Al Thumama Stadium and the Precinct Project

PMU TEST
Date: Select date.
MDB Panel No :
Bldg. :_______________________________________________________________________
Location :_______________________________________________________________________
Level/Zone :_______________________________________________________________________

Test Equipment: Cal. No.


Calibration Date: Cal. Due Date:

TEST CONDITION NO,1 TEST CONDITION NO.2

PHASE COMPARISON OF MEASURED PHASE COMPARISON OF


VALUES MEASURED VALUES
PMU CLAMP PMU CLAMP
METER METER
I1 I1

I2 I2

I3 I3

TEST CONDITION NO.3

PHASE COMPARISON OF MEASURED


VALUES
PMU CLAMP METER

I1

I2

I3

Remarks:

Test Result Pass Fail

Test WITNESSED:
Mep Subcontractorctor: System Provide: Main Contractor:
Name: Name: Name:
Date: Date: Date:
Signature Signature Signature
3rd Party Consultant: Technical Consultant PMCM:
Name: Name: Name:
Date: Date: Date:
Signature Signature Signature