CH4- MAINTENANCE
DAY breakdown(Hr) 0.00
MTD (Hr) 2.25
MTTR(Day) 0.00
MTTR(Mtd) 2.25
CH4
MTBF(Day) 24.00
MTBF(Mtd) 189.75
Availability(DAY) 94.30%
Availability(Mtd) 94.04%
No Breakdown
CH3- MAINTENANCE
DAY breakdown(Hr) 0.00
MTD (Hr) 6.50
MTTR(Day) 0.00
MTTR(Mtd) 3.25
CH3
MTBF(Day) 24.00
MTBF(Mtd) 92.75
Availability(DAY) 100.00%
Availability(Mtd) 97.99%
No Breakdown
CH2- MAINTENANCE
DAY breakdown(Hr) 0.00
MTD (Hr) 0.00
MTTR(Day) 0.00
MTTR(Mtd) 0.00
CH2
MTBF(Day) 24.00
MTBF(Mtd) 192.00
Availability(DAY) 100.00%
Availability(Mtd) 98.96%
No Breakdown
CASTER- MAINTENANCE
DAY breakdown(Hr) 0.00
MTD (Hr) 0.00
CASTER
MTTR(Day) 0.00
MTTR(Mtd) 0.00
MTBF(Day) 24.00
MTBF(Mtd) 192.00
Availability(DAY) 100.00%
Availability(Mtd) 100.00%
No Breakdown
CH1- MAINTENANCE
DAY breakdown(Hr) 0.00
MTD (Hr) 0.00
MTTR(Day) 0.00
MTTR(Mtd) 0.00
CH1
MTBF(Day) 24.00
MTBF(Mtd) 192.00
Availability(DAY) 94.79%
Availability(Mtd) 98.17%
No Breakdown
Carbon KPI
Unit ###
GAP -
Production -Aditya(Good
Nos.
Anode)
Rejection-Aditya Nos.
Production -Hirakud(good
anode) Nos.
Rejection-Hirakud Nos.
CP coke consumption MT
Loss of Coke in GAP MT
Process
Butt Consumption MT
CT pitch consumption MT
Green scrap consumption MT
Paste rejection MT
Coke send to ABF MT
Power consumption KWH
Specific power
consumption(KWH/No)
BAKE OVEN -
Production -Aditya Nos.
Specific HFO consumption -
L/ no.
Aditya
Production -Hirakud Nos.
Specific HFO consumption -
Hirakud L/ No.
Availability CH-4
100%
96%
92%
88%
84%
80%
Availability CH-
100%
96%
92%
Availability CH-
100%
96%
92%
88%
84%
80%
CH Availability Report
Day8 Day9 Day10 Day11 Day12 Day13 Day14 Day15 Day16 Day17 Day18
94%
100%
100%
100%
95%
No of Break Downs
Day8 Day9 Day10 Day11 Day12 Day13 Day14 Day15 Day16 Day17 Day18
0
0
0
0
0
MTTR(MTD)
Day8 Day9 Day10 Day11 Day12 Day13 Day14 Day15 Day16 Day17 Day18
2.25
3.25
0.00
0.00
0.00
MTTR DAY
Day8 Day9 Day10 Day11 Day12 Day13 Day14 Day15 Day16 Day17 Day18
0.00
0.00
0.00
0.00
0.00
MTBF (MTD)
Day8 Day9 Day10 Day11 Day12 Day13 Day14 Day15 Day16 Day17 Day18
189.75
92.75
192.00
192.00
192.00
MTBF (DAY)
Day8 Day9 Day10 Day11 Day12 Day13 Day14 Day15 Day16 Day17 Day18
24.00
24.00
24.00
24.00
24.00
Day19 Day20 Day21 Day22 Day23 Day24 Day25 Day26 Day27 Day28
Day19 Day20 Day21 Day22 Day23 Day24 Day25 Day26 Day27 Day28
Day19 Day20 Day21 Day22 Day23 Day24 Day25 Day26 Day27 Day28
Day19 Day20 Day21 Day22 Day23 Day24 Day25 Day26 Day27 Day28
Day19 Day20 Day21 Day22 Day23 Day24 Day25 Day26 Day27 Day28
Day19 Day20 Day21 Day22 Day23 Day24 Day25 Day26 Day27 Day28
vailability CH-3
Distribution Trough
9 CH-3 Casting temperature
monitoring display
F/C-1 Combustion
20 CH-4 F/C-1
motor
21 CH-3 Casting Spout heater
Cooling Tower
24 CH-2 Water nozzle
Area
25 CH-3 Casting Meltech Crane
fire retardant paint not available panel cable and in naked Elect
condition
01/02/23 Rajkishor,Purna
01/02/23 Rajkishor
01/02/23 Pradyumna
02/02/23 Rajkishor
02/02/23 Pradyumna
04/02/23 Pradyumna
Nothing Closed
Nothing Closed
Nothing Closed
Nothing Closed
Nothing Closed
Nothing Closed
Nothing Closed
Fuse Closed
Nothing Closed
Element Closed
Nothing Closed
Nothing Closed
Srikant
siba das, jyoti, Ashirbad.
