Al Thumama Stadium and the Precinct Project

MDB Functional Test Report


Date
:
MDB Panel No
Bldg. :
Location :
Level/Zone :

S.NO DESCRIPTION OBSERVATION COMMENTS

1) POWER SUPPLY
L1-N L2-N L3-N
A) PHASE VOLTAGE

L1-N L2-N L3-N


B) LINE VOLTAGE

C) FREQUANCY

D) PHASE SEQUENCE

L1-N L2-N L3-N


E) AMPHERE

F) VOLTMETER FUNCTION

G) AMMETER FUNCTION

H) FUNCTION OF INDICATION LAMO

I) MCCB ON/OFF FUNCTION

J) HEATER

K) FANS

1.BATTERY CHARGER OUTPUT VOLTAGE


MEASURED:
L)
When AC 230V ON:
When AC 230V OFF:

2.Check ACB tripping 3 Times without AC supply

H) STATUS VERIFICATION

STATUS DESCRIPTION OBSERVATION COMMENTS

1.ACB OPEN/CLOSE STATUS TO BMS

2.ACB TRIP STATUS TO BMS


Al Thumama Stadium and the Precinct Project

MDB Functional Test Report

3.MCCB OPEN/CLOSE STATUS TO BMS

4.MCCB TRIP STATUS TO BMS

5.POWER FAILURE STATUS

6.REF TRIP STATUS

7.HAND & AUTO MODE STATUS

8.DG START COMMAMD

9.BATTERY HELTHY STATUS

10.RS 485 COMMUNICATION TO BMS FOR MFM


AND ATS CONTROLLER STATUS

REMARKS

T&C RESULT: PASS FAIL

TEST WITNEESS
MEP Subcontractor: System Provider: Main Contractor:

Name: Name: Name:


Date : Date : Date :
Signature: Signature: Signature:

3rd Party Consultant: Technical Consultant: PMCM:

Name: Name: Name:


Date : Date : Date :
Signature: Signature: Signature: