You are on page 1of 3

Preventive Maintenance Report for

BNG (Supplied by UTStarcom)

Circle/City Information: KS/Raichur /Raichur - BNG

MM/20-85/2005-06/BMP/UTS dated 28/12/2006


MM/20-85/2008-09/BMP/UTS dated 20/09/2008
PO Number: MM/20-85/2008-09/BMP/UTS dated 23/01/2009
(Select proper PO) MM/20-85/2008-09/BMP/UTS dated 29/01/2009
MM/20-85/2008-09/BMP/UTS dated 18/04/2009

Name & Designation of BSNL Node-in-charge:

Name of UTStarcom Engineer:

Period of Preventive Maintenance: July – Auguest – September - 2020

Application Name (if applicable):

Part I : Inventory History Details:


Sl No Name Product Qty Qty Description
code Installed Present
1 SE800 Chassis 908-0426  01  01 Redback SE800s Chassis includes Fan Tray,
Power Module with redundant 48V DC Input

2 ge3-4-port Card 908-0406     4-port GE3 Ethernet Card


3 ge-4-port Card 908-0413     4-port Gigabit Ethernet Card - ADV
4 oc48-1-port Card 908-0347     OC-48c/STM-16 Card
5 XCRP Card 908-0394     Cross-Connect Route Processor Card
Part II: Preventive Maintenance Procedure
A. Physical Inspection before starting of the Preventive Maintenance
1. Check the Status of the LEDs on XCRP cards
2. Check the Status of the LEDs on GE cards
3. Check the Status of the LEDs on OC-48c/STM-16c Cards
4. Check the Status of the LEDs / Alarms on the Chassis
B. PM Check List

Sl. No Check list for PM activity of BNG Status Remarks


(Y/N)
1 Take the running configuration backup    
2 Below command output logs to be taken for post activity    
checking
a Show version    
b show chassis    
c show chassis power    
d show chassis power inventory    
e show redundancy    
f show process cpu status    
g show context all    
h show port all    
i show subscribers summary all    
j show tech-support    
3 Cleaning outer part of the chassis    
4 Remove the Filter, clean and reinsert the same as soon as    
possible
5 Checking the Line Cards    
a Compare the port level configuration of the card with    
backup
b Check for the mgmt and service level statistics (show arp,    
show sub sum all, sh port all)
6 Compare all the link status, service status, redundancy    
status etc with the backup

C. Confirmation on the Cards Status

Following cards are tested and found OK. The output from the various commands (that were executed during preventive
maintenance) is attached/seen.

1. XCRP Cards ( Active and Standby) :


2. GE3-4 Port Cards :
3. GE – 4 Port Card :
4. OC-48c/STM-16c Card :
5. Fan Tray :
6. Others (if any) :

Part III: Conclusion & Summary

Sl No Preventive Maintenance Report  


1 Address of Location:  
Raichur - BNG

2 IP Address & Hostname of the Node:  

3 Software Version  SEOS 6.2.1.8


4 Working Condition of Chassis (remarks)  Normal
5 Contact Numbers:  
     
     

Remarks, if any (for overall)

__________________________________NIll__________________________________________________________

________________________________________________________________________________________________

________________________________________________________________________________________________

____

Signature of Signature of
Vendor Representative: BSNL Node In-Charge:
(Not below SDE)
Name: Name:
Location: Location:

You might also like