Srikant,sulekh
Purna,Rajkishore,Dilip, Chinmaya,Akshaya,
Radheshyam
Rajkishore,Purna,Dilip, Radheshyam
Rajkishore,Purna,Dilip, Radheshyam,chinmaya
Pradyumna
Rajendra, Tara
Bharat,Chinmaya, Jalandhar
Purna, Akshaya
Pradyumna
Pradyumna
Hrishikesh, Tara
Pradyumna, Utkal
Sagar, Tapna
Pradyumna, Utkal
Akshaya, Dilip
Ranjit, dinesh
Ashirbad,Rabindra
BREAKDOWN DE
25/10 RI Crane CRD motor power contactor damaged,so new contactor replacement done. Elect
Start time End time Total duration Total Production Loss
(Minutes) duration(Hr) MTD due to B/D
1/Feb
2/Feb
3/Feb
4/Feb
5/Feb
Equipment MTD
Critical(SC)
11/Feb
12/Feb
13/Feb
14/Feb
15/Feb
16/Feb
17/Feb
18/Feb
19/Feb
20/Feb
6/Feb
7/Feb
8/Feb
9/Feb
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0.00 0.00 0.00
0 0 0
32.00 26.00 26.00
93% 94% 94%
21/Feb
22/Feb
23/Feb
24/Feb
25/Feb
26/Feb
27/Feb
28/Feb
10/Feb
11/Feb
12/Feb
13/Feb
14/Feb
15/Feb
16/Feb
17/Feb
18/Feb
19/Feb
20/Feb
21/Feb
22/Feb
23/Feb
24/Feb
25/Feb
26/Feb
27/Feb
28/Feb
Actual WO
1/Feb
2/Feb
3/Feb
4/Feb
5/Feb
6/Feb
7/Feb
8/Feb
9/Feb
Completion Date Work Order Department Scheduled Start Date Asset Number Asset Description Area PTW No Start Time End Time Equipment Critical/Semi Critical MTD
01/02/2023 PM274833 MECH-CH4 2023/02/11 6:00 HS-AS-E-CRN-MEL-25T-415-0003 25/10 RI CRANE(OLD) CH-4 HKDSP/CH/FY23/GWP/10994 2:30 PM 5:30 PM CRANE-1 (25/10T) NEW CRITICAL 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
01/02/2023 EI-CH4 25/10 RI CRANE(OLD) CH-4 HKDSP/CH/FY23/GWP/10964 2:00 PM 5:00 PM CRANE-2 (25/10T) RI LIFTING CRITICAL 3.50 3.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0
02/02/2023 PM272022 EI-CH4 2023/02/01 6:00 HS-AS-S-GPL-STA-805-AFW-0001 ACD GAS PANEL CH-4 HKDSP/CH/FY23/GWP/11020 9:30 AM 11:30 AM CRANE-1 (20/10T) AUTO CRITICAL 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
02/02/2023 PM272074 MECH-CH4 2023/02/01 6:00 HS-AS-S-GPL-STA-805-AFW-0001 ACD GAS PANEL CH-4 HKDSP/CH/FY23/GWP/11044 10:00 AM 12:00 PM CRANE-2 (20/10T VC POURING) CRITICAL 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
02/02/2023 PM271984 EI-CH4 2023/02/01 6:00 HS-AS-E-DEG-STA-805-8-0002 ALCAN COMPACT DEGASSER CH-4 HKDSP/CH/FY23/GWP/11020 9:30 AM 11:30 AM Cooling Tower CRITICAL 8.00 0.0 0.0 0.0 2.0 0.0 4.0 0.0 2.0
02/02/2023 PM272057 MECH-CH4 2023/02/01 6:00 HS-AS-E-DEG-STA-805-8-0002 ALCAN COMPACT DEGASSER CH-4 HKDSP/CH/FY23/GWP/11044 10:00 AM 12:00 PM F/C-1 CRITICAL 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
