5.1.1 Employer’s Site entry and security control, permits, and Site regulations
Site access will be arranged prior to the contractor going to site. This also based on the approval of the
SHEQ requirements.
5.1.5 Environmental controls, fauna & flora, dealing with objects of historical interest
Not Applicable
PART C3: SCOPE OF WORK PAGE 14 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
5.1.11 Existing premises, inspection of adjoining properties and checking work of Others
The contractor to meet with and Ops and Field representative of Eskom on site.
PART C3: SCOPE OF WORK PAGE 15 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
On or before the Completion Date the Contractor shall have done everything required to Provide the Works
except for the work listed below which may be done after the Completion Date but in any case before the
dates stated. The Project Manager cannot certify Completion until all the work except that listed below has
been done and is also free of Defects which would have, in his opinion, prevented the Employer from using
the works and Others from doing their work.
5.2.4 Commissioning
Method statement to be provided. Commissioning will take place for each and every site completed. Air-
conditioner Installation procedure U02164 can be referred to.
PART C3: SCOPE OF WORK PAGE 16 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
PART C3: SCOPE OF WORK PAGE 17 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
PART C3: SCOPE OF WORK PAGE 18 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
7 List of drawings
7.1 Drawings issued by the Employer
This is the list of drawings issued by the Employer at or before the Contract Date and which apply to this
contract.
Note: Some drawings may contain both Works Information and Site Information.
PART C3: SCOPE OF WORK PAGE 19 C3.1 ECC3 EMPLOYER’S WORKS INFORMATION
ESKOM HOLDINGS SOC Ltd CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH WEST,
MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL
a) Contractor’s design
b) Plant and Materials specifications and schedules
c) Other
PART C3: SCOPE OF WORK PAGE 20 C3.2 ECC3 CONTRACTOR’S WORKS INFORMATION
EMPLOYER’S NAME CONTRACT NUMBER _____________
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF AIR-CONDITIONING UNITS IN GAUTENG, NORTH
WEST, MPUMALANGA AND LIMPOPO, INCLUSIVE OF INSTALLATION MATERIAL .
Document Title No of
reference pages
This cover page 1
C4 Site Information 3
GAUTENG REGION
Co-ordinates
Site Room type Access ddd mm ss.s format
Pretoria RS Brick Sedan S25 48 09 E28 15 22
Parys RS Brick Sedan S26 48 03.9 E27 28 53.7
Nelspruit
Co-ordinates
Site Room type Access ddd mm ss.s format
Three sisters RS Brick 4x4 S25 37 51.0 E31 23 14.0
Kaapsehop RS Brick Sedan S25 31 02.5 E30 46 37.9
Kaapsehoop Sentec RS Container Sedan S25 30 57.4 E30 46 34.9
Lebombo RS Container 4x4 S25 27 53.0 E31 58 44.0
Lochiel RS Container Sedan S26 06 54.2 E30 46 01.1
Lydenburg valley RS Brick Sedan S24 57 55.0 E30 22 42.0
Nelshoogte RS Brick 4x4 S25 51 50.0 E30 48 40.0
PMC Koppie RS Container Sedan S23 59 13.0 E31 09 17.0
Spekboom RS Brick Sedan S24 37 50.5 E30 30 21.5
Steelport RS Brick 4x4 S24 41 12.0 E30 11 34.0
Crossing RS Brick Sedan S24 45 17.6 E30 08 58.6
Limpopo
Co-ordinates
Site Room type ddd mm ss.s format
Nedbank buidling Brick Sedan S23 54 34.5 E29 27 11.4
New Thabazimbi Rs Brick Sedan S24 32 27.0 E27 24 10.3
Old Thabazimbi RS Brick Sedan S24 28 04.5 E27 36 43.3
Louis Trichard RS Brick 4x4 S23 00 12.3 E29 45 16.5
Ofcolaco Rs Brick Sedan S24 06 26.0 E30 25 30.0
Ravens hill Rs Container Sedan S23 37 11.7 E30 15 19.7
Steilloop RS Container Sedan S23 36 40.3 E28 49 27.2
Rooirandt RS Container Sedan S23 04 57.0 E28 27 33.0
Stylkop Container Sedan S24 12 01.0 E29 38 09.0
Zandspruit Rs Container Sedan S24 12 08.6 E28 55 16.0
Mangembe Container 4x4 S23 17 44,3 E 30 44 51,3
Witbank
Co-ordinates
Site Room type ddd mm ss.s format
Carolina RS Brick Sedan S26 01 43.0 E30 11 25.0
Carolina TSC Container Sedan S26 04 31.6 E30 07 30.4
De BrookRS Container Sedan S26 10 27.4 E30 38 05.4
Dewagendrift RS Container 4x4 S25 18 49.6 E29 26 24.1
Elandsdoorn RS Container 4x4 S25 15 51.9 E29 12 33.1
Golfsig RS Container Sedan S25 45 53.6 E29 26 22.3
Greenside 2 Container Sedan S25 58 13.8 E29 10 42.1
Groblersdal RS Brick Sedan S25 01 45.0 E29 24 45.0
Kenmeryl RS Brick Sedan S25 33 02.0 E30 13 36.0
Kriel RS Brick Sedan S26 15 38.0 E29 10 43.0
Kusile RS Container Sedan S25 55 18.0 E28 55 47.3
Machadodorp RS Brick Sedan S25 34 35.0 E30 11 07.0
Majuba Power station Radio Brick Sedan S27 05 41.1 E29 46 11.5
Majuba UCG Greenfield Container Sedan S27 04 46.8 E29 48 01.4
Piet Retief RS Brick Sedan S26 57 40.0 E30 47 08.0
Renosterkop RS Container Sedan S25 35 21.0 E28 56 43.0
Sheepmore RS Brick Sedan S26 46 32.0 E30 15 24.0
Standerton RS Brick Sedan S26 57 27.4 E29 12 49.7
Stofberg RS Brick Sedan S25 25 02.0 E29 47 45.0
Tavistock 3 Container Sedan S26 05 34.3 E29 11 00.9
Wildebees RS Brick Sedan S26 27 38.0 E29 09 28.0
Mahamba RS Container Sedan S27 07 53.8 E31 00 28.9