02/02/2023 PM272008 EI-CH4 2023/02/01 6:00 HS-AS-S-BWR-STA-BLO-3A3-0001 ALCAN COMPACT DEGASSER BLOWER CH-4 HKDSP/CH/FY23/GWP/11020 9:30 AM 11:30 AM F/C-2 CRITICAL 192.00 24.0 24.0 24.0 24.0 24.0 24.0 24.0 24.0
02/02/2023 PM272073 MECH-CH4 2023/02/01 6:00 HS-AS-S-BWR-STA-BLO-3A3-0001 ALCAN COMPACT DEGASSER BLOWER CH-4 HKDSP/CH/FY23/GWP/11044 10:00 AM 12:00 PM F/C-3 CRITICAL 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
03/02/2023 EI-CH4 BATTERY BANK CH-4 HKDSP/CH/FY23/GWP/11100 11:00 AM 4:45 PM F/C-4 CRITICAL 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
03/02/2023 PM272170 EI-CH4 2023/02/03 6:00 HS-AS-E-CFF-DRA-DFB-26I-0001 CERAMIC FOAM FILTER CH-4 HKDSP/CH/FY23/GWP/11097 11:00 AM 12:00 PM W.C. M/C CRITICAL 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
04/02/2023 PM272295 MECH-CH4 2023/02/04 6:00 HS-AS-S-PMP-KIR-38B-CEN-0002 COLD WELL PUMP-1 CH-4 HKDSP/CH/FY23/GWP/11158 10:30 AM 12:30 PM Compressor CRITICAL 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
04/02/2023 PM272263 EI-CH4 2023/02/04 6:00 HS-AS-S-PMP-KIR-38B-CEN-0002 COLD WELL PUMP-1 CH-4 HKDSP/CH/FY23/GWP/11133 10:30 AM 12:30 PM CFF SEMI CRITICAL 1.00 0.0 0.0 1.0 0.0 0.0 0.0 0.0 0.0
04/02/2023 PM275210 MECH-CH4 2023/02/15 6:00 HS-AS-S-PMP-KIR-38B-CEN-0003 COLD WELL PUMP-3 CH-4 HKDSP/CH/FY23/GWP/11158 10:30 AM 12:30 PM DBF SEMI CRITICAL 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
04/02/2023 PM272288 MECH-CH4 2023/02/04 6:00 HS-AS-E-GRA-LSS-21M-415-0002 ELECTRICAL GRAB CH-4 HKDSP/CH/FY23/GWP/11153 10:30 AM 12:30 PM ACD SEMI CRITICAL 2.50 0.0 2.5 0.0 0.0 0.0 0.0 0.0 0.0
04/02/2023 PM272251 EI-CH4 2023/02/04 6:00 HS-AS-E-GRA-LSS-21M-415-0002 ELECTRICAL GRAB CH-4 HKDSP/CH/FY23/GWP/11129 10:30 AM 12:30 PM EMS SEMI CRITICAL 2.00 0.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0
04/02/2023 PM272294 MECH-CH4 2023/02/04 6:00 HS-AS-S-PMP-KIR-38A-CEN-0001 HOT WELL PUMP-1 CH-4 HKDSP/CH/FY23/GWP/11158 10:30 AM 12:30 PM RFI SEMI CRITICAL 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
04/02/2023 PM272262 EI-CH4 2023/02/04 6:00 HS-AS-S-PMP-KIR-38A-CEN-0001 HOT WELL PUMP-1 CH-4 HKDSP/CH/FY23/GWP/11133 10:30 AM 12:30 PM F.O. System SEMI CRITICAL 4.00 0.0 0.0 0.0 0.0 0.0 4.0 0.0 0.0
06/02/2023 PM274815 EI-CH4 2023/02/11 6:00 HS-AS-S-PMP-KIR-38B-CEN-0001 COLD WELL PUMP-2 CH-4 HKDSP/CH/FY23/GWP/11183 2:00 PM 4:00 PM Scrap Charging M/C SEMI CRITICAL 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
06/02/2023 PM274846 MECH-CH4 2023/02/11 6:00 HS-AS-S-PMP-KIR-38B-CEN-0001 COLD WELL PUMP-2 CH-4 HKDSP/CH/FY23/GWP/11213 2:00 PM 4:00 PM SOMERS GRAB SEMI CRITICAL 2.00 0.0 0.0 0.0 2.0 0.0 0.0 0.0 0.0
06/02/2023 PM274955 EI-CH4 2023/02/13 6:00 HS-AS-S-PMP-DPD-F30-TSP-0001 DOSING PUMP-1 CH-4 HKDSP/CH/FY23/GWP/11188 2:00 PM 4:00 PM Planned shutdown/PM -CH4 215.00 27.50 26.50 25.00 28.00 24.00 32.00 26.00 26.00
06/02/2023 PM274987 MECH-CH4 2023/02/13 6:00 HS-AS-S-PMP-DPD-F30-TSP-0001 DOSING PUMP-1 CH-4 HKDSP/CH/FY23/GWP/11220 2:00 PM 4:00 PM
06/02/2023 PM274814 EI-CH4 2023/02/11 6:00 HS-AS-S-PMP-KIR-38A-CEN-0003 HOT WELL PUMP-2 CH-4 HKDSP/CH/FY23/GWP/11183 11:00 AM 1:00 PM
06/02/2023 PM274845 MECH-CH4 2023/02/11 6:00 HS-AS-S-PMP-KIR-38A-CEN-0003 HOT WELL PUMP-2 CH-4 HKDSP/CH/FY23/GWP/11213 11:00 AM 1:00 PM
06/02/2023 PM272260 EI-CH4 2023/02/04 6:00 HS-AS-S-PMP-DPD-F80-EGR-0001 UNLOADING & TRANSFER PUMP-1 CH-4 HKDSP/CH/FY23/GWP/11188 11:00 AM 1:00 PM PLANNED SHUTDOWN F/C-2 REFRACTORY REPLACEMENT WORK
06/02/2023 PM272293 MECH-CH4 2023/02/04 6:00 HS-AS-S-PMP-DPD-F80-EGR-0001 UNLOADING & TRANSFER PUMP-1 CH-4 HKDSP/CH/FY23/GWP/11217 11:00 AM 1:00 PM
07/02/2023 PM272562 EI-CH4 2023/02/08 6:00 HS-AS-S-WSM-ABB-HSD-HSD-0001 EMS WATER SYSTEM CH-4 HKDSP/CH/FY23/GWP/11257 2:30 PM 4:30 PM
07/02/2023 PM272613 MECH-CH4 2023/02/08 6:00 HS-AS-S-WSM-ABB-HSD-HSD-0001 EMS WATER SYSTEM CH-4 HKDSP/CH/FY23/GWP/11262 2:45 PM 4:30 PM
08/02/2023 PM272559 EI-CH4 2023/02/08 6:00 HS-AS-S-IDF-PHE-CDF-15K-0002 DRAFT FAN-1 CH-4 HKDSP/CH/FY23/GWP/11311 3:00 PM 5:00 PM
08/02/2023 MECH-CH4 LPG BANK CH-4 HKDSP/CH/FY23/GWP/11315 4:30 PM 5:30 PM
09/02/2023 PM272371 EI-CH4 2023/02/06 6:00 HS-AS-E-COM-KIR-1KC-DRM-0001 RECIPROCATING COMPRESSOR MAKE KIRLOSKAR CH-4 HKDSP/CH/FY23/GWP/11330 10:00 AM 11:00 AM
MODEL - TBTDRM
09/02/2023 PM272665 EI-CH4 2023/02/09 6:00 HS/CH/C/F/RMSA/SCM SCRAP CHARGING MACHINE CH-4 HKDSP/CH/FY23/GWP/11353 11:30 AM 1:00 PM
09/02/2023 PM272662 EI-CH4 2023/02/09 6:00 HS-AS-S-PUS-ATC-D50-458-0001 WAGSTAFF CASTING MACHINE UTILITY STAND CH-4 HKDSP/CH/FY23/GWP/11363 3:00 PM 5:00 PM
09/02/2023 PM272663 EI-CH4 2023/02/09 6:00 HS-AS-S-WFS-HYD-35B-WAT-0001 WAGSTAFF MACHINE WATER FILTER STAND CH-4 HKDSP/CH/FY23/GWP/11363 3:00 PM 5:00 PM
BREAKDOWN DETAIL DC-3 FEB
F/C-B
W.C. M/C
Compressor
ACD
CFF
F.O. System
SOMERS GRAB
No of breakdowns -CH3
Planned shutdown/PM -
CH3(Hr)
Availabilty CH3
10/Feb
11/Feb
12/Feb
Critical(C)/Semi
1/Feb
2/Feb
3/Feb
4/Feb
5/Feb
6/Feb
7/Feb
8/Feb
9/Feb
MTD
Critical(SC)
CRITICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
CRITICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
CRITICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
CRITICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
CRITICAL 4.5 0.0 0.0 0.0 0.0 4.50 0.0 0.0 0.0
CRITICAL 2.0 0.0 0.0 0.0 0.0 0.0 2.0 0.0 0.0
SEMI CRITICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SEMI CRITICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SEMI CRITICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
SEMI CRITICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
14/Feb
15/Feb
16/Feb
17/Feb
18/Feb
19/Feb
20/Feb
21/Feb
22/Feb
23/Feb
24/Feb
25/Feb
26/Feb
27/Feb
28/Feb
Actual Completion Area Work Order WO Department
Date
2/Feb
3/Feb
4/Feb
Equipment Critical/Semi Critical MTD
11/Feb
12/Feb
13/Feb
14/Feb
15/Feb
16/Feb
17/Feb
18/Feb
19/Feb
5/Feb
6/Feb
7/Feb
8/Feb
9/Feb
0.0 0.0 0.0 0.0
21/Feb
22/Feb
23/Feb
24/Feb
25/Feb
26/Feb
27/Feb
28/Feb
BREAKDOWN DETAIL DC-2 FEBRU
Cooling Tower
ALPUR
SELE BURNER
DCP
F/C-1
F/C-2
Compressor
HPP
COLD WELL
HOT WELL
PSF
PSF PUMP
EMERGENCY PUMP
NITROGEN LINE
No of breakdowns -CH2
Planned shutdown/PM -
CH2(Hr)
Availabilty CH2
Critical(C)/
10/Feb
11/Feb
1/Feb
2/Feb
3/Feb
4/Feb
5/Feb
6/Feb
7/Feb
8/Feb
9/Feb
Semi MTD
Critical(SC)
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
SEMI
CRITICAL 0.00 0 0 0 0 0 0 0 0
SEMI
CRITICAL 0.00 0 0 0 0 0 0 0 0
SEMI
CRITICAL 0.00 0 0 0 0 0 0 0 0
SEMI
CRITICAL 0.00 0 0 0 0 0 0 0 0
SEMI
CRITICAL 0.00 0 0 0 0 0 0 0 0
SEMI
CRITICAL 0.00 0 0 0 0 0 0 0 0
SEMI
CRITICAL 0.00 0 0 0 0 0 0 0 0
SEMI
CRITICAL 0.00 0 0 0 0 0 0 0 0
0.00 0 0 0 0 0 0 0 0
13/Feb
14/Feb
15/Feb
16/Feb
17/Feb
18/Feb
19/Feb
20/Feb
21/Feb
22/Feb
23/Feb
24/Feb
25/Feb
26/Feb
27/Feb
28/Feb
Actual Completion Area Work Order WO Department Scheduled Start Date
Date
11/Feb
12/Feb
13/Feb
14/Feb
15/Feb
1/Feb
2/Feb
3/Feb
4/Feb
5/Feb
6/Feb
7/Feb
8/Feb
9/Feb
0 0 0 0 0 0 2 0
0 0 0 0 0 0 0 0
0 0 0 0 0 2.75 0 0
2 0 2.9 0 0 0 0 0
1 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
2.33 0 3.9 0 0 2 2.17 0
3.25 2.92 0 0 0 0 0 0
1.25 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 2 0 0 0 0 0
0 0 1.5 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 2 0 0 0 0 0 0
0 0 0 0 0 0 0 0
9.83 4.92 10.32 0.00 0.00 4.75 4.17 0.00
16/Feb
17/Feb
18/Feb
19/Feb
20/Feb
21/Feb
22/Feb
23/Feb
24/Feb
25/Feb
26/Feb
27/Feb
28/Feb
BREAKDOWN DETAIL CASTER
1/Feb
2/Feb
3/Feb
4/Feb
5/Feb
6/Feb
Equipment MTD
Critical(SC)
0
7/Feb
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
8/Feb
0.00
0.00
100% 100%
9/Feb
10/Feb
11/Feb
12/Feb
13/Feb
14/Feb
15/Feb
16/Feb
17/Feb
18/Feb
19/Feb
20/Feb
21/Feb
22/Feb
23/Feb
24/Feb
25/Feb
26/Feb
27/Feb
28/Feb
Actual
Completion Area Work Order WO Department Scheduled Start Date
Date
Asset Number Asset Description PTW No
Start Time End Time Equipment
Cooling Tower
CRANE 15 MT
CRANE 20 MT
Lathe
Compressor/ Dryer
Roll Grinder
Bail Press
Casting Coiler
15T FURNACE-1
15T FURNACE-2
Planned shutdown/PM -Caster
10/Feb
11/Feb
1/Feb
2/Feb
3/Feb
4/Feb
5/Feb
6/Feb
7/Feb
8/Feb
9/Feb
Critical/Semi Critical MTD
CRITICAL
0.00 0 0 0 0 0 0 0 0
CRITICAL
0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12/Feb
13/Feb
14/Feb
15/Feb
16/Feb
17/Feb
18/Feb
19/Feb
20/Feb
21/Feb
22/Feb
23/Feb
24/Feb
25/Feb
26/Feb
27/Feb
28/Feb
BREAKDOWN DETAIL DC1 (CH1) FEBRU
Availabilty CH1
Critical(C)/Semi
1/Feb
2/Feb
3/Feb
4/Feb
5/Feb
6/Feb
7/Feb
8/Feb
9/Feb
MTD
Critical(SC)
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
CRITICAL 0.00 0 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0 0 0 0 0 0 0 0
28.08 0.00 2.08 0.00 0.00 0.00 7.00 9.00 10.00
11/Feb
12/Feb
13/Feb
14/Feb
15/Feb
16/Feb
17/Feb
18/Feb
19/Feb
20/Feb
21/Feb
22/Feb
23/Feb
24/Feb
25/Feb
26/Feb
27/Feb
28/Feb
Actual Scheduled Start
Completion Date Area Work Order WO Department Date
2/Feb
3/Feb
End Time Equipment Critical/Semi Critical MTD
0.00
0
0
0
0
0
0
0
0
5/Feb
0
0
0
7
0
0
0
0
6/Feb
2
0
0
2
0
0
2.5
2.5
7/Feb
0
3
4
0
0
3
0
0
8/Feb
10/Feb
11/Feb
12/Feb
13/Feb
14/Feb
15/Feb
16/Feb
17/Feb
18/Feb
19/Feb
20/Feb
21/Feb
22/Feb
23/Feb
24/Feb
25/Feb
26/Feb
27/Feb
28/Feb
MECH-PM
Scheduled Start
Work Order WO Department Asset Number
Date
PM272074 MECH-CH4 2023/02/01 6:00 HS-AS-S-GPL-STA-805-AFW-0001
PM272057 MECH-CH4 2023/02/01 6:00 HS-AS-E-DEG-STA-805-8-0002
PM272073 MECH-CH4 2023/02/01 6:00 HS-AS-S-BWR-STA-BLO-3A3-0001
PM272093 MECH-CH4 2023/02/02 0:00 HS-AS-E-CGM-WAG-65M-HMR-0001
PM272137 MECH-CH4 2023/02/02 6:00 HS-AS-S-BUR-WES-551-WAL-0006
PM272139 MECH-CH4 2023/02/02 6:00 HS-AS-S-HYP-CON-275-32K-0002
PM272138 MECH-CH4 2023/02/02 6:00 HS-AS-S-HSM-REX-150-415-